ML20147B938

From kanterella
Revision as of 12:30, 25 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 780914 Ltr Informing NRC of Steps Taken to Correct Violations Noted in 780816 Ltr
ML20147B938
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/04/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 7810110228
Download: ML20147B938 (1)


Text

_ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

,A

  1. "U UNITED STATES cd 4

% ,k fs pg NUCLEAR REGULATORY COMMISSION j

in

"',jC . REGloN lit 799 ROOSEVELT ROAD

~

$, , GLEN E LLYN, ILLINotS 60137 '

OCT 4 1978-Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

Thank you for your letter dated September 14, 1978, informing us of the steps you have taken to correct the noncompliance identified in our letter dated August 16, 1978. We will examine your corrective action during a future inspect 1on.

Your cooperation with us is appreciated.

Sincerely, hf.

James G. Keppler 1-Director Central Files R.eproduction Unit NRC 20b

,MDR Local PDR NSIC TIC U. Young Park, Power Siting Commission  ;

1 7 1 p 1 1 , 3 a . fr _

!