Forwards IE Inspec Repts#50-440/78-14,#50-441/78-13 on 781025-27 & Notice of Violation
ML20148A307
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/15/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20148A310 List:
References
NUDOCS 7812280307
Download: ML20148A307 (2)


See also: IR 05000440/1978014

Text

T

a

  1. UNITED STATES

.v . -

  1. "*%,1 '

NUCLEAR REGULATORY COMMISSION

EI M,y R E GION ill

(g$ y(g v

) ge 7ti9' noose VE LT RoAo

oLEN E LLv N. iLLiwois sois7

j

a...*

EE C 1. 178

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. D. R. Davidson

Vice President - Engineering

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Ronklin,

J. H. Neisler, and P. C. Hawkins of this office on October 25-27,

1978, of activities at the Perry Nuclear Plant Project, Units 1

and 2, authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to the discussion of our findinge with Messrs.

M. R. Edelman and G. W. Groscup and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A. Item No. 2 shown in the Notice

of Violation enclosed with this letter is a recurrent item.

In your response please give this matter particular attention.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations. Section 2.201 requires you to submit to

this office within thirty days of your receipt of this notice a

written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid f urther non-

compliance; and (3) the date when full compliance will be achieved.

781228 COO 7

o s i.

h.h

The Cleveland Electric -2- bEC1- TI

Illuminating Company

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a. copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows. If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

'

inspection.

Sincerely,

~ .$9

ames G. Ke r

Director

Enclosures:

1. Appendix A, Notice

of Violation

2. IE Inspection Reports

No. 50-440/78-14

and No. 50-441/78-13

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR  ;

Local PDR

NSIC

TIC

U. Young Park, Power

Siting Commission l

Mr. Daniel D. Wilt,

Attorney 1

l

I

1

l

1

1

- --. - . . . , _ . . . . .