ML20140D749
| ML20140D749 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 01/29/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20140D752 | List: |
| References | |
| NUDOCS 8602030108 | |
| Download: ML20140D749 (2) | |
See also: IR 05000311/2008010
Text
J
1
In Reply Refer To:
M 20 IS86
Docket:
50-458/85-09
.
.
Gulf States Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
P. O. Box 2951
Beaumont, Texas 77704
Gentlemen:
This refers to the inspection conducted by Mr. J. Tapia of this office during
the period March 11-15, April 1-5 and 22-25, May 14-16 and 21-24, June 3-6, and
August 6-10, 1985, of activities authorized by NRC Construction Permit CPPR-145
for River Bend Station, and to the discussion of our findings with
Messrs. Benkert and Coones and other members of your staff at the conclusion of
the inspection.
Areas examined during the inspection included the design process for seismic
Category 1 cable tray and conduit supports.
Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
These findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RSBM
RPB
di
RIV:RS
RSB/E
RPB/B
DRHunter
JEGagliatdo
Jaudofn j-
JTapi
REIrela
) /2f %
\\ }2$/86
/ h ) /,8 6'
I ff}/ 6
\\ /L*2'86
9602030108 860.129
i
ADDCK 05000459
60
i
i
L
s
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Or;;.irmi Ei. ned By
J. E. Gagliardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/85-09
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bcc distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
Section Chief, ES
- R&SPB
- RIV File
- w/766