Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous FindingsML20246D089 |
Person / Time |
---|
Site: |
McGuire, Mcguire |
---|
Issue date: |
08/09/1989 |
---|
From: |
Cooper T, Shymlock M, Vandoorn K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
---|
To: |
|
---|
Shared Package |
---|
ML20246D068 |
List: |
---|
References |
---|
50-369-89-18, 50-370-89-18, IEB-88-010, IEB-88-10, NUDOCS 8908250248 |
Download: ML20246D089 (9) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:UTILITY
MONTHYEARIR 05000369/19900201990-11-0707 November 1990 Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101. No Violations or Deviations Noted.Major Areas Inspected: Design Changes & Mod & Engineering Support Activities IR 05000369/19900191990-10-0404 October 1990 Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of NDE Procedures, Observations of in-progress NDE Exams & Insp Plan IR 05000369/19900171990-09-11011 September 1990 Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities & Facility Mods IR 05000369/19900151990-09-10010 September 1990 Insp Repts 50-369/90-15 & 50-370/90-15 on 900813-17. Violations Noted But Not Cited.Major Areas Inspected:Annual Emergency Exercise ML20056A5861990-07-24024 July 1990 Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625. Violations Noted.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities, Facility Mods & Follow Up of Events Repts ML20055H4841990-07-13013 July 1990 Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705. Violations Noted.Major Areas inspected:licensee-identified Issues Re Unit 1 Diesel Generator Inoperability for Approx 26 H on 900625-26 IR 05000369/19890301989-09-20020 September 1989 Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000369/19890151989-09-0707 September 1989 Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09,19-23 & 0728.No Violations or Deviations Noted.Major Areas Inspected:Maint Program & Program Implementation IR 05000369/19890291989-08-31031 August 1989 Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications IR 05000369/19890261989-08-30030 August 1989 Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys IR 05000369/19890221989-08-17017 August 1989 Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Previous Open Item IR 05000369/19890211989-08-16016 August 1989 Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18. Violations Noted.Major Areas Inspected:Operation of Unit 1 Following Improperly Performed Heat Balance & Concomitant Nonconservative Calibr of Power Range Nuclear Instruments IR 05000369/19890201989-08-16016 August 1989 Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity IR 05000369/19890181989-08-0909 August 1989 Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous Findings IR 05000369/19890161989-08-0808 August 1989 Insp Repts 50-369/89-16 & 50-370/89-16 on 890622-28.One Violation & One Deviation Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on LER & Previous Insp Findings IR 05000369/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-369/89-23 & 50-370/89-23 on 890727 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Security Event Logs IR 05000369/19890191989-07-19019 July 1989 Insp Repts 50-369/89-19 & 50-370/89-19 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Unit 2 Insp Plan for Outage,Nde procedures,in-progress NDE Exams & NDE Equipment Calibr ML20236E6471989-07-13013 July 1989 Insp Repts 50-369/89-14 & 50-370/89-14 on 890422-0601. Violation Noted.Major Areas Inspected:Operation Safety Verification,Surveillance Testing,Maint activities,10CFR21 Reviews,Followup on Previous Insp Findings & LERs IR 05000369/19890171989-07-10010 July 1989 Insp Repts 50-369/89-17 & 50-370/89-17 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Responses to Previous Insp Findings,Including Followup on NRC Bulletins 88-001 & 88-003 & on 10CFR21 Rept on Breakers ML20244E5881989-06-0505 June 1989 Insp Repts 50-369/89-11 & 50-370/89-11 on 890330-0421. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890131989-06-0101 June 1989 Partially Withheld Insp Repts 50-369/89-13 & 50-370/89-13 on 890501-05 (Ref 10CFR2.790 & 73.21).Two Noncited Violations Noted Re Failure to Conduct Psychological Exam.Major Areas Inspected:Mgt Support,Record & Repts & Lighting ML20247M5801989-05-15015 May 1989 Insp Repts 50-369/89-10 & 50-370/89-10 on 890404-07.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Requirements & Practices Implemented During Licensee Response to Steam Generator B Tube Rupture IR 05000369/19890021989-04-25025 April 1989 Operational Safety Team Insp Repts 50-369/89-02 & 50-370/89-02 on 890213-17 & 0227-0322.Violations Noted.Major Areas Inspected:Operations,Maint Support of Operations,Mgt Controls & Emergency Operating Procedures ML20245G9781989-04-20020 April 1989 Insp Repts 50-369/89-05 & 50-370/89-05 on 890228-0329. