OCT 0 81985
Docket No. 50-440
,
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
. Gentlemen:
,
This refers to the routine safety inspection conducted by Drs. M. J. Oestmann
and R.'8. Holtzman of this office on August 26-29, 1985, of activities at
the Perry Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction
Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our findings
with S. Kensicki and others of your staff at the conclusion of the inspection.
Additional-discussions were held by telephone with Messrs. D. Reyes and
E. Traverso on September 23 and 26, 1985.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
,
,
examination of procedures and representative records, observations, and
interviews with personnel.
,
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
While no items of n_oncompliance were identified we are concerned with your lack
of progress in iraplementing a Quality Assurance / Quality Control program for
your laboratory and counting room and for testing the competence of your
technicians, as described in your-procedure RAP 0204.
We expect full imple-
. mentation.of this QA/QC program and completion of testing of your technicians
prior to issuance of the fuel load license.
This item is discussed in
,
Sections 2.b., 3, and 5.
We understand you plan to take positive steps
within'the month of September to correct this situation.
>
%)
/
$
X
'
8510220005 051000
g(
DR
ADOCK O
O
.
!
.
.
.
The Cleveland Electric Illuminating
2
OCT 0 81985
Company
~
In accordance with 10 CFR 2.790 of the. Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
-l
W. D. Shafer, Chief
'
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-440/85058(DRSS); and
No. 50-441/85021(DRSS)
,
cc w/ enclosure:
J. J._Waldron, Manager, Perry
'
.
Plant Technical Department
M. D. Lyster, Manager, Perry Plant
Operations Department
L. O. Beck, General Supervising
Engineer, Nuclear Licensing and
Fuel Management Section
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Terry J. Lodge, Esq.
,
,
James W. Harris, State of Ohio
'
Robert H. Quillin, Ohio
Department of Health
Douglas Weiss, Licensee Fe.e
Management Branch
k9
i
RIII
III-
RIII
RII
/
F
'fb
SW~
-f]]M-
({Q
1
~0sstmann/jp
.
Itzman
Schumacher
Knop
e
-10/04/85
L