f n

Entergy Operations,Inc.

Kilkm LA 70066 Tel 504 739 6774 R. F. Burski Dnatte.

4.rloa Mety Witerford 3 W3F1-96-0022 A4.05 PR February 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of January,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, W. IL0a -

r A

R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:

L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

JHheelock (INPO Records Center) 210046 NRC Resident inspectors Office h' I {

9602210031 960131 PDR ADOCK 05000382 1

R PDR l

1

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for January,1996 4

6 The unit operated at an average reactor power level of 99.8% and experienced no j

shutdowns or significant power reductions during the period.

1 l

i s

t 1

Page. I of 6

O PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 l

for January,1996 4

i 4

There were no pressurizer safety valve failures or challenges experienced during the month.

i l

l l

i 19 %

Page, 2 of 6

OPERATING DATA REPORT l

DOCKET NUMBER :

50-382 UNIT NAME :

WATERFORD 3 DATE OF REPORT :

February 9,1996 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 464-3352 OPERATING STATUS

1. Reporting Period January,1996 Gross Hours in Reporting Period 744
2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) 1,07s Design Electrical Rating (Net MWe) 1,104
3. Power Level to which Restricted (if any)(Net MWe)

N/A

4. Reason for Restriction (if any)

N/A THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 744.0 744.0 7s,77s.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 744.0 744.0 7s.s30.2
8. Unit Reserve Shutdown Hours o.o 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,s17,oss 2,s17,08s 251,213,527
10. Gross Electrical Energy Generated (MWH) 847,950 847,950 83,70s,320
11. Net Electrical Energy Generated (MWH) 813,321 813,321 79,819,13s
12. Reactor Service Factor 100.0 100.0 84.s
13. Reactor Availability Factor 100.0 100.0 84.s
14. Unit Service Factor 100.0 100.0 83.s
15. Unit Availability Factor 100.0 100.0 83.s
16. Unit Capacity Factor (using MDC) 101.7 101.7 81.8
17. Unit Capacity Factor (using DER) 99.0 99.0 79.7
18. Unit Forced Outage Rate o.0 0.0 3.4 1%9e Page: 3 of 6

i OPERATING DATA REPORT l

DOCKET NUMBER :

50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :

February 9,1996 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 464-3352 l

OPERATING STATUS (Cont.)

l

19. Shutdowns Scheduled over next C inonths (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup:

N/A

21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 744 90,769
23. Unit Forced Outage Hours 0.0 0.0 2,s73.2
24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :

N/A I

I Page : 4 of 6

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :

50-382 UNIT NAME :

WATERFORD 3 DATE OF REPORT :

February 9,1996 COMPLETED BY :

D. S. Freeman TELEPHONE :

(504) 464-3352 Reporting Period :

January,1996

( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1

1,095 16 1,096 2

1,094 17 1,096 3

1,095 18 1,096 4

1,096 19 1,095 5

1,095 20 1,096 6

1,095 21 1,096 7

1,094 22 1,096 8

1,095 23 1,096 9

1,096 24 1,096 10 1,095 25 1,097 11 1,096 26 1,097 12 1,097 27 1,097 13 1,097 28 1,097 14 1,097 29 1,097 15 1,097 30 1,097 31 1,009 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

15 %

Page : $ of 6

.o.

UNIT SHUTDOWNS AND POWER REDUCTIONS

't DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :

February 9,1996 COMPLETED BY :

D. S. Freeman TELEPHONE: (504)464-3352 REPORTING PERIOD :

January,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE i

i I

TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) i 14 %