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890071989-04-17017 April 1989 Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing IR 05000369/19890061989-04-10010 April 1989 Insp Repts 50-369/89-06 & 50-370/89-06 on 890308-11.Major Areas Inspected:Events Re 890307 Steam Generator B Tube Failure.Procedures Found to Have Weaknesses Which Could Result in Release of Radioactivity to Environ IR 05000369/19890081989-04-0606 April 1989 Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube IR 05000369/19890091989-03-30030 March 1989 Partially Withheld Insp Repts 50-369/89-09 & 50-370/89-09 on 890220-24 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Security Program Audit,Records & Repts & Compensatory Measures IR 05000369/19890031989-03-30030 March 1989 Insp Repts 50-369/89-03 & 50-370/89-03 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Triennial post-fire Safe Shutdown Capability Reverification & Assessment (Module 64150) ML20244A8831989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures IR 05000369/19890011989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures ML20235P5621989-02-0707 February 1989 Insp Repts 50-369/88-33 & 50-370/88-33 on 881122-890119. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint activities,10CFR21 Insp,Startup from Refueling & Followup on Previous Insp IR 05000369/19880301988-11-0404 November 1988 Insp Repts 50-369/88-30 & 50-370/88-30 on 880924-1020. Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880271988-10-28028 October 1988 Insp Repts 50-369/88-27 & 50-370/88-27 on 880913-16.No Violations or Deviations Noted.Weakness Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise IR 05000369/19880281988-10-14014 October 1988 Partially Withheld Insp Repts 50-369/88-28 & 50-370/88-28 on 880912-16 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Maint Barriers,Assessment Aids,Access Controls,Alarm Stations & Training & Contingencies IR 05000369/19880261988-10-12012 October 1988 Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923. Violation Noted:Inadequate Fire Barrier Penetrations.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Findings IR 05000369/19880241988-10-0606 October 1988 Insp Repts 50-369/88-24 & 50-370/88-24 on 880801-0916. Violations & Unresolved Item Noted.Major Areas Inspected: Past & Current Operability of Hydrogen Skimmer Sys IR 05000369/19880291988-09-23023 September 1988 Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909. Violations Noted.Major Areas Inspected:Inoperability of Safety Sys Due to Inadequate post-mod Testing ML20205S0711988-09-13013 September 1988 Insp Repts 50-369/88-25 & 50-370/88-25 on 880816-18.No Violations or Deviations Identified.Major Areas Inspected: Resolution of Findings from NRC Diagnostic Evaluation Team Rept & Status of Licensee Written Response to Rept ML20154F9911988-09-0606 September 1988 Insp Repts 50-369/88-23 & 50-370/88-23 on 880723-0819.One Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings ML20151Z8821988-08-19019 August 1988 Insp Repts 50-369/88-20 & 50-370/88-20 on 880625-0722. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880221988-08-11011 August 1988 Partially Withheld Insp Repts 50-369/88-22 & 50-370/88-22 on 880718-22 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Procedures & Operations of SNM IR 05000369/19880161988-07-26026 July 1988 Insp Repts 50-369/88-16 & 50-370/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages IR 05000369/19880191988-07-21021 July 1988 Insp Repts 50-369/88-19 & 50-370/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Nde Activities Re Resistance Temp Detector Sys Mods & Inservice Insp & Preservice Insp Being Accomplished During Outage IR 05000369/19880171988-07-15015 July 1988 Insp Repts 50-369/88-17 & 50-370/88-17 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents IR 05000369/19880181988-07-12012 July 1988 Partially Withheld Insp Repts 50-369/88-18 & 50-370/88-18 on 880620-24 (Ref 10CFR2.790 & 73.21).One Licensee Identified Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security Program & Records & Repts ML20151E6081988-07-0808 July 1988 Insp Repts 50-369/88-14 & 50-370/88-14 on 880521-0624. Violations Noted:Continued Weakness in Procedural Compliance.Major Areas Inspected:Safety Verification, Surveillance Testing & Refueling Outage Activities IR 05000369/19880151988-06-30030 June 1988 Insp Repts 50-369/88-15 & 50-370/88-15 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nde Procedures Review,Observation & Review of in-process NDE Exam & Review of Inservice Insp Exam Data ML20195C8611988-06-0707 June 1988 Insp Repts 50-369/88-13 & 50-370/88-13 on 880502-06.One Violation & Two Unresolved Items Noted.Major Areas Inspected:Nrc Diagnostic Evaluation Team Rept Findings & Action on Previous Insp Findings ML20155J3411988-05-31031 May 1988 Insp Repts 50-369/88-12 & 50-370/88-12 on 880423-0520. