Forwards Preoperational Physical Security Insp Rept 50-440/85-40 on 850708-12.No Noncompliance Noted
ML20134D349
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/13/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20134D352 List:
References
NUDOCS 8508190191
Download: ML20134D349 (2)


See also: IR 05000440/1985040

Text

e ,

a

3

h h 1.)bIIWU$UdN$ l

AUG 13 USS

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murrcy R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the announced preoperational physical security inspection

conducted by Messrs. J. R. Kniceley, T. J. Madeda and B. Drouin of this

office on July 8-12, 1985, of activities at Perry Nuclear Power Plant,

Unit 1 authorized by NRC Construction Permit No. CPPR-148 and to the

discussion of our findings with Mr. J. J. Waldron and other members of your

staff at the conclusion of the inspection.

l The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

-

Areas examined during this inspection concern a subject matter which is

exempt from disclosure according to Section 73.21(c)(2) of the NRC's " Rules

of Practice," Part 73, Title 10, Code of Federal Regulations. This information

must be handled and protected in'accordance with the provisions of 10 CFR 73.21.

Consequently, our report of this inspection will not be placed in the Public

Document Room.

DMS /3

Enclosure centofos

' "" "

8508190191 850813

PDR

" '

O ADOCK 05000440 Pago is Dacontrolled

PDR

M " A ? * r. P nD IS? C nn5 f P P n],!

-

Lii 'se w., n s e . J v s.., J....,..aei

-

-

)

)(

e carrm s A n m in s & -- -m.q

vn, a-ww u s uu : vi Viutili t ivn t

The Cleveland Electric Illuminating 2 AUG 13 D36

Company

We will gladly discuss any questions you have concerning this inspection.

Sinc ely, -

]

M l H -

./ .

W. L. Axelson, Chief

Nuclear Materials Safety and

Safeguards Branch

Enclosure: Inspection Report

No. 50-440/85040(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

Perry Information Control

Mail Zone R290

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o UNCLASSIFIED

SAFEGUARDS INFORMATION:

DMB/ Document Control Desk (RIDS)

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health Islo_.._.ture cc.ntafns

SAFEE;V2 1EFoib'aT t0W

Upon Separation This

Paga Is pocontrolled

,q

RIII RIII RIII II RIII RIII f

b~K ley /jp [uM a r81n 'e d K op Axelson

08/10/85 y4gs.s- 9/epr g

m a

.x...... A-

.~ -

v...

c, m o m,ue ...,