- [ g
= ENTERGY l3T"""" '"-
Kilic/n L A 70066 Tel 504 739 6774 a
R. F. Burski D\\recht Nns SaWty i
Waierford 3 W3F1-96-0032 A4.05 PR l
March 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
j Attached is the subject monthly report which covers the operating statistics for the month of February,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFUssf Attachment cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center) 180093 NRC Resident inspectors Office 9603200153 960229
[62-y PDR ADOCK 05000382 R
PDR fff
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 i
for February,1996 1
4 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
l M1w w I of a L
1 PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for February,1996 l
l There were no pressurizer safety valve failures or challenges experienced during the month.
l l
l l
1 l
l I
l I.
1 1
1 i
m.
% 2a.
!j. '. '
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
March 12,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 l
4 OPERATING STATUS
- 1. Reporting Period February,1996 1
Gross Hours in Reporting Period ses
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was' Critical ses.o 1,440.0 77,472.7
- 6. Reactor Reserve Shutdown Hours o.o c.o 0.0
- 7. Hours Generator was On-lirie ses.o 1,440.o 7s,s26.2
- 8. Unit Reserve Shutdown Hours o.o 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,357,937 4,s75,023 253,671,464
- 10. Gross Electrical Energy Generated (MWH) 797,270 1,64s,220 s4, sos,sso
- 11. Net Electrical Energy Generated (MWH) 764,513 1,s77,as4 so,ssa,s49
- 12. Reactor Service Factor 100.o 100.o s4.7
- 13. Reactor Availability Factor 100.0 100.0 s4.7
- 14. Unit Service Factor 100.0 100.o as.7
- 15. Unit Availability Factor 100.0 100.o 83.7
- 16. Unit Capacity Factor (using MDC) 102.2 101.s s2.0
- 17. Unit Capacity Factor (using DER)
_ 99.5 9s.2 79.s i
- 18. Unit Forced Outage Rate 0.0 0.0 3.4 m e.
3.r.
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
March 12,1996 COMPLETED BY :
D. S. Freeman I
TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period ses 1,440 si,4ss
- 23. Unit Forced Outage Hours o.o 0.0 2,s73.2
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A mm.
e
..e.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
March 12,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 Reporting Period :
February,1996
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,095 16 1,096 2
1,095 17 1,096 3
1,096 18 1,097 4
1,096 19 1,097 5
1,096 20 1,097 6
1,096 21 1,097 7
1,097 22 1,097 8
1,096 23 1,103 9
1,097 24 1,108 10 1,097 25 1,107 11 1,083 26 1,107 12 1,097 27 1,106 13 1,098 28 1,106 14 1,098 29 1,106 15 1,098 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each
. day in the reporting month. Compute to the nearest whole megawatt.
m e.
e
.r.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
March 12,1996 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 464-3352 REPORTING PERIOD :
February,1996 Date Duration Shutdown Cause, Comments and
)
Number (yymmdd) Type (Hours) Reason Method Corrective Actions j
NONE 1
1 l
TYPE REASON F - Forced A - Equipment Failure (explain) j S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) i l