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19993011999-03-18018 March 1999 NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205.Five SRO & Six RO Candidates Received Written Exams & Operating Tests IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20154C4131998-09-21021 September 1998 Notice of Violation from Insp on 980712-0822.Violation Noted:On or Before 971217,operations Personnel Failed to Designate Appropriate Vent Valves for Venting to Properly Return Sys to Svc as Required by Omp 7-1 IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20237B1561998-08-0707 August 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:Licensee Failed to Establish Procedural Guidance for Abnormal Vent Path Used for Degassing Unit 1 Volume Control Tank to Environ IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-030, on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event1998-06-0404 June 1998 PNO-II-98-030:on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event ML20249A2451998-06-0404 June 1998 Notice of Violation from Insp on 980413-24.Violation Noted: Procedure Investigation Processes 2-M96-1440 & 0-M97-1933 Were Not Initiated within 24 H After Realization That Procedure Investigation Process Should Have Been Written IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6051998-04-0606 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Licensee Failed to Adequately Establish or Adhere to Procedural Guidance for Repair of Two safety-related Containment Isolation Valves as Evidenced ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security ML20203F5921998-02-23023 February 1998 Notice of Violation from Insp on 980105-08.Violations Noted: Licensee Failed to Follow Procedures for Security Badge & Access Control IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys IR 07100102/20120131998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Inadequate Measures Were Provided for Verification or Checking Adequacy of Design Documents ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1571998-01-0505 January 1998 Notice of Violation from Insp on 971205-06.Violation Noted: an Event Occurred on 971202 in Which Person or Persons Made Credible Threat to Commit or Cause Significant Physical Damage to Power Reactor & Not Reported within One Hour ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg ML20203M4471998-01-0505 January 1998 Errata to Notice of Violation for Insp Repts 50-369/97-19 & 50-370/97-19.Statement in Nov,Page 2, Under Authority of Section 182 of Act.42USC 2232,this Response Shall Be Submitted Under Oath or Affirmation, Was Incorrect IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N4701997-10-20020 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 ML20212A0361997-10-0808 October 1997 Notice of Violation from Insp on 970712-0827.Violation Noted:As of 970717,10 of 48 Ice Condenser Inlet Doors on Unit 2 Required Initial Opening Torque in Ixcess of 675 inch-pound Operability Limit ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19973001997-08-29029 August 1997 NRC Operator Licensing Exam Repts 50-369/97-300 & 50-370/97-300 (Including Completed & Graded Tests) for Test Administered on 970728-31.Exam Results:Five SRO & One RO Passed Exam & One SRO Failed Exam IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20217R1161997-08-18018 August 1997 EN-97-076:on 970818,order Prohibiting Involvement in NRC- Licensed Activities for a Period of One Year Will Be Issued. Action Based on Investigation Conducted by Oi,Which Determined Falsification of QA Document PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened1997-08-0909 August 1997 PNO-II-97-051:on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149L5701997-07-28028 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:Procedure IP/0/A/3250/12B Inadequate to Provide Sufficient Guidance to Properly Test Emergency Diesel Generator Sequencer Logic Circuitry ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149G6771997-06-16016 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Procedure PT/1/A/4600/014D Was Inadequate in Providing Sufficient Guidance to Bypass Properly RPS Functions of an Inoperable N-41 Channel to Permit Testing of Channel N-42 IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148B9621997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support 1999-08-26
[Table view] |
Inspection Report - McGuire - 1989018 |
---|
|
|
Text
_
. _ _ - _ . _ -
t .
