Informs of Requalification Program Evaluation Visit Scheduled for Wk of 871026 Per 870609 Telcon W/R Buckner & J Bjorgen.Nrc Will Administer Written & Oral Exams.Facility to Furnish Approved Ref Matl Listed in Encl 1 by 870824
ML20215B213
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/10/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8706170258
Download: ML20215B213 (3)


Text

'

' 1 o ,

Docket No. 50-155 JtJN 101987-Consumers Power' Company

. ATTN: Dr. F. ~W. Buckman Vice President Nuclear Operations 212 West Michigan Avenue

' Jackson, MI 49201

Dear Mr. Buckman:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION

.In a', telephone conversation between Mr. Richard Buckner of your Training

. Department, and Mr. John Bjorgen, License Examiner on June 9,1987, arrange-ments were made for an' evaluation of the requalification program at the Big

Rock Point Nuclear Plant. The evaluation visit is scheduled for the week of October 26, 1987.

- For this' visit, the NRC examiners will administer NRC prepared written, and oral examinations. When' the NRC examiner arrives at the site, he will meet with the appropriate facility personnel' to review the schedule for those examinations.

For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in. Enclosure 1,

'" Reference Mater _ial Requirements for Requalification Program Evaluations," by

~ August 24, 1987. Mr. Buckner has been advised of our reference material requirements and where they are to be sent..

i This request for information was approved h the Office of Management and Bu'dget.

under Clearance Number 3150-0101, which c:pires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C.

20503.-

Thank you f.or your consideration in this matter. If you have any questions on the evaluation process, please contact John Bjorgen, Chief Examiner, at 312-790-5500.

Sincerely, Od;inal Sigad By C. W. Hehl Charles W. Hehl, Chief Operations Branch

Enclosure:

As stated

. See Attached Distribution 8706170258 870610E PDR ADOCK 05000155 V. .

PDR, RII RI I- RIII RI I B gen /lc BuYdick Jc H 6 7 /87 6q/87 6/ 87 6/ /87 g.

L

' Consumers Power Company. 2

.jUN 101987 cc w/ enclosure:

Mr. Kenneth W. Berry, Director Nuclear Licensing l D. P. Hoffman, Plant Superintendent l DCS/RSB (RIDS) l

-Licensing Fee Management Branch l Resident Inspector, RIII  !

Ronald Callen, Mir.higan Public Service Commission Nuclear Facilities and Environmental Monitoring Section Richard Buckner, Training Supervisor  ;

cc w/o enclosure:

J. Hall, Project Manager, NRR J. N. Hannon, Branch Chief, OLB j R. W. Cooper, NRR l

1 4

i l

l

ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation

1. All administrative procedures (as applicable to reactor operation or safety)
2. All integrated plant procedures (normal or general operating procedures) 3.- Emergency procedures (emergency instructions, abnormal, or special  !

procedures) .

4. Standing orders (important orders which are safety-related to and may supersede the regular procedures)
5. - Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate)
6. Annunciator procedures (alarm procedures, including set points) l
7. Radiation protection manual (radiation control manual or procedures)
8. Emergency plan l
9. Technical Specifications j
10. Lesson plans (training manuals, plant orientation manual, systems descriptions) j 4
11. Systems operating procedures )

1

12. Piping and instrumentation diagrams, electrical single-line diagrams, l or flow diagrams J
13. Copies of facility R0 and SR0 requalification examinations administered during the past 2 years j 4
14. A synopsis of the subjects and material covered in the requalification program for the past two years
15. An index of administrative, operating, abnormal and emergency procedures
16. Plant technical data (curve) book All of. the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.