=Entergy Entergy operations,Inc.
- v:a,vvcc Tel 504 739 6242 Er C. Ewing, lil Nu ar Safety & Regulatory Ararrs W3F1-97-0080 A4.05 PR i
April 15,1997 U..~i. Nuclear Regulatory Commission ATl N: Document Control Desk 1
Washington, D.C. 20555
Subject:
Waterford 3 SES Dor.ket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of March,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 739-6666 or David Litolff at (504) 739-6693.
Very truly yours, E.C. Ewing ar Safety & Regulatory Affairs I
I ECE/DFL/ssf Attachment
&:70034 E.W. Merschoff (NRC Region IV). C.P. Patel (NRC-NRR),
R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Records Center), NRC Resident inspectors Office fbbkOO
@ii fl!i FfPi ll ili!!S D
302-R PDR
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS d
WATERFORD 3 l
for March,1997 The unit operated at an averem reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
i 4
I i
a J
l J
1 4
E 4
e i
i l
4% 97 Pape I of 6
1 PRESSURIZER SAFETY VALVE t
FAILURES AND CHALLENGES WATERFORD 3 for March,1997 There were no pressurizer safety valve failures or challengen experienced during the month.
g Page. 2 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 8,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS
- 1. Reporting Period March,1997 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A j
i
- 4. Reason for Restriction (if any)
N/A i
THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 2,160.0 86,464.1
- 6. ~ Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 2,160.0 85,484.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,520,600 7,315,001 283,572,366
- 10. Gross Electrical Energy Generated (MWH) 861,170 2,497,450 94,683,730
- 11. Net Electrical Energy Generated (MWH) 826,343 2,397,087 90,329,748
- 12. Reactor Service Factor 100.0 100.0 ss.s
- 13. Reactor Availability Factor 100.0 100.0 as.s
- 14. Unit Service Factor 100.0 100.0 84.7
- 15. Unit Availability Factor 100.0 100.0 84.7 4
16.' Unit Capacity Factor (using MDC) 103.3 103.2 83.2
- 17. Unit Capacity Factor (using DER) 100.6 100.5 81.0
- 18. Unit Forced Outage Rate
_ o.0 0.0 3.6 4,w Page, 3 of 6
1 OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 8,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL - April 11,1997 - 40 days
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 2,160 100,969
- 23. Unit Forced Outage Hours 0.0 0.0 3,218.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A e
4/8/91 Page, of 6
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 8,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 Reporting Period :
March,1997
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,112 16 1,113 2
1,112 17 1,112 3
1,112 18 1,111 4
1,112 19 1,111 5
1,111 20 1,111 6
1,111 21 1,107 7
1,112 22 1,112
,1 2 10 1,109 25 1,112
~~
11 1,110 26 1,110 12 1,108 27 1,110
~~
13 1,112 28
~
1,107 14 1,111 29 1,107 15 1,112 30 1,108 31 1,109 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
4 @ 97 Page: 5 of 6
\\
^
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 j
UNIT NAME : WATERFORD 3 DATE OF REPORT : April 8,1997 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 739-6575 REPORTING PERIOD :
March,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
Reason Method Corrective Actions NONE l
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
Page 6 of 6