+ .. o
@ .' 1 e.ammeep
.
UNITO STATES i.. ,
r f g l
-
-
7g/'p'-, i ~y$ . ' NUCLEAR REGULATCRY COMMISSION '
JD REllON 11
' ,
l
.ga 101 MARIETTA STREET, ef ;
t . ATLANTA GEORGIA 30323 4-f '% Ass * ,
'
.,
.;
- i q
Report Nos.: 50-369/89-18,50-370/89-18 -4
' Licensee: Duke Power Company j 422 South Church Street :l
, Charlotte p C 2824 *
Facility Name: McGuireill.uolear Station 1 and 2 . !
9' i
' Docket Nos.:~: 50-369, 50,H 3 4,.
'
.
i License Nos.: NPF-9, NPF-17
Inspection Conducted: -June 29, 1983 - July 28, 1989
"
'
Inspectors: / m., 2, 7-f- M l K. Na'dDoorn, Senior ResidentfInspector ~ Date' Signed !
<W/ D , ,. ' /L + F-fd 'i '
]
T.oCooper, Resident Inspect 6r Date Sign 6a l
' Approved by:
'
W7hd' 8d8')
Date Signed M.,B. ShymT9tk. Section Chief d Division of Resctor Projects
!
'
L SUMMARY l j
'
).
'
. Scope: i This routine ; unannounced inspection involved. the. areas of operations safety verification, ' surveillance testing, . maintenance' activities.- followup -of licensee event reports, and follow-up on previous inspection finding l
,
Results: ,.
'!
. a In the areas inspected, no violations were identified.- The licensee identified
,
i an inoperable Power Operated Relief Valve which should have been discovered by post maintenance testing. A previous ' violation ' had been issued for similar .
. problems ' occurring in the same time frame. Previous corrective actions appear j
- appropriate for, this problem, therefore, a violation was not cite (See '
j paragraph 5.b)
.1 i
u.
l,5 l- !
U l
l'
/ $$s2pggggggg*g o , <
_ i___m ~ b
,-
_- _. _ _ _ - - _ __ _ --- _ . . - - __ .--
_ _ ,
.
-
-. ii I
REPORT DETAILS Persons Contacted Licensee Employees G. ,Adtiir, Superintendent of Station Services D. Baxter, Support Operations Manager J. Boyle Superintendent af Integrated Scheduling D, Bumgardner, Unit 1 Operations Manager
.
J.1 Foster, Station Health Physicist l H. Funderburke, Station Chemist G, Gilbert, Superintendent of Technical Services C. Hendrix, Maintenance Engineering Services Manager
- T. Mathews, Site Design Engineering Manager
- T. McConnell, Plant Manager
- D. Murdock, McGuire Design Engineering Division Manager W. Reeside, Operations Engineer
.R< Rider, Mechanical Maintenance Engineer
- M. Sample, Superintendent of Maintenance R Sharp, Compliance Manager J. Snyder, Performance Engineer "
J. Silver, Unit 2, Operations Manager
'A. Sipe, McGuire Safety Review Group Chairman
- B. Travis, Superintendent of Operations R. White, Instrument & Electrical Engineer Other licensee employees contacted included construction - crafteen, technicians, operators, mechanics, security force members, and office personne NRC Resident Inspectors
- Attended exit interview Unresolved Items An unresolved item (UNR) is a matter about which more inform 6 tion is required to determine whether it is acceptable or may involve a violation or deviation. There were no unresolvcd items identified in this repor . Plant Operations (71707, 71710)
The inspection staff reviewed plant operations during the report period to verify conformance with applicable regulatory requirements. Control rooni logs, shift supervisors' logs, shift turnover records and equipment j
\
- _ _ _ - - - . - - - _ _ - .
