Monthly Operating Rept for Oct 1996 for Waterford 3 Ses
ML20134K544
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1996
From: James Fisicaro, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0197, W3F1-96-197, NUDOCS 9611190178
Download: ML20134K544 (7)


Text

y. .

Ente gy Operrtlins.Inc.

Killona. LA 70066 Tel 504 739 6242 ames J. Fisicaro

%T:*2T W3F1-96-0197 A4.05 PR November 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of October,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, J.J. Fisicaro Director Nuclear Safety JJF/DFL/ssf Attachment cc: L.J. Callan, NRC Region IV I

C.P. Patel, NRC-NRR R.B. McGehee hql '

N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center) 30049 NRC Resident inspectors Office 9611190178 961031 PDR ADOCK 05000382 R PDR

l -

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS l WATERFORD 3 for October,1996 1

The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period.

i i

I l

4 i

l l

l 4

4 I

(3w Patie . I of 6

(

4

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for October,1996 i

i There were no pressurizer safety valve failures or challenges experienced curing the month.

4

)

I a

k i

a i

i i

a 1

J i

J 4

e f

i i .

4 IIN Page 2 of 6 e

OPERATING DATA REPORT f DOCKET NUMBER : 50-382 j UNIT NAME : WATERFORD 3

, DATE OF REPORT : November 5,1996 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352

. OPERATING STATUS

1. Reporting Period  : October,1996 Gross Hours in Reporting Period -

745

2. Currently Authorized Power Level (MWt)  : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075 l

Design Electrical Rating (Net MWe)  : 1,104 -

3. Power Level to which Restricted (if any) (Net MWe) . N/A
4. Reason for Restriction (if any)  : N/A l

THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 745.0 6,807.5 82,840.1
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 745.0 6,774.3 81,860.4
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,514,187 22,913,788 271,610,228
10. Gross Electrical Energy Generated (MWH) 641,590 7,709,890 90,568,260
11. Net Electrical Energy Generated (MWH) 806,938 7,376,219 86,382,034
12. Reactor Service Factor 100.0 93.0 85.1
13. Reactor Availability Factor 100.0 93.0 85.1
14. Unit Service Factor 100.0 92.5 84.1
15. Unit Availability Factor 100.0 92.5 84.1
16. Unit Capacity Factor (using MDC) 100.8 93.7 82.5
17. Unit Capacity Factor (using DER) 98.1 91.3 80.4
18. Unit Forced Outage Rate 0.0 7.5 3.8 Page 3 of 6

! [ OPERATING DATA REPORT l

DOCKET NUMBER : 50-382

UNIT NAME
WATERFORD 3 DATE OF REPORT : November 5,1996
COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 4

OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

1 NONE-l

20. If Shutdown at end of report period, estimated date of startup : N/A

~ 21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE. CUMULATIVE i 22. Hours in Reporting Period 745 7,320 97,345

. 23. Unit Forced Outage Hours 0.0 545.7 3,218.9 l 24. Nameplate Rating (Gross MWe) . 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120 l

25. If changes occur in capacity ratings (Items 2 and 24) since the last report,

! give the reasons :

! N/A i

i a

j t idN Page : 4 of 6

i*

l . .-

l AVERAGE DAILY UNIT POWER LEVEL j DOCKET NUMBER : 50-382 s

UNIT NAME : WATERFORD 3 2

DATE OF REPORT : November 5,1996 j COMPLETED BY : D. S. Freeman i

TELEPHONE: (504) 464-3352 l

b l

.i i

I Reporting Period : October,1996 ( NET MWe )

l 4

DAY Avg. Power Level DAY Avg. Power Level 1 1,080 16 1,089 l 2 1,081 17 1,088 j 3 1,081 18 1,088 l 4 1,082 19 1,088

{ 5 1,084 20 1,089 6 1,085 21 1,090 7 1,085 22 1,088 l l

8 1,086 23 1,090 l 9 1,088 24 1,091
10 1,088 25 1,081
11 1,089 26 975 j 12 1,090 27 1,080 13 1,089 28 1,087

.h 14 1,089 29 1,088 15 1,089 30 1,089 31 1,089 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Page $ of 6

1

..... l UNIT SHUTDOWNS AND POWER REDUCTIONS I i

DOCKET NUMBER : 50-382 }

UNIT NAME : WATERFORD 3 i DATE OF REPORT : November 5,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 REPORTING PERIOD : October,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE l

l 4

1 e se TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 1t% Page 6 of 6