b, Ent y Operations,lnc.
g-l K&ra LA 70066 Tei 504 739 6774 R. F. Burski twur FA.o;ar 5 defy Wa%rfud 3 l
W3F1-96-0051 A4.05 PR 1
1 l
April 15,1996 U.S. Nuclear Regulatory Commission l
ATTN: Document Control Desk l
Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 l
Monthly Operating Report i
Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of March,1996. This report is submitted pe.r Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, 5
t-R.F. Burski Director Nuclear Safety RFB/DFL/ssf l
Attachment cc:
L.J. Callan, NRC Region IV i
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds D0020 F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center)
[
NRC Resident inspectors Office y
9604170139 960331 g
i PDR ADOCK 05000382 i
R PDR
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for March,1996 l
l The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.
l 4'196 Page : I of 6
t l
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES I
WATERFORD 3 l
for March,1996 r
There were no pressurizer safety valve failures or challenges experienced during the month, i
L l
l t
l
(
+w6 r : 2 or 6 l
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
April 5,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 OPERATING STATUS
- 1. Reporting Period March,1996 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe).
1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 2,184.0 7s,216.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 2,184.0 77,270.2
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,516,925 7,391,948 256,088,389
- 10. Gross Electrical Energy Generated (MWH) 855,350 2,500,570 8s,358,940
- 11. Net Electrical Energy Generated (MWH) 820,s29 2,39s,663 81,404,47s
- 12. Reactor Service Factor 100.0 100.0 84.s
- 13. Reactor Availability Factor 100.0 100.0 84.s
- 14. Unit Service Factor 100.0 100.0 83.s
- 15. Unit Availability Factor 100.0 100.0 83.s
- 16. Unit Capacity Factor (using MDC) 102.6 102.2 82.1
- 17. Unit Capacity Factor (using DER) 99.9 99.5 80.0
- 18. Unit Forced Outage Rate 0.0 0.0 3.3 N3/96 Page ; 3 of 6
c-OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 l
DATE OF REPORT : April 5,1996 j
COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each):
NONE l
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
j THIS YEAR TO MONTH DATE CUMULATIVE l
- 22. Hours in Reporting Period 744 2,184 92,209
- 23. Unit Forced Outage Hours 0.0 0.0 2,673.2
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A l
I i
l i
gg Page : 4 of 6
AVERAGE DAILY UNIT POWER LEVEL 4
DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 5,1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504)464-3352 Reporting Period :
March,1996
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,106 16 1,105 2
1,069 17 1,106 3
1,074 18 1,106 4
1,104 19 1,105 5
1,105 20 1,105 6
1,106 21 1,105 7
1,106 22 1,106 8
1,106 23 1,106 9
1,105 24 1,105 10 1,106 25 1,105 11 1,106 26 1,105 12 1,107 27 1,105 13 1,107 28 1,105 14 1,106 29 1,105 15 1,104 30 1,106 31 1,106 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
4 n
S$96 Page: $ of 6
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : April 5,1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504)464-3352 REPORTING PERIOD :
March,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hour ;
Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Pariod 5 - Power Reduction 6 - Other (explain) og Page : 6 of 6
,