- - _ _ - - - - _ _ _ _ _ _ _ _ _ _
'
.
h 4
i removal and restoration records were routinely perused. Interviews were j conducted with plar,t operations, maintenance, chemistry, health physics, !
and performance personne Activities within the control room were monitored during shif ts and at shift - changes. Actions ar.d/or activities observed were ::onducted as prescribed in applicable station administrative directives. The complement of licensed personnel on each shift met or exceeded the minimum required ,
by Technical Specifications (TS). j Plant tours taken during the reporting period included, but were not limited to, the turbine buildings, the auxilthry building, Units 1 and 2 electrical equipment rooms, Units 1 anc 2 cable spreading rooms, and the station yard zone inside the protected are During the plant tours, ongoing activities, housekeeping, security, f equipment status and radiation control practices were observe Unit 1 Operations
Unit 1 began the period at 100% power. On June 30, 1989 the Digital Electro Hydraulic (DEH) turbine control system malfunctioned. A capacitor in the circuit for a status monitoring panel apparently failed which affected two 15 volt DC control power supplies. The effect was to reduce the voltage to approximately 5 volts leading to l
';
erratic behavior of the turbine governor valve Despite sudden megawatt decreates of approximately 200, 300 and 400 megawatts the licensee successfully shutdown the plant without a trip. Operrtors handled the transient in a well coordinated fashion as observed by i the inspecto The affected circuit card was replaced and the unit
was restarted on July 1, 1989. A preventive fix is being evaluated with the vendor. The unit remained on-line the rest of the period, however, on July 5,1989 the licensee discovered that the un;t was ,
'
actually running at 101-102% power for approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> while the nuclear instrumentation (NI) was indicating 95-96% The NI channels had apparently been miscalibrated on July 2,1989. A detailed inspection of this event was conducted by the inspector and a regional inspector and is described in NRC Report 369,370/89-2 Unit 2 Opn3tions l Unit 2 tegan the period at 98% in a fuel conservation coast down leading to a refueling shutdown which occurred on July 5, 1989. The unit ended the period in no morle, refuelin The inspector reviewed licensee practices for removing licensed operators from the active shift based on requalification test results. The licensee requires a retest if an operator scores 70-80%
on any section of the test, hcwever, the operator would not be removed from the shift. A score of less than 70% on any section would be considered a failure and the person wotid be removed from the shift.
- - - - _ _ - -_ _ _ _ - _ - - -
7_ .
W
- 9 m w - >
.g y,; *
f d' . On July 14, 1989' the licensee informed the inspector of a wiring .
problem associated with the filter preheaters power supply for the Annulus Ventilation (VE) System. The' wires were found. to be Teflon jacketed which can break down in a radiation environment reducing their ability to function as a moisture barrier. The licensee judged
.that moisture from an accident situation could cause electrical shorts.and prevent operation if VE was stopped after initiation of
, the accident. The operations procedure was changed to restrict stopping of the system and. instructions were given to operations personnel. The licensee expects'to be able to corrcet the wiring in
.approximately three months. J An additional problem was identified to 1 the inspector on July 19, 1989. The licensee had discovered that the cross-connect valves between the two VE trains if left open (normal
. position)' could result-in an increase in offsite dose greater than originally assumed although below 10 CFR 100 limit The original offsite dos cross-flow calculation from a possibla dididle not trai take into account Technical higher humidity)
Specification (TS
- 4.6.1.8.d.3 for VE. requires verification that the valves can be opened. A' Phase B Isolation signal starts VE and opens the valve . The cross flow design was developed to provide cooHng flow through the charcoal filter of the idle train for fire prevention.- The possibility for a fire is considered remote and a deluge system is available. Therefore, although the system appears to meet design basis as designed, it appears that a modified design which results in lower dose- may be an improvement over the existing design. The lice'nsee indicated that-a modified design and appropriate TS change would be coniidered. This is - Inspector Followup Item 369, 370/89-10-01: Review of Design and Technical Specification changes for Annulus Ventilatio On July 18, 1989 the. licensee discussed the. fuel clip replacement process which was planned during the Unit 2 outage. The licensee was planning to conduct the removal and replacement in' Region 2 of the Spent Fuel Pool. The licensee is committed to store unqualified fuel in a checker board pattern in this area with physical barriers in the empty locations. The licensee indicated that the fuel clip removal
'
device would be placed in Region 2 and no assemblies would be present in Region 'One assembly at a time would be placod within the device for clip changeout and in addition the device physicall restricts the adjacent spaces from receiving fuel. The inspector reviewed procedure PT/0/A/4550/33: Controlling Procedure for fuel Clip Removal and drawings of the device. The licensees methodology appears to meet the licensing commitment No violations or deviations were identifie Surveillance Testing (61726) Selected surveillance tests were analyzed and/or witnessed by the i inspetor to ascertain procedural and performance acequacy and conformance with applicable Technical Specification I
!
