ML20127H065

From kanterella
Revision as of 06:40, 10 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-416/85-06 on 850216-0315 & Notices of Violation & Deviation
ML20127H065
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/05/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20127H069 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8505210218
Download: ML20127H065 (2)


See also: IR 05000216/2003015

Text

F

o YlOG{

v/ .

s

APR 051985

[

Mississippi Power and Light Company

ATTN: Mr. J. B. Richard

Senior Vice President, Nuclear

P. O. Box 23054

Jackson, MS 39205

Gentlemen:

SUBJECT: REPORT NO. 50-416/85-06

On February 16 - March 15, 1985, NRC inspected activities authorized by NRC

Operating License No. NPF-29 for your Grand Gulf facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the en::losed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

'

The inspection findings indicate that certain activities violated NRC require-

ments and other activities appeared to deviate from a commitment to the NRC. The

violation and deviation, with pertinent references and elements to be included in

your response, are presented in the enclosed Notices.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

David M. Verre111 /for

Roger D. Walker, Director

Division of Reactor Projects

Enclosures: (See page 2)

8505210218 850405

PDR ADOCK 05000416

G PDR

h

Of

C.

,

APR 051985

fa

Mississippi Power and Light 2

Enclosures:

1. Notice of Violation

2. Notice of Deviation

~3. Inspection Report No. 50-416/85-06

cc w/encis: ,

.J. E. Cross, General Manager

R. T. Lally, Manager of Quality

Middle South Services, Inc.

R. B. McGehee, Esquire

Wise, Carter, Child, Stecn and Caraway

'N. S. Reynolds, Esquire

Bishop, Liberman, Cook, Purcell

& Reynolds

R.- W. Jackson, Project Engineer

bec w/encis:

NRC Resident Inspector

Document Control Desk

State of Mississippi

.

!

RII RIIj , RII

RButcter:dr RE(rroll VPa era VBrownlee

4/ /85 4/'f/85 4/ /85 4/g/85

l

r