ML20204B514

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1999 for Waterford 3.With
ML20204B514
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/28/1999
From: Ewing E, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-99-0047, W3F1-99-47, NUDOCS 9903220145
Download: ML20204B514 (7)


Text

.~ _ - -. .. ._ . . . . - . -.

, e Enti Oparitions, Inc.

K0lona, LA 70066 Tel 504 739 6242 Early C. Ewing, Ill u Ie ety & Regulatory Affans W3F1-99-0047 A4.05 PR March 15,1999 U.S. Nuclear Regulatory Commission ATTN. Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the )

month of February 1999. This report is submitted per Section 6.9.1.6 of the l Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Should you have any questions regarding the above, please contact me at (504) 739-6242 or A.L. Lewis at (504) 739-6726.  :

Very truly yours, h -

E.C. Ewing - t Director Nuclear Safety & Regulatory Affairs ECE/ALL/rtk Attachment 190Oc - ,p cc: E.W, Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

2 J. Smith, N.S. Reynolds, B. Lewis (Utility Data institute, Inc.),

P. Lewis (INPO Records Center), NRC Resident Inspectors Office

~

9903220145 990228 PDR ADOCK 05000392.'i R PDR y

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for February,1999 The unit operated at an average reactor power level of 56.7% for the montli, having shut down on February 19th to commence Refuel Outage #9 (RFO9). The unit was in a Reactor Power Coastdown for the first part of the month.

l 3/1[r19 Pave: 1#6

j PRESSURIZER SAFETY VALVE

- . FAILURES AND CHALLENGES i WATERFORD 3 .

for February,1999 i

There wero 1.0 pressurizer safety valve failures or challenges experienced during the month, i i

l

)

l l

l 3

J l

Page ' 2 of 6 I

OPERATING DATA REPORT

l
DOCKET NUMBER
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 9,1999 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS
1. Reporting Period -

February,1999 Gross Hours in Reporting Period . 672

2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) 1,075 Design Electrical Rating (Net MWe) . 1,104 1
3. Power Level to which Restricted (if any) (Net MWe) . N/A l
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 4ss.8 1,199.s 99,7s9.2
6. Reactor Reserve Shutdown Hours 0.0 o.o _

o.o j

7. Hours Generator was On-line 455.s 1,199.s 9s,ss3.3
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energv Generated (MWH) 1,291,559 3,77s,197 327,401,295
10. Gross Electrical Ei .gy Generated (MWH) 432,580 1,27s,19s 109, sis,2so
11. Net Electrical Energy Generated (MWH) 411,s9s 1,223,542 104,497,662
12. Reactor Service Factor s7.s 84.7 s4.s
13. Reactor Availability Factor 67.s s4.7 84.s
14. Unit Senrice Factor 67.s 84.7 ss.s ]
15. Unit Availability Factor 67.s 84.7 s3.s l
16. Unit Capacity Factor (using MDC) 57.0 80.4 82.s
17. Unit Capacity Factor (using DER) ss.s 7s.3 so.4
18. Unit Forced Outage Rate 0.0 0.0 3.9 l

l 3/1099 Page: 3 of 6

. ~ - - - - .. - - . - . .--

OPERATING DATA REPORT

- - DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 9, '999 COMPLETED BY : D. S. Freeman TELEPHONE (504)739-6575 l

OPERATING STATUS (Cont.)

i 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):

NONE

20. If Shutdown at end of report period, estimated date of startup : 3/31/99 3
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 672 1,416 117,745
23. Unit Forced Outage Hours o.o 0.0 3,ess.s
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe) 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A I

l l

l I

Puge: 446 3/1099

Y l,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 9,1999 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575-l l Reporting Period : February,1999 ( NET MWe )

i l

DAY Avg. Power Level DAY Avg. Power Level l 1 1,000 16 842 2 989 17 633

^

3 979 18 826 4 966 19 793

~

5 957 20 0 6 951 21 0 l 7 941 22 0 l 8 928 23 0 9 909 24 0

~

10 902 25 0 11 894 26 0 12 884 27 0 13 866 28 0 14 855 15 849 l

l lNSTRUCTIONS :

l l

l On this form, list the average daily unit power level in MWe-Net for each i day in the reporting month. Compute to the nearest whole megawatt.

I Reflects On-Line Net Generation.

91499 Page: $ d 6

. .- ...- - .-. . .. - - . - . . - -. . . . ~ - .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 9,1999 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 i REPORTING PERIOD : February,1999

. Outage Date Duration Shutdown Cause, Comments and '

Number (yymmdd) Type (Hours) Reason Method Corrective Actions 99-01 990219 S 216.3 C 1 Unit removed from service to begin Refuel Outage 9.

TYPE! REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 1 4 - Continuation from Previous Period 5 - Power Reduction

_ 6 - Other (explain) i M w99 Page : 6 of 6