4 - - _ _ __ ______ _ ___ _ _ _ __ _ __ _ _ ___
_j
, - - _ _ _ _ - . -
.
.
'
.
l Selected tests were witnessed or reviewed to ascertain that current written approved procedures were available and in use, that test equipment in use was calibrated, that test prerequisites were met, that system restoration was completed and test results were adequates Detailed below are selected tests which were either reviewed or witnessed:
PROCEDURE EQUIPMENT / TEST TT/2/A/9100/329 Reactor Vessel Thermal Mixing Data Acquisition IP/0/A/3001/001C Main Steam Flow Calibration Loop C Channel I (See Note)
'IP/0/A/3007/17 NIS Power Range Calibration to Best Estimate Thermal Power (See Note)
PT/0/A/4450/08C Control Rcom Area Ventilation Performance Test (Train A)
Note: These completed procedures were reviewed during followup of an
.
overpower event pf July 5, 1989. Results arc documented in NRC l Report 369,370/89-2 The inspector reviewed the licensee's practices regarding the Reactor Vessel Level Instrumentation System (RVLIS). The TS for RVLIS does tot require the upper range to be operable. The NRC and the licensee are presently reviewing whether this is acceptable. While the lower range indication would assure adequate inventory for core cooling the upper range serves to indicate decreasing level from the upper head area and is utilized in Emergency Procedures. The licensee includer l RVLIS upper range in the monthly surveillance procedure, PT/1 and l 2/A/4600/03D, Monthly Surveillance Items. Step 1.5 of Enclosure 13-1 .
requires verification that upper range indication show " Invalid" if one or more Reactor Coolant Pumps (RCPS) are running. The inspector questioned whether this surveillance was adequate in that it may be possible for the system to be valved out and still show " Invalid".
The licensee was requested to evaluate this question on July 10, 1989. The licensee indicated that additional checks and controls for RVLIS are in place but not formalized. RVLIS data is being verified during Reactor Coolant System fill and vent prior to placing the L system in operation. The system also contains three alarms; ICC
'
Monitor Trouble, RVLIS Capillary Tubing Trouble, and Diagnostic Information. The licensee's practice has been to implement a high priority work request whenever these alarms are present. The licensee practice for the Magnex isolation valves is to remove the operators from the valves once the system is aligned to prevent inadvertent isolation. The licensee indicated that verification of the absence of alarms would be added to the surveillance procedure I and the other practices would be formalize _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _
- _ _ _ _ _ - _ _ - _ _ _ _ - - - _
- _ _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
.
1 .
l
.
