| Site: | Waterford |
| Issue date: | 12/31/1997 |
| From: | Ewing E, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-98-0010, W3F1-98-10, NUDOCS 9801200029 | |
| Download: ML20198M230 (7) | |
Text
.
.iI
)
. pgpgg,gy g.g..un.sn..
==
ggC. Ewing, m r
u.<.
gpge annuww W3F1-98-0010 A4.05 PR January 15,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of December,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739-6666 Very truly yours, i
l
// L E.C. bwing Director Nuclear Safety & Regulatory Affairs IllH.R'1Hi'li.ll.lR.'
ECE/ PRS /csf Attachment cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Whe91ock (INPO Records Center), NRC Resioent inspectors Office
,,, o V U v. 6 9901200029 971231 PDR ADOCK 050003G2 R
-PDR
f I
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for December,199'l The unit operated at an average reactor power level of 99.95% and experienced no shutdowns or significant power reductions during the period.
1 1
1 I
f
=
r.i<.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for December,1997 There were no pressurizer safety valve failures or challenges experienced during the month.
1 1
l
- in*
r 2.c.
=. -. _
i
=,
OPER ATING DATA REPORT
~
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 7,1998 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504)739-6575 OPERATING STATUS i
- 1. Reporting Period December,1997 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 6,23y.c 90,542.7
- 6. Reactor Reserve Shutdown Hours 0.0 9.0 0.0
- 7. Hours Generator was On-line 744.0 6,161.4 s9,4ss.7
- 8. Unit Reserve Shutdown Hours o.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,520,958 20,724,246 296,9si,611 _
10, Gross Electrical Energy Generated (MWH) ass, sos 7,033,7s8 99,220,oss
- 11. Net Electrical Energy Generated (MWH) 824,245 s,720,s7s 94 ssa,337
- 12. Reactor Service Factor 100.0 71.2 84.2
- 13. Reactor Availability Factor 100.0 71.2 84.2
- 14. Unit Service Factor 100.0 70.3 83.2 15.- Unit Availability Factor 100.0 70.3' 83.2 16c Unit Capacity Factor (using MDC) 103.1 71.4 81.9
.17. Unit Capacity Factor (using DER) 100.3 69.5 79.7
- 18. Unit Forced Outage Rate 0.0 0.0 3.s W
Peps : 3 of 6 x
.~
o, OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT. January 7,1998 COMPLETED BY :
D. S. Freeman TELEPHONE:
(5C4) 739 6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE i
- 22. Hours in Reporting Period 744 s,7so 107,sas
- 23. Unit Forced Outage Hours o.o 0.0 3,21s.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A i IM -
Page: 4 of 6
-. ~.
c.
AVERAGE DAILY UNIT POWER LEVEL i
j DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 7,1998 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739-6575 Reporting Period :
December,1997
( NET MWe )
l DAY Avg. Power Level -
DAY Avg. Power Level -
1 1,109 16 1,107 r
2 1,107 17 1,107
~
3 1,107 18 1,108 i
4 1,108 19 1,108 i
5 1,109 20 1,108 6
1,109 21 1,108 7
1,108 22 1,108 8
1,109-23 1,108 9
1,108 24 1,108 10 1,108 25 1,109 i
11 1,108 26 1,108 12 1,107 27 1,108 13 1,107 28 1,108 14 1,107 29 1,108 15 1,108 30 1,107 31 1,108 INSTRUCTIONS :
On this form, list the average deily unit power level in MWe-Net for each
- day in the reporting month. Compute to the nearest whole megawatt.
1hNh J_..,-.
. a..,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 7,1998 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6675 REPORTING PERIOD :
December,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type - (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)
S.3cheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD -
License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) nm r : s.e s