Text
_ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _. _ _ _ _ _
^
Ente gy Operatlins,Inc.
y Killona. LA 70066 l
Tel 604 739 6242
^
l Early C. Ewing. lit u ea Safety & Regulatory Affairs i
W3F1-98-0097 A4.05 PR May 12,1998 i
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of April,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
i Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739-6666.
Very truly yours, l
/
l E.C. Ewing
/ $
Director Nuclear Safety & Regulatory Affairs ECE/ PRS /ssf 1
4 Attachment I""'
cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Records Center), NRC Resident inspectors Office 1
9905200017 990430 PDR ADOCK 05000382 R
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for April,1998 The unit operated at an average reactor power level of 99.96% and experienced no l
shutdowns or significant power reductions during the period.
l l
l I
I l
l i
g.m Page : I of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 l
for April,1998 There were no pressurizer safety valve failures or challenges experienced during the month.
l l
l l
l l
l l
\\
l
\\
ywg Page 2 of 6
OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
May 5,1998 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS
- 1. Reporting Period April,1998 Gross Hours in Reporting Period 719
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(t4et MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 719.0 2,879.0 93,421.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 719.0 2,879.0 92,364.7
- 8. Unit Reserve Shutdown Hours o.o 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,436,390 9,747,956 306,729,567
- 10. Gross Electrical Energy Generated (MWH) 827,327 3,324,976 102,545,014
- 11. Net Electrical Energy Generated (MWH) 794,258 3,192,947 97,846,284
- 12. Reactor Service Factor 100.0 100.0 s4.6
- 13. Reactor Availability Factor 100.0 100.0 84.6
- 14. Unit Service Factor 100.0 100.0 83.6
- 15. Unit Availability Factor 100.0 100.0 83.6
- 16. Unit Capacity Factor (using MDC) 102.8 103.2 82.4
- 17. Unit Capacity Factor (using DER) 100.1 100.5 80.2
- 18. Unit Forced Outage Rate 0.0 0.0 3.4 MAS Page. 3 of 6
I OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : May 5,1998 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739-6575 OPERATING STATUS (Cont.)
I
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
i NONE f
l
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
j THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 719 2,879 110,448
- 23. Unit Forced Outage Hours o.o 0.0 3,218.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A i
i gag Page - 4 of 6
AVERAGE DAILY UNIT POWER LEVEL j
i l
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 1
DATE OF REPORT : May 5,1998 i
COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575 1
I l
Reporting Period :
April,1998
( NET MWe )
l f
DAY Avg. Power Level DAY Avg. Power Level 1
1,113 16 1,089 2
1,112 17 1,094 l
3 1,112 18 1,094 l
4 1,111 19 1,094 5
1,111 20 1,092 6
1,112 21 1,090 7
1,111 22 1,090 8
1,111 23 1,109
~
9 1,110 24 1,110 10 1,110 25 1,109 11 1,110 26 1,110 12 1,111 27 1,102 13 1,104 28 1,100 14 1,103 29 1,104 l
15 1,104 30 1,107 l INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
5/5/0,.
Page : 5 of 6
+ -
UNIT SHUTDOWNS AND POWER REDUCTIONS
~
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : May 5,1998 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504)739-6575 REPORTING PERIOD :
April,1998 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
Reason Method Corrective Actions NONE
)
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test j
C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
I W4 Page - 6 of 6 l
Q_____--.__---___.___
_ _ _..... _ _ - - _ - - _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _. _