Forwards Insp Rept 50-458/85-09 on 850311-0810 & Notice of Violation
ML20140D749
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/29/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20140D752 List:
References
NUDOCS 8602030108
Download: ML20140D749 (2)


See also: IR 05000311/2008010

Text

1 J

In Reply Refer To:

Docket: 50-458/85-09 M 20 IS86

.

.

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This refers to the inspection conducted by Mr. J. Tapia of this office during

the period March 11-15, April 1-5 and 22-25, May 14-16 and 21-24, June 3-6, and

August 6-10, 1985, of activities authorized by NRC Construction Permit CPPR-145

for River Bend Station, and to the discussion of our findings with

Messrs. Benkert and Coones and other members of your staff at the conclusion of

the inspection.

Areas examined during the inspection included the design process for seismic

Category 1 cable tray and conduit supports. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors. These findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:RS RSB/E RPB/B RSBM RPB di

JTapi REIrela DRHunter JEGagliatdo

I ff}/ 6 \ /L*2'86 Jaudofn

) /2f % j- \ }2$/86 / h ) /,8 6'

9602030108 860.129 i

PDR

i

ADDCK 05000459

PDR

60

i

L

s *

Gulf States Utilities -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Or;;.irmi Ei. ned By

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-458/85-09

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University,

Government Documents Department

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015)
  • MIS System *RSB
  • RSTS Operator Section Chief, ES
  • R&SPB
  • RIV File
  • w/766