L On July 16, 1989 the inspector was informed that a portion of a control room door seal was found missing possibly rendering the Control Room Ventilation (VC) System inoperable. VC was declared inoperable and TS 3.0.3 was entered for a short period until the door could be taped. The taping process had been previously evaluated as acceptable for sealin The licensee later discovered through interviews that the seal had been missing during the previous performance test and, therefore, even with the seal missing VC was operable. This was confirmed with an A train VC test on July 26, 198 A concurrent problem also existed in that the locking mechanism en the door had not been working properly. The licensee is investigating whether this rendered VC inoperable, i.e. the door could be pushed open by control room pressurization from VC rendering VC inoperable (unable to maintain control room overpressure). The licensee is continuing their investigation on VC operability, the need to improve surveillance and/or maintenance practices, root cause for the missing seal, and the need for improved practices to assure that operations personnel are promptly informed of defective lock problems. Further followup :nspection will be conducted relative to the licensee's investigatio This is Inspector Followup Item 369,370/89-18-02: Review of Licensee Evaluation of Control Room Door Problem No violations or deviations were identifie . Maintenance Observation (62703) Routine maintenance activities were reviewed and/or witnessed by the resident inspection staff to ascertain procedural and performance adequacy and conformance with applicable Technical Specification The selected activities witnessed were examined to ascertain that,
where applicable, current written approved procedures were available and in use, that prerequisites were met, that equipment restoration was completed and maintenance results were adequat Activity Torone Switch Bypass Modifications for Valves 1 and 2 CF-126B, 127B, 128B and 1298. (Variation Notices MEVN-1854 and 1769).
l Portions of IP/0/B/3250/08, Calibration Procedure For Hays Republic V5A Indicaturs, for the B Emergency Diesel Generato On July 5,1989 the licensee discovered two wires rolled in the reactor protection cabinet which would have prevented operation of Pcwer Operated Relief Valve (PORV) 2NC-32B from operating in the low temperature overpressure (LTOP) protection mode. Concurrently the licensee discovered a blown fuse which would have prevented PORV 2NC-32A from operating in the LTOP mode. These two valves are one of
. _ - _ . - _ - _ - - _ _ _ - . - - - _ _ _ - - .
-
~
.
two LTOP systems required to be operable by TS 3.4.9.3. The other required system is a Reactor Coolant System (RCS) vent of greater than or equal to 4.5 square inches with the RCS depressurized. The situation was immediately corrected, however, this appears to be a past operability question and the licensee is investigating and developing a Licenste Event Report. Initial review of the event indicated that the improper wiring occurred during maintenance activities in July,1988 and post maintenance testing failed to identify the proble A previous NRC violation was issued for similar post maintenance testing problems which had occurred in the saue time frame (See Report 369,370/08-29). Therefore, this appears to be another example of post maintenance test.ing weaknesses previously cited. The previous violation involved incomplete testing after Nuclear Station Modifications (NSMs) to valve motor operators, The licensee reviewed other valve operator NSM packages to determine if similar problems existed but had not reviewed other NSM package However, the program enhancena -ts implemented as a result of the previous violation also appear to be appropriate for this problem. Therefore, this problem is not being cited as an NPC violation at this tim Additional corrective actions were being evaluated by the licensee at the end of the inspection perio Further NRC review will be conducted upon completion of the LE No vitiations or deviations were identifie . Licensee Event Report (LER) Followup (90712, 92700)
The below listed Licensee Event Reports (LER) were reviewed to determine if the information provided met NRC requirements. The determination included: adequacy of description, verification of coupliance with Technical Specifications and regulatory requirements, corrective action taken, existence of potential generic problems, reporting requirements satisfied, and the relative safety significance of each event. Additional -
inplant reviews and discussion with plant personnel, as appropriate, were conducted for those reports indicated by an (*). The following LERs are close *LER 369/89-10: Main Feedwater and Auxiliary Feedwater Isolation Valves Were Potentially Inoperable Because Of A Manufacturing Deficiency. The inspector reviewed documentation of torque switch bypass modifications completed as a short term corrective action. The licensee is planning to supplement this report defining long term corrective action *LER 369/89-11: A Technical Specification Surveillance Was Missed Because The Wrong Component Was Declared Operable Due To A Lack Of Attention To Detai The inspector reviewed the corrective actions taken and interviewed various licensee staff personnel to determine their familiarity with the corrective action requirement ;
_ _ _ _ _
_ __ _ .__-- -_
-
.
'
.
