ML20094L026

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1995 for Waterford 3
ML20094L026
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0182, W3F1-95-182, NUDOCS 9511200010
Download: ML20094L026 (7)


Text

-- - - - - - - - - - -

e

= ENTERGY Ya'e*""'"'" '""

KWona.LA 70066 Tei 504 739 6774 A

R. F. Burski Onecor ro A u Sa'ety V2llerfud 3 W3F1-95-0182 A4.05 PR November 14, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 3ubject: Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report .

I Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of October, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility j Operating License No. NPF-38.

t Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office P G O * 0A 9511200010 951031 PDR R. .

ADDCK 05000382

- _ _ PDR

[/ '

l

. NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for October, 1995 The unit was in Refueling Outage #7 for the entire month, thus generating no power for the time-period.

l l

l l

l inu ew.:i r.

~

l l

i

, PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 .

for October, 1995 There were no pressurizer safety valve failures or challenges experienced during the month, i

J 4

p h

(

inn r. 2 or .

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 3, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 OPERATING STATUS

1. Reporting Period  : October, 1995 Gross Hours in Reporting Period  : 745
2. Currently Authorized Power Level (MWt) : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe) : 1,104
3. Power Level to which Restricted (if any) (Net MWe) : N/A
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 0.0 5,912.7 74.635.5
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 0.0 5.892.8 73,737.1
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 0 19,919,377 244,248,986
10. Gross Electrical Energy Generated (MWH) 0 6,630,410 81,364,870
11. Net Electrical Energy Generated (MWH) 0 6,336,926 77,579.292
12. Reactor Service Factor 0.0 81.0 84.3
13. Reactor Availability Factor 0.0 81.0 84.3
14. Unit Service Factor 0.0 80.8 83.3
15. Unit Availability Factor 0.0 80.8 83.3
16. Unit Capacity Factor (using MDC) 0.0 80.8 81.5
17. Unit Capacity Factor (using DER) 0.0 78.7 79.3
18. Unit Forced Outage Rate 0.0 7.3 3.5 W3M Page ' 3 of 6

1 .

( ..

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 3, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup: 11/6/95
21. Unit is in Commercial Operation.

THIS YEAR T0 f MONTH DATE CUMULATIVE

22. Hours in Reporting Period 745 7,296 88,561
23. Unit Forced Outage Hours 0.0 463.0 2,673.2
24. Nameplate Rating (Gross MWe) : 1.200 Max. Dependable Capacity (Gross MWe) : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A _

1 I

IV19% Page 4 of 6

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 3, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 Reporting Period : October, 1995 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level l

1 (14) 16 (10) 2 (14) 17 (6) 3 (14) 18 (6) 4 (14) 19 (5) 5 (14) 20 (3) 6 (14) 21 (8) 7 (14) 22 (9) 8 (10) 23 (9) 9 (7) 24 (6) 10 (5) 25 (5) 11 (5) 26 (9) 12 (8) 27 (12) 13 (10) 28 (10) l 14 (10) 29 (8) 15 (10) 30 (9) 31 (21) l INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

nw r : 5 a.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : November 3, 1995 COMPLETED BY : D. S. Freeman -

TELEPHONE : (504) 464-3352 REPORTING PERIOD : October, 1995 Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions 95-02 950922 S 745.00 C 4 Unit removed from service to begin Refuel Outage 7.

Outage is continued from the previous period.

TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction

      • E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) i 3 - Automatic Scram H - 0ther (explain) l 4 - Continuation from Previous Period 5 - Power Reduction i 6 - Other (explain) I I

I L'19% Page 6 of 6