Monthly Operating Rept for Jan 1997 for Waterford 3 Ses
ML20138K584
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1997
From: Freeman D, Gaudet T
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-97-0027, W3F1-97-27, NUDOCS 9702190052
Download: ML20138K584 (7)


Text

-

Entergy l"M?a""""' '"*-

' Operations rgygg W3F1-97-0027 A4.05 PR February 13,1997 U.S. Nuclear Regulatory Commission A1TN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of January,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Should you have any questions regarding the above, please contact me at (504) 739-6666 or David Litolff at (504) 739-6693.

Very truly yours, T.J. Gaudet Acting - Director i

Nuclear Safety & Regulatory Affairs jY TJG/DFL/ssf Attachment cc:

L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR),

R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),

J.T. Wheelock (INPO Records Center), NRC Resident inspectors Offira i

~

9702190052 970131 I

ADOCK0500g2 DR j

l NRC MONTHLY OPERATING REPORT l

i

SUMMARY

OF OPERATIONS l

WATERFORD 3 for January,1997 l

The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.

t

[

l 2SM1 Page. I of 6

PRESSURIZER SAFETY VALVE 4

FAILURES AND CHALLENGES 1

WATERFORD 3 for January,1997 4

There were no pressurinr safety valve failures or challenges experienced during the month.

"4 k

i i

i i

6

)

l j

1 i.

I f

i e

1 4

9 2/197 Page: 2 of 6

.&s

,4 J

+.

A A4

._,,., tap s

2=-__.5 m.

+A4a mJ, _.

a:m m.m.

ma mmei.

_maAa.a OPERATING DATA REPORT

.i DOCKET NUMBER :

50-382 1

UNIT NAME : WATERFORD 3 DATE OF REPORT :

February 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 464 3352 OPERATING STATUS j

1. Reporting Period January,1997 Gross Hours in Reporting Period 744 1

4

2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :

1,075 Design Electrical Rating (Net MWe) 1,104

3. Power Level to which Restricted (if any) (Net MWe)

N/A

4. Reason for Restriction (if any)

N/A i

THIS YEAR TO f

MONTH DATE CUMULATIVE l

5. Number of Hours Reactor was Critical 744.0 744.0 85,048.1 2
6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
7. Hours Generator was On-line 744.0 744.0 84,0s8.4
8. Unit Reserve Shutdown Hours o.0 0.0 0.0

]

9. Gross Thermal Energy Generated (MWH) 2,520,469 2,520,469 27s,777,s34
10. Gross Electrical Energy Generated (MWH) 859,s30 859,s30 93,04s,910
11. Net Electrical Energy Generated (MWH) 824,90s 824,90s 88,757,566
12. Reactor Service Factor 100.0 100.0 85.4 I
13. Reactor Availability Factor 100.0 100.0 85.4 i
14. Unit Service Factor 100.0 100.0 84.4 j
15. Unit Availability Factor 100.0 100.0 84.4 I
16. Unit Capacity Factor (using MDC) 103.1 103.1 82.9
17. Unit Capacity Factor (using DER) 100.4 100.4 so.s l
18. Unit Forced Outage Rate 0.0 0.0 3.7 i

2/5M7 Page 3of6

1 i

OPERATING DATA REPORT DOCKET NUMBER : 50-382 4

UNIT NAME : WATERFORD 3 DATE OF REPORT : February 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)

+

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

I REFUEL - April 11,1997 - 34 days

20. If Shutdown at end of report period, estimated date of startup.:

N/A

21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 744 99,553
23. Unit Forced Outage Hours 0.0 0.0 3,218.9 1
24. Nameplate Rating (Gross MWe) 1,200 i

j Max. Dependable Capacity (Gross MWe) 1,120 i

25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A l

J k

4 k

l i

gw Page : 4 of 6 4

y

1 l

e AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :

50-382 i

UNIT NAME : WATERFORD 3 l

DATE OF REPORT :

February 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE: (504) 464-3352 I

Reporting Period.

January,1997

( NET MWe )

?

DAY Avg. Power Level DAY Avg. Power Level j

1 1,111 16 1,109 2

1,110 17 1,108 3

1,110 18 1,109 4

1,110 19 1,110 5

1,109 20 1,111 6

1,106 21 1,110 7

1,108 22 1,110 8

1,108 23 1,109 9

1,109 24 1,108 10 1,109 25 1,108 11 1,110 26 1,108 12 1,110 27 1,106 13 1,109 28 1,105 14 1,110 29 1,106 15 1,110 30 1,107 31 1,108 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each

]

day in the reporting month. Compute to the nearest whole megawatt.

1%7 Page S of 6

I r

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 j

DATE OF REPORT : February 5,1997 COMPLETED BY :

D. S. Freeman TELEPHONE: (504) 464-3352 1

REPORTING PERIOD :

January,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE

)

I i

)

TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period

'i - Power Reduction 6 - Other (explain)

Pape, 6 of 6