Preoperational Physical Security Insp Rept 50-440/85-40 on 850708-12.No Violations Noted.Major Areas Inspected:Status of Implementation & Installation.Details Withheld (Ref 10CFR73.21)
ML20134D416
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/13/1985
From: Creed J, Drouin R, Kniceley J, Kniceley J, Knicley J, Madeda T, Modeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20134D352 List:
References
50-440-85-40, NUDOCS 8508190210
Download: ML20134D416 (2)


Text

'

,

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-440/85040(DRSS)

Docket No. 50-440 License No. CPPR-148 Licensee: Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, Ohio 44101 Facility Name: Perry Nuclear Power Plant, Unit 1 Inspection At: Plant Site Inspection Conducted: July 8-12, 1985 Date of Last Physical Security Inspection: May 13-17, 1985 Type of Inspection: Announced, Preoperational Physical Security ,

.

Inspectors: [4. LJfiigriey A AI/($~

Datg /

' Physical' Security Inspector C L')

J. Madeda 8lalei Date

@Vhysi ecuri Inspector ww' 8l/3/f'5~

8. Droutfi / Date '

Physical Security Inspector Approved By: O!/3 J R. Creed, Chief Date afeguards Section Inspection Summary Inspection conducted on July 8-12, 1985 (Report No. 50-440/85040(ORSS))

.

Areas Inspected: Included a review of the status of implementation; l installation; operability of the security program and the preoperational testing program for security-related equipment. Specifically, the inspection covered: Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing hog 81O AD 40 Enclosure Contains G PDR SAFEGUARD $ 1NFORMT10Y Upon Separotton 1 hts Page is Decontroiled

- . . -

.-. . . - - - - . - - _ . - _ - - - - -

. >

and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel, Packages and Vehicles; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications; Personnel Training and Qualification - General Requirements; and Safeguards Contingency Plan Implementation Review. This inspection involved 105 inspector-hours by three NRC inspector Results: The inspectors identified the current status of the security program the implementation of which appears to be progressing adequately. Some areas that must be completed prior to licensing were identified. No violations were identifie (Details - UNCLASSIFIED )

f Encle nm contains sn utwaos IMicr,PATION Upon scporotton 1 hts PaDe is Deconttullod l 2