ML20106H074

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for Waterford 3 Ses
ML20106H074
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/29/1996
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0032, W3F1-96-32, NUDOCS 9603200153
Download: ML20106H074 (7)


Text

.

[ g

= ENTERGY l3T"""" '"-

Kilic/n L A 70066 l

a Tel 504 739 6774 R. F. Burski l D\recht l

Nns SaWty i Waierford 3 W3F1-96-0032 A4.05 i PR l

March 14,1996 l l

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 l Monthly Operating Report 1

Gentlemen: j Attached is the subject monthly report which covers the operating statistics for the month of February,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFUssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center) 180093 NRC Resident inspectors Office 9603200153 960229 [62- y PDR ADOCK 05000382 R PDR f ff

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS i

WATERFORD 3 for February,1996 1

4 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.

l l

l l

l l

M1w w I of a L

1 1 .

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for February,1996 l

l There were no pressurizer safety valve failures or challenges experienced during the month.

l l

l l

I 1

l l

I l

I.

1 1

1 i

m.  % 2a.

j . '. '

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 12,1996 COMPLETED BY :

)

D. S. Freeman '

TELEPHONE: (504) 464-3352 l 4

OPERATING STATUS

1. Reporting Period  : February,1996 1 Gross Hours in Reporting Period . ses
2. Currently Authorized Power Level (MWt)  : 3,390 Maximum Dependable Capacity (Net MWe) : 1,07s Design Electrical Rating (Net MWe)  : 1,104 1
3. Power Level to which Restricted (if any) (Net MWe)  : N/A
4. Reason for Restriction (if any) -

N/A THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was' Critical ses.o 1,440.0 77,472.7
6. Reactor Reserve Shutdown Hours o.o c.o 0.0
7. Hours Generator was On-lirie ses.o 1,440.o 7s,s26.2
8. Unit Reserve Shutdown Hours o.o 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,357,937 4,s75,023 253,671,464
10. Gross Electrical Energy Generated (MWH) 797,270 1,64s,220 s4, sos,sso
11. Net Electrical Energy Generated (MWH) 764,513 1,s77,as4 so,ssa,s49
12. Reactor Service Factor 100.o 100.o s4.7 I
13. Reactor Availability Factor 100.0 100.0 ,

s4.7

14. Unit Service Factor 100.0 100.o as.7
15. Unit Availability Factor 100.0 100.o 83.7
16. Unit Capacity Factor (using MDC) 102.2 101.s s2.0
17. Unit Capacity Factor (using DER) _ 99.5 9s.2 79.s i
18. Unit Forced Outage Rate 0.0 0.0 3.4 m e. 3 .r .

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 12,1996 COMPLETED BY : D. S. Freeman I

TELEPHONE: (504) 464-3352 .,

OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period ses 1,440 si,4ss
23. Unit Forced Outage Hours o.o 0.0 2,s73.2
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120
25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :

N/A mm. e . .e .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 12,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 Reporting Period : February,1996 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,095 16 1,096 2 1,095 17 1,096 3 1,096 18 1,097 4 1,096 19 1,097 5 1,096 20 1,097 6 1,096 21 1,097 7 1,097 22 1,097 8 1,096 23 1,103 ,

9 1,097 24 1,108 10 1,097 25 1,107 l 11 1,083 26 1,107 12 1,097 27 1,106 13 1,098 28 1,106 14 1,098 29 1,106 15 1,098 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each

. day in the reporting month. Compute to the nearest whole megawatt.

m e. e .r .

  • l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 12,1996 l COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 REPORTING PERIOD : February,1996 Date Duration Shutdown Cause, Comments and )

Number (yymmdd) Type (Hours) Reason Method Corrective Actions

_ j NONE l

1 l

1 l

  • ., l l

TYPE REASON F - Forced A - Equipment Failure (explain) j S - Scheduled B - Maintenance or Test C - Refueling l D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period l 5 - Power Reduction  !

6 - Other (explain) i 1

l l

m ,. r.a.

,