ML20151Q293

From kanterella
Revision as of 00:56, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 880718 Response to Notice of Violation from Insp Rept 50-424/88-19
ML20151Q293
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/25/1988
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Hairston W
Georgia Power Co
References
NUDOCS 8808110103
Download: ML20151Q293 (2)


See also: IR 05000424/1988019

Text

. .

,

.

JUL 251988

. .

Georgia Power Company

ATTN: Mr. W. G. Hairston. III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-424/88-19

Thank you for your response of July 18, 1988, to our Notice of Violation issued

on June 21, 1988, concerning activities conducted at your Vogtle facility. We

have evaluated your response and found that it meets the requirements of

10 CFR 2.201. We will examine the implementation of yo;r corrective actions

during future inspections.

We appreciate your cooperation in this matter.

Sincerely,

.

William E. Cline, Chief

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

cc: R.- P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

A:surance Manager

G. Bockhold, Jr. , General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

banager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

l

bec: (See page 2)

8808110103 880725

PDR

G

ADOCK 05000424

PNU

\)

. .

,

.

,

Georgia Power Company 2 JUL 25 Lgag

bcc: NRR/DRIS/S8

NRC Resident Inspector

Document Control Desk, 016

State of Georgia

l

I

/

RII ,

, R RII

WTobin DMcGu MSinkule

07/g V88 07//-y/re

S8 07/Jr/88

1

1

. l

.

'

ieorc a Power Cycany l

I

..

} 33 P ecrrcet A.me j

At anta Geot; a 'M3

. 'e ecrcre 404 03 6D3

f tasi.no Aness

POSI CILCO BCA 4545

Allarta Georc'3 30?O2

SAFEGUARD INFORMATION Georgia* Power

DECONTROLLED WHEN SEPARATED

l

Nuclear Operations Departrnent " "'#'

FRoM ATTACHVENT C l

NONg0200 o

July 18, 1988

Ea h

p

U. S. Nuclear Regulatory Commission p P y,

ATTN: Document Control Desk iE3 Oz

Washington, D. C. 20555 '

Fi

.s: #1

PLANT V0GTLE - UNIT 1 N

NRC D0CKET 50-424

OPERATING LICENSE NPF-68

REPLY TO A NOTICE OF VIOLATION

Gentlemen:

In accordance with the provisions of 10CFR2.201, Georgia Power Company

(GPC) submits the enclosed information in response to NRC Inspection

Report 50-424/88-19 which concerns the inspection conducted by Mr. W.

J. Tobin of the NRC Region II staff on April 25 - 19, 1988. A copy of

this response is being provided to the NRC Region II office for review.

We believe that Item Number 3 of the "Report Details" for the

Inspection Report 50-424/88-19 (as submitted by NRC Region II letter

dated June 21, 1988) incorrectly refers to 88-14-01 as 88-14-06. The

description of this violation presented in paragraph 5 is in fact a

description of violation 88-14-01.

In each of the enclosures, a transcription of the NRC violation

precedes the GPC response.

The information contained in the enclosures is safeguards information

and, in accordance with 10CFR2.790 and 10CFR73.21, should not be placed

in the NRC Public Document Room.

Should there be any questions in this regard, please contact this

office at any time.

Sincerely,

a), -

k&-

W. G. Hairston, III

Senior Vice President

Nuclear Operations l

!

KP/stl

P  !

olation 88-19-01 and GPC Response SAFEGUARD INFORMATION

2. Violation 88-19-02 and GPC Response

$ $ 0'L

3CH ENT

"EN SEPARATCD

c: (see next page)

g g g i,1Q_ _

N s/'/

_

'

.

  • -

.

,

-

.

'

.

'

Gb6rgidPower A

SAFEGUARD INFORMATION

DECONTROLLED WHEN SEPARATED

FROM ATTACHMENT

U. S. Nuclear Regulatory Comission

July 18, 1988

Page Two

c: Georgia Power Company

Mr. P. D. Rice, w/o enclosure

Mr. G. Bockhold, Jr., w/ enclosure

Mr. J. H. Lukehart, w/ enclosure

Mr. L. T. Gucwa, w/ enclosure

Mr. J. E. Swartzwelder, w/o enclosure

Mr. F. R. Timons, w/o enclosure

GO-NORMS, w/o enclosure

V0GTLE-NORMS, w/ enclosure

U. S. Nuclear Regulatory Comission

Dr. J. N. Grace, Regional Administrator, w/anclosure

Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies),

w/o enclosurc l

Mr. J. F. Rogge, Senior Resident Inspector - Operations, Vogtle,

w/o enclosure

SAFEGUARD INFORMATION

DECONTROLLED WHEN SEPARATED

FROM ATTACHMENT

""' _ _ _ _ _ . _. - , - . . - -