ML20204F885

From kanterella
Revision as of 19:11, 30 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Safety Evaluation Supporting Type a Containment Leakage Test Results as Adjusted & Stated in 860228 Summary Technical Rept.Retention of Present Schedule for Type a Containment Leakage Tests Also Acceptable
ML20204F885
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/25/1986
From: Kintner L
Office of Nuclear Reactor Regulation
To: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20204F889 List:
References
TAC-60862, NUDOCS 8608060229
Download: ML20204F885 (2)


Text

_

JUL 2 51986 Docket No. 50-416 . DISTRIBUTION

, Docket File- BGrimes NRC PDR JPartlow LPDR LKintner Mr. Oliver D. Kingsley, Jr. PD#4 Rdg. M0'Brien Vice President, Nuclear Operations RBernero ACRS(10)

Mississippi Power & Light Company Young, OGC P.O. Box 23054 NThompson Jackson, Mississippi 39205 EJordan

Dear Mr. Kingsley:

SUBJECT:

TEST SCHEDULE FOR TYPE A CONTAINMENT LEAKAGE RATE TESTS Re: Grand Gulf Nuc' ear Station (GGNS), Unit 1 By letter dated February 28, 1986 Mississippi Power & Light Company submitted a summary technical report entitled " Primary Reactor Containment Integrated Leakage Rate Test" which gave the results of the Grand Gulf Unit I containment leakage Type A test conducted in accordance with requirements in Appendix J to 10 CFR 50. The initial Type A test did not meet the acceptance criteria of Appendix J. The sources of leakage were identified and isolated and the retest of the containment was successfully completed. Paragraph III.A.6(a) of Appendix J requires that if a Type A test fails, the licensee must submit a schedule for subsequent Type A tests to the NRC for review and approval.

In its February 28, 1986 letter, the licensee proposed that the schedule for subsequent Type A tests remain as currently specified in the GGNS Unit 1 Technical Specifications.

The NRC staff has reviewed the licensee's February 28, 1986 submittal. The staff's safety evaluation is enclosed. The staff concludes that the Type A containment leakage test results as adjusted and stated in the summary tech-nical report are acceptable. The staff further concludes that retaining the present schedule for subsequent Type A containment leakage tests is acceptable.

Sincerely,

@l slped by Lester L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page hj C OG g /j @ PD#4/D e' O, PD#4/LA M0'Brien P #4/PM LKintner:lb

/-

g/l/ gov WButler

/ /86 "//rg/86 7/j6 /88 -/g86 1

0600060229 860725 hDR ADOCK 0500o416 PDR

Mr. Oliver D. Kingsley, Jr.

Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi -

1200 17th Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering Regional Administrator, Region II and Support U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company 101 Marietta Street, N.W., Suite 2900 Post Office Box 23054 Atlanta, Georgia 30323 Jackson, Mississippi 39205 Mr. J. E. Cross Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company P.O. Box 756

Mr. C. R. Hutchinson GGNS General Manager Mississippi Power & Light Company Post Office Box 756 Port Gibson, Mississippi 39150