NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for July,1999 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
1
~
9908160074 990812 DR ADOCK 050003 2 L'i2.99 Page : I of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for July,1999 There were no pressurizer safety valve failures or challenges experienced during the month.
Page 2 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 12,1999 COMPLETED BY :
Bruce E. Meyers TELEPHONE :
(504) 739-6426 OPERATING STATUS
- 1. Reporting Period July,1999 j
Gross Hours in Reporting Period 744 4
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A i
THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 4,067.5 102,657.0
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
- 7. Hours Generator was On-line 744.0 4,026.9 101,480.4
- 8. Unit Reserve Shutdown Hours o.o 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,521,17s 13,240,098 336,863,196
- 10. Gross Electrical Energy Generated (MWH) 855,904 4,493,831 112,733,896
- 11. Net Electrical Energy Generated (MWH) 818,890 4,305,237 107,579,357
- 12. Reactor Service Factor 100.0 80.0 84.5
- 13. Reactor Availability Factor 100.0 80.0 84.s j
- 14. Unit Service Factor 100.0 79.2 83.6
- 15. Unit Availability Factor 100.0 79.2 83.6
- 16. Unit Capacity Factor (using MDC) 102.4 78.7 82.4
- 17. Unit Capacity Factor (using DER) 99.7 76.7 80.3
- 18. Unit Forced Outage Rate 0.0 1.3 3.8 M19e Page 3 of 6
OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 12,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE : (504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 5,087 121,41s
- 23. Unit Forced Outage Hours o.o 53.0 4,ois.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A l
1 base 4 et 6 g.,
. ' ~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 12,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504)739-6426 Reporting Period :
July,1999
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 4
1 1,105 16 1,100 2
1,100 17 1,101 3
1,106 18 1,101 4
1,106 19 1,101 5
1,105 20 1,101 6
1,105 21 1,100 7
1,105 22 1,099 8
1,104 23 1,099 9
1,103 24 1,099 10 1,103 25 1,098 11 1,102 26 1,098 12 1,103 27 1,097 13 1,102 28 1,096 14 1,101 29 1,095 15 1,101 30 1,094
~
31 1,093 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the repo, ting month. Compute to the nearest whole megawatt.
Reflects 09-L'ne Net Generation.
Page: $ of 6
- an19,
e 2
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 12,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE : (504) 739-6426 REPORTING PERIOD :
July,1999 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA J
l TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain)
]
4 - Continuation from Previous Period j
5 - Power Reduction 6 - Other (explain)
I 44 90 Page 6 of 6