.. - _ _
l Enti gy Operations,Inc.
e Killona, LA 70066 J
Tel 504 739 6242 1
Early C. Ewing,111 Safety & Regulatory Af' airs a
W3F1-98-0200 A4.05 PR December 15,1998 U.S. Nuclear Regulatory Commission i
ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of November,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 739-6242 or A.L. Lewis at (504) 739-6726.
Very truly yours, E.C. Ewing l
Director Nuclear Safety & Regulatory Affairs
,[
1 ECE/ALUssf
, d' Attachment 9
,<.ss cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
P. Lewis (INPO Records Center), NRC Resident inspectors Office 9812170082 981130 C
PDR ADOCK 05000382
{9 R
pg
1 j
NRC MONTHLY OPERATING REPORT i
SUMMARY
OF OPERATIONS i
WATERFORD 3 i
for November,1998 The unit operated at an average reactor power level of 57.2% having experienced a forced l
outage during the period.
I I
4
+
12,9 98 Page I of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for November,1998 i
There were no pressurizer safety valve failures or challenges experienced during the month.
4 i
11999 Page. 2 of 6
\\
OPERATING DATA REPORT j
i DOCKET NUMBER : 50-382 i
UNIT NAME : WATERFORD 3 DATE OF REPORT :
December 8,1998 COMPLETED BY :
D. S. Freeman l
TELEPHONE: (504) 739-6575 l
OPERATING STATUS 4
l l
- 1. Reporting Period November,1998 i
j Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) 3,390
~
Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104 i
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A i
THIS YEAR TO j
MONTH DATE CUMULATIVE l
- 5. Number of Hours Reactor was Critical 414.5 7,352.0 s7,es4.7
(
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0 I
- 7. Hours Generator was On-line 414.5 7,2s4.7 96,770.5
- 8. Unit Reserve Shutdown Hours o.o o.o 0.o
)
- 9. Gross Thermal Energy Generated (MWH) 1,396,144 24,37s,162 321,380,773 j'
- 10. Gross Electrical Energy Generated (MWH) 47s,s64 s,252,so2 107,472,840 l
- 11. Net Electrical Energy Generated (MWH) 451,070 7,ss7,034 102,540,371
- 12. Reactor Service Factor 57.s 91.7 84.7 l
- 13. Reactor Availability Factor 57.6 91.7 84.7 l
- 14. Unit Service Factor 57.6 90 e s3.7
- 15. Unit Availability Factor 57.s so.s s3.7 i
- 16. Unit Capacity Factor (using MDC) 58.3 91.s 82.5 j
- 17. Unit Capacity Factor (using DER) 56.7 89.1 80.4 j
- 18. Unit Forced Outage Rate 42.4 s.c 3.s i
12/W98 Page. 3 of 6
OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
December 8,1998 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL OUTAGE #9 - commencing on February 19,1999 - 40 day outage
- 20. If Shutdown at end of report period, estimated date of startup :
12/3/98
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 720 s,ois 115,58s
- 23. Unit Forced Outage Hours 30s.s 683.7 3,902.7
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A f
11998 Page 4 of 6
i 2
AVERAGE DAILY UNIT POWER LEVEL
?
DOCKET NUMBER : 50-382 j
UNIT NAME : WATERFORD 3 DATE OF REPORT : December 8,1998 i
COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6575 l
f Reporting Period :
November,1998
( NET MWe )
l l
DAY Avg. Power Level DAY Avg. Power Level 3
1 j
1-1,108 16 1,113
!l 2
1,109 17 1,111 3
1,109 18 248 4
1,109 19 (28) 5 1,109 20 (18) g 6
1,109 21 (17) l 7
1,109 22 (23) l 8
1,110 23 (29)
~
l 9
1,109 24 (33) i 10 1,109 25 (30) l 11 1,110 26 (19) j 12 1,110 27 (17) i 13 1,063 28 (17) 14 1,109 29 (20) 15 1,111 30 (22)
INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
12/9/9, Page $ of 6
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 l
DATE OF REPORT :
December 8,1998 COMPLETED BY :
D. S. Freeman l
TELEPHONE: (504)739-6575 l
REPORTING PERIOD :
November,1998 j
j Outage Date Duration Shutdown Cause, Comments and 1
Number (yymmdd) Type (Hours) Reason Method Corrective Actions 98-06 981118 F
305.5 A
1 Unidentified leakrate of almost 1 gpm was calculated -
j preliminary investigation revealed it to be from Reactor Coolant Pump 2B.
Waterford 3 was shutdown and the RCP 2B seal was replaced.
(See CR WF3-1998-1447 for further details.)
i i
b e
i i
I i
TYPE REASON j
F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling i
D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative
)
2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) l 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) i.
type Page 6 of 6
.