Forwards Safety Insp Repts 50-440/85-58 & 50-441/85-21 on 850826-29.No Noncompliance Noted.Lack of Progress Toward Full Implementation of Qa/Qc Program for Lab & Counting Room Noted
ML20138B706
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/08/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20138B713 List:
References
NUDOCS 8510220005
Download: ML20138B706 (2)


See also: IR 05000440/1985058

Text

. .

'

OCT 0 81985

Docket No. 50-440 ,

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

,

. Gentlemen:

This refers to the routine safety inspection conducted by Drs. M. J. Oestmann

and R.'8. Holtzman of this office on August 26-29, 1985, of activities at

the Perry Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our findings

with S. Kensicki and others of your staff at the conclusion of the inspection.

Additional-discussions were held by telephone with Messrs. D. Reyes and

E. Traverso on September 23 and 26, 1985.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective ,

, examination of procedures and representative records, observations, and

interviews with personnel.

,

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

While no items of n_oncompliance were identified we are concerned with your lack

of progress in iraplementing a Quality Assurance / Quality Control program for

your laboratory and counting room and for testing the competence of your

technicians, as described in your-procedure RAP 0204. We expect full imple-

. mentation.of this QA/QC program and completion of testing of your technicians

prior to issuance of the fuel load license. This item is discussed in ,

Sections 2.b., 3, and 5. We understand you plan to take positive steps

within'the month of September to correct this situation.

>

%)

/

X '

$

8510220005 051000 O g(

DR ADOCK O

.

!

. .

.

The Cleveland Electric Illuminating 2 OCT 0 81985

Company

~

In accordance with 10 CFR 2.790 of the. Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely, -l

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

'

Enclosure: Inspection Reports

No. 50-440/85058(DRSS); and

, No. 50-441/85021(DRSS)

cc w/ enclosure:

'

J. J._Waldron, Manager, Perry

.

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

,

Terry J. Lodge, Esq.

,

'

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

Douglas Weiss, Licensee Fe.e

Management Branch

i

k9

RIII III- RIII RII / F

1 'fb SW~ -f]]M- ({Q

~0sstmann/jp .

Itzman Schumacher Knop e

-10/04/85

L