ML20147B938
| ML20147B938 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/04/1978 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| NUDOCS 7810110228 | |
| Download: ML20147B938 (1) | |
Text
_. _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
,A
- "U
%,k 4
UNITED STATES cd fs NUCLEAR REGULATORY COMMISSION pg j
"',j
. REGloN lit in C
799 ROOSEVELT ROAD
~
GLEN E LLYN, ILLINotS 60137 '
OCT 4 1978-Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President-Engineering Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
Thank you for your letter dated September 14, 1978, informing us of the steps you have taken to correct the noncompliance identified in our letter dated August 16, 1978. We will examine your corrective action during a future inspect 1on.
Your cooperation with us is appreciated.
Sincerely, hf.
1-James G. Keppler Director Central Files R.eproduction Unit NRC 20b
,MDR Local PDR NSIC TIC U. Young Park, Power Siting Commission 1 7 1 p 1 1, 3 a. fr
!