ML20097G077
| ML20097G077 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/31/1996 |
| From: | Burski R, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3FI-96-0022, W3FI-96-22, NUDOCS 9602210031 | |
| Download: ML20097G077 (7) | |
Text
.-
f n
Entergy Operations,Inc.
Kilkm LA 70066 Tel 504 739 6774 R. F. Burski Dnatte.
4.rloa Mety Witerford 3 W3F1-96-0022 A4.05 PR February 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of January,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, W. IL0a -
r A
R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
JHheelock (INPO Records Center) 210046 NRC Resident inspectors Office h' I {
9602210031 960131 PDR ADOCK 05000382 1
R PDR l
1
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for January,1996 4
6 The unit operated at an average reactor power level of 99.8% and experienced no j
shutdowns or significant power reductions during the period.
1 l
i s
t 1
Page. I of 6
O PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 l
for January,1996 4
i 4
There were no pressurizer safety valve failures or challenges experienced during the month.
i l
l l
i 19 %
Page, 2 of 6
OPERATING DATA REPORT l
DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
February 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 OPERATING STATUS
- 1. Reporting Period January,1996 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) 1,07s Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 744.0 7s,77s.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 744.0 7s.s30.2
- 8. Unit Reserve Shutdown Hours o.o 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,s17,oss 2,s17,08s 251,213,527
- 10. Gross Electrical Energy Generated (MWH) 847,950 847,950 83,70s,320
- 11. Net Electrical Energy Generated (MWH) 813,321 813,321 79,819,13s
- 12. Reactor Service Factor 100.0 100.0 84.s
- 13. Reactor Availability Factor 100.0 100.0 84.s
- 14. Unit Service Factor 100.0 100.0 83.s
- 15. Unit Availability Factor 100.0 100.0 83.s
- 16. Unit Capacity Factor (using MDC) 101.7 101.7 81.8
- 17. Unit Capacity Factor (using DER) 99.0 99.0 79.7
- 18. Unit Forced Outage Rate o.0 0.0 3.4 1%9e Page: 3 of 6
i OPERATING DATA REPORT l
DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
February 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 l
OPERATING STATUS (Cont.)
l
- 19. Shutdowns Scheduled over next C inonths (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 744 90,769
- 23. Unit Forced Outage Hours 0.0 0.0 2,s73.2
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A I
I Page : 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
February 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 Reporting Period :
January,1996
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,095 16 1,096 2
1,094 17 1,096 3
1,095 18 1,096 4
1,096 19 1,095 5
1,095 20 1,096 6
1,095 21 1,096 7
1,094 22 1,096 8
1,095 23 1,096 9
1,096 24 1,096 10 1,095 25 1,097 11 1,096 26 1,097 12 1,097 27 1,097 13 1,097 28 1,097 14 1,097 29 1,097 15 1,097 30 1,097 31 1,009 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
15 %
Page : $ of 6
.o.
UNIT SHUTDOWNS AND POWER REDUCTIONS
't DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
February 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)464-3352 REPORTING PERIOD :
January,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE i
i I
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) i 14 %
Page : 6 of 6