L LER 369/89-12: Siv Ice Condenser Intermediate Deck Doors Were Inoperable Because Of An Accu.alation Of Ice Due To Other/ Unknown Reasons. The inspector reviewed the corrective actions and determined that the incident was resolve LER 370/89-04: All Power Rar,ge Excore Detectors on Unit 2 Were Declared Inoperable Because The Transient Power Mismatch Was Exceede . Followup of NRC Bulletin (92701)
Bulletin No. 88-10: Molded Case Circuit Breakers. The licensee initiated a discussion with the inspector to update the status of this issue. The licensee recently identified that the original scope of their review of breakers in the warehouse was inadequate in that breakers ordered as more than one piece had not been included. Some breakers were discovered as having been received in two pieces and therefore~should have been removed from safety-related stock until they were evaluated. The licensee indicated that .the Bulletin response would be updated. The licensee's original response committed to retain any breakers taken out of stock for one year. The licensee has since experienced a parts shortage and desires to use some breakers in non-safety-related applications. The inspector indicated that this appeared acceptable as long as safety-related equipment was not affected and the amended response describes that affected breakers would be used in non-safety-related applications as necessar The licensee also indicated that breaker spare parts inspections had revealed apparent refurbished components subject to the same operability questions as identified % the Bulletin for complete breakers. The inspector suggested that thi: be documented to NRC in the additional response or other report as appropriate. This information was verbally forwarded by the inspector to NRC/NR No violations or deviations were identifie . Followup On Previous Inspection Findings (92701) (Closed) Inspector Followup Item 369,370/88-31-22: Followup of QA Department Personnel Training and Subsequent Improvements in QA Surveillance and Audit The inspector held discussions with licensee personnel and reviewed documentation of various QA surveillance and audit Audits reviewed included NP-88-14 (Performance, Refueling and Inservice Inspection), NP-88-03 (Quality Assurance Department), NP-88-15 (Fire Protection), NP-88-18 (Operations Activities) and NP-68-30 (Corrective Action).
Surveillance documentation review included Surveillance No MC-88-40, 41, 42., 43, 44, 45, 46, 47, 48, 49, 51, 52 and 53 and Summaries for Surveillance Nos. MC-89-01, 02, and 07. Also reviewed was a letter to the station manager dated June 2,1989 summarizing surveillance findings for the March 1 through May 31,1989 time fram .
b
___._.,______m ._.__m__ _ _ _ _ . _ . _ _
___ __
-
..
,
.- ;, . g It was noted that the corporate audits remain heavily weighted toward documentation review although they are not devoid of field observation. A consultant was used for a fire protection audit and the inspector witnessed a Senior Reactor Operator (SRO) from another Duke plant conducting an audit.- The corporate auditors are completing extensive operations traiaing (46 weeks). On-site surveillance personnel have completed this trainin The corporate program is complemented by a diverse on-site surveillance program often weighted toward field observatio Findings were supported and a number of findings were mor significant than minor paperwork problems and indicated a good technical knowledge of activities associated with an operating plan It is noted that the Quality Assurance (QA) Department is in a lead role for the Self Initiated Technical Audits (SITA) and previous NRC review has shown these audits to be thorough and valuable. The site QA Manager is presently in SR0 school which will further bolster QA Technical expertise. Also an experienced Maintenance Superintendent
~
has been added to the SlTA staff. In addition an NRC maintenance inspection team recently reviewed audits and surveillance for irtintenance and found no problem (See Report 369,370/89-15) (Closed) Inspector Followup Item 379,370/88-31-23: Verify Improvements in Licensee Followup of QA Audit and Surveillance Findings. The inspector reviewed followup of selected findings from the above listed audits and surveillance and held discussions with
'QA personnel. Items appeared to be closed out in a timely manner with appropriate corrective action The NRC maintenance team also reviewed this area for maintenance audits with no problems identifie .No violations or deviations were ident4fie . ExitInterview(30703)
The inspection scope and findings identified below were stanarized on July 28, 1989, with those persons indicated in paragraph 1 above. The following items were discussed in detail:
Inspector Followup Item 369,370/89-18-01: Review of Design and Tech Spec Changes for Annulus Ventilation (paragraph 3.d.).
Inspector Followup Item 369,370/89-18-02: Review of Licensee Evaluation of Control Room Do'or Problems (paragraph 4.c.)
The licensee representatives present offered no dissenting comments, nor did they identify as proprietary any of the information reviewed by the I
inspectors during the course of their inspectio .