Monthly Operating Rept for Nov 1995 for Waterford 3 Ses
ML20095E615
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/30/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0204, W3F1-95-204, NUDOCS 9512180003
Download: ML20095E615 (7)


Text

,

~

$v ENTERGY ETle"*"'""*-

\

- KW, ora LA 70066

, Tel 504 739 6774 R. F. Burski Drocta.

mm saw Wxerford 3 W3F1-95-0204 A4.05 PR December 14, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating -

statistics for the month of November, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office 00609 9i a

1 9512190003 951130 l PDR. ADOCK 05000382 R__. _

,PDR

. NRC MONTHLY OPERATING REPORT l

SUMMARY

OF OPERATIONS l WATERFORD 3 l

for November, 1995 l

! I i i l 1 l The unit completed Refueling Outage #7 during the month, resulting in an average I reactor power level of 79.1% for the time-period.

I

?

l l

l l

I l

? l i

l l

l I ,

I l l i l

l l

I l

r 4

12/Y95 Page : 1 of 6

. PRESSURIZER SAFETY VALVE

~

FAILURES AND CHALLENGES -

WATERFORD 3 for November, 1995 l

There were no pressurizer safety valve failures or challenges experienced during the month. i l

l l

I l

I i

i I

I I

l 11"i95 Page: 2 of 6

. 4 OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 5, 1995 COMPLETED BY : D. S. Freeman i TELEPHONE : (504) 464-3352 ,

OPERATING STATUS

1. Reporting Period  : November, 1995 Gross Hours in Reporting Period  : 720
2. Currently Authorized Power Level (MWt) : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe) : 1,104
3. Power Level to which Restricted (if any) (Net MWe) : N/A
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 653.2 6,565.9 75.288.7 1
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 605.1 6.497.9 74,342.2
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 1,929.688 21,849,065 246,178,674
10. Gross Electrical Energy Generated (MWH) 644,920 7,275,330 82,009.790
11. Net Electrical Energy Generated (MWH) 612,633 6,949,559 78,191,925
12. Reactor Service Factor 90.7 81.9 84.3
13. Reactor Availability Factor 90.7 81.9 84.3
14. Unit Service Factor 84.0 81.1 83.3
15. Unit Availability Factor 84.0 81.1 83.3
16. Unit Capacity Factor (using MDC) 79.2 80.6 81.5
17. Unit Capacity Factor (using DER) 77.1 78.5 79.3
18. Unit Forced Outage Rate 0.0 6.7 3.5 12/595 Page: 3 of 6

[ ,

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 5, 1995 COMPLETED BY : D. S. Freeman

, TELEPHONE : (504) 464-3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup: N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 720 8,016 89.281
23. Unit Forced Outage Hours 0.0 463.0 2.673.2
24. Nameplate Rating (Gross MWe) : 1.200 Max. Dependable Capacity (Gross MWe) : 1.120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A I

12/5s$ Page: 4 of 6

4

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 i UNIT NAME : WATERFORD 3 DATE OF REPORT : December 5, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 l

Reporting Period : November, 1995 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 (31) 16 1,095 2 (40) 17 1,096 3- (40) 18 1,096 4 (39) 19 1,096 l 5 (13) 20 1,096 1 6 281 21 1,096 7 660 22 1,096 8 702 23 1,096 '

9 1,044 24 1,096 10 1,089 25 1,097 11 1,093 26 1,097

, 12 1,094 27 1,096 '

13 1,095 28 1,097 14 1,095 29 1,097 15 1,095 30 1,095 31 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each

day in the reporting month. Compute to the nearest whole megawatt.

l l

r i

12/59$ Page: 5 of 6

\

., UNIT SHUTDOWNS AND POWER REDUCTIONS i 4

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3

' DATE OF REPORT : December 5, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 j REPORTING PERIOD : November, 1995 Date

  • Duration ** Shutdown Cause, Comments and l Number (yymmdd) Type (Hours) Reason Method Corrective Actions  ;

95-02 950922 S 114.42 C 4 Unit removed from service I to begin Refuel Outage 7. l Outage was continued from I the previous period.  ;

95-03 951106 S 0.52 B 1 Generator taken off-grid to  ;

conduct post-refuel Turbine l Overspeed Trip Test. l I

l IYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction

      • E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - 0perational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 11T93 Page : 6 of 6