ML20206M269

From kanterella
Revision as of 20:21, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-443/86-32 on 860520-22.No Violation Noted.Completion of Fire Protection Sys Should Be Verified Prior to Fuel Load.Surveillance Testing Procedures Should Be Finalized Before Fuel Load
ML20206M269
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/25/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20206M274 List:
References
NUDOCS 8607010122
Download: ML20206M269 (2)


See also: IR 05000443/1986032

Text

r

.

.

JUN 2 51986

Docket No. 50-443

Public Service of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

'

Subject: Inspection Report No. 50-443/86-32

This refers to the routine safety inspection corducted by Mr. A. Krasopoulos

of this office on May 20-22, 1986, at Seabrook, Unit 1, New Hampshire, of

activities authorized by NRC License No. CPPR-135 and to the discussions of

our findings held by Mr. Krasopoulos with Mr. L. Walsh of your staff at the

conclusion of the inspection and to subsequent discussions between

Mr. A. Cerne and Mr. W. Sanchez of your staf f on June 4,1986.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas,

t

the inspection consisted of selective exaninations of procedures and repre-

sentative records, interviews with personnel, and observations by the inspec-

tor.

Within the scope of this inspection, no vtolations were observed.

Since some fire protection related work remains to be completed it is important

that you verify completion of the fire protection systems prior to fuel load.

In addition all administrative and surveillance testing procedures relating to

fire protection, should be finalized before f uel load.

Your cooperation with us in this matter is appreciated.

Sincerely. '

OriElon1515nedM8

JacqueP.Du n

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-443/86-32

8607010122 860625 0FFICIAL RECORD COPY IR SB 86-32 - 0001.0.0

PDR ADOCK 05000443 06/16/86 ,

l\%

G PDR Jg[

. _ _ _ _ _ _ _ _ _ _ _ _ _

.

Public Service of New Hampshire 2

.

cc w/ encl:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President ,

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

RI:DRS RI:DRS RI:DRS

Krasopoulos/mjd/fi Anderson Ebneter

. 6//')./86 k/l 6//4/86 6/,15786

c;c

0FFICIAL RECORD COPY IR SB 86-32 - 0002.0.0

06/06/86

I

~ _ _ _ _ _ _ _ . _. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -__ _-_ - ___ ____ _ _ _ ____ __ ___-______ _ __-_____ - ___ -_ - ____ _