Monthly Operating Rept for Mar 1995 for Waterford 3
ML20082J035
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0065, W3F1-95-65, NUDOCS 9504180053
Download: ML20082J035 (7)


Text

.

{*,V.! &

=== ENTERGY

  • M*4".A 70066e"'"

Kiliona. l Tel 504 739 6774 R. F. Burski j Director Nuckal Gatety I veerte 3 j i W3F1-95-0065 A4.05-PR l April 14,1995 l

l U.S. Nuclear Regulatory Commission l l ATTN: Document Control Desk Washington, D.C. 20555 l

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report i I

Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of March, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

I Very truly yours, R.F. Burski Director Nuclear Safety RFB/CJT/ssf Attachment cc: L.J. Callan (NRC Region IV)

C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office

'9504180053 950331 "

PDR ADOCK 05000382 /

R- PDR 8 l

3

NRC MONTHLY OPERATING REPORT 1

SUMMARY

OF OPERATIONS WATERFORD 3 l for March,1995 1 1

The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.

. \

1 i l 4

I l

1 i

l o

i t

1 l

< l l

4 4

4 I

  1. 7/9$ Page : I of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for March,1995 There were no pressurizer safety valve failures or challenges experienced during the month.

&l&$ . Page: 2 of 6

OPERATING DATA REPORT i- DOCKET NUMBER : 50-382 4

UNIT NAME : WATERFORD 3 I DATE OF REPORT : April 7,1995 l l COMPLETED BY : D. S. Freeman  !

l 4

TELEPHONE : (504) 464-3352 h

j .Q, PERATING STATUS i

1. Reporting Period : March,1995
Gross Hours in Reporting Period
744 i
2. Currently Authorized Power Level (MWt): 3,390 Maximum Dependable Capacity (Net MWe) i 1,075 j Design Electrical Rating (Net MWe) : j a04
3. ' Power Level to which Restricted (if any) (Net MWr) : N/A
4. Reason for Restriction (if any) : -m 1/A ,

! THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 744.0 2,160.0 70,882.s
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 744.0 2.160.0 70,004.3 j 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i 9. Gross Thermal Energy Generated (MWH) 2,516,977 7,30s,275 231,637,ss4
10. Gross Electrical Energy Generated (MWH) 843,810 2,439,780 77,174,240 l I
11. Net Electrical energy Generated (MWH) 809,736 2,340,52s 73,582,s94

! 12. Reactor Service Factor _

100.0 100.0 s5.0

13. Reactor Availability Factor 100.0 100.0 85.0 j 14. Unit Service Factor 100.0 100.0 s3.9 I 15. Unit Availability Factor 100.0 :100.0 83.9 i 16. Unit Capacity Factor (using MDC) 101.2 100.8 s2.0
17. Unit Capacity Factor (Using DER) 98.6 98.2 79.9
18. Unit Forced Outage Rate 0.0 0.0 3.1 i

4'7/95 Page: 3 of 6

- - p -3 - -

4 1

OPERATING DATA REPORT

, DOCKET NUMBER : 50-382 ,

i UNIT NAME : WATERFORD 3 DATE OF REPORT : April 7,1995

COMPLETED BY
D. S. Freeman

] TELEPHONE: (504) 464-3352 i

OPERATING STATUS (Cont.)

I i 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

REFUEL - September 15,1995 - 60 Days j

20. If Shutdown at end of report period, estimated date of startup
N/A-s
21. Unit in Commercial Operation

! THIS YEAR TO I

MONTH DATE CUMULATIVE 1

l 22. Hours in Reporting Period 744 2,160 83,425

23. Unit Forced Outage Hours 0.0 0.0 2,210.2 i

4

24. Nameplate Rating (Gross MWe) : 1,200 l Max. Dependable Capacity (Gross MWe) : 1,120 i 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, i j give the reasons : l N/A a

a t

(

N ess r.a : 4 d e

i. -

i ~

! . AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NUMBER
50-382

] UNIT NAME : WATERFORD 3

DATE OF REPORT
April 7,1995 COMPLETED BY :

D. S. Freeman i TELEPHONE: (504) 464-3352 Reporting Period : March, 199.{,

DAY Avg. Power Level DAY Avg. Power Level l 1 1,090 16 1,090 l 2 1,090 .17 1,091 3 1,090 18 1,091
4 1,091 19 1,091 5 1,091 20 1,091 ,
6 1,090 21 1,091 7 1,091 22 1,091

]

j 8 1,090 23 1,090 9 1,091 24 1,090 i 10 1,091 25 1,035 11 1,091 26 1,089

12 1,090 27 1,091 13 1,091 28 1,090

]

3 14 1,091 29' 1,091

15 1,091 30 1,091 j 31 1,079

) INSTRUCTIONS :

{ On this form, list the average daily unit power level in MWe-Net for each day in the  :

I j reportmg month. Compute to the nearest whole megawatt.

i l i

r i

j f

mm

[ .

w .r .

-. -. m er- e- , - - - _ _

I 4

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME . WATERFORD 3 l DATE OF REPORT : April 7,1995 COMPLETED BY : D. S. Freeman

TELEPHONE
(504) 464-3352 I

REPORTING PERIOD : March,1995 Date

  • Duration ** Shutdown Cause, Comments and l Number (yymmdd) Type (Hours) Reason Method Corrective Actions I

NONE l

i a na l TYPE REASON

! F - Forced A - Equipment Failua (explain) l S - Scheduled B - Meantenance or Test

! C - Refueling

, D - Regulatory Restriction a**

l E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) j @ 95 Page: 6 of 6

('