Text
,, _ - -
4 Ent:rgy Oper; tion:,in).
Ktik.nla. L A 70066
- f*,
Tel 504 739 6774 i
R. F. Burski
- bracht, Nrkur Sa'et/
Weiurd 3 W3F1-95-0170 A4.05 PR
-October 11, 1995 U.S. Nuclear Regulatory Commiss' ion ATTN: Document Control Desk' Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of September, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, ww L' R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment i
cc:
L.J. Callan, NRC Region IV i
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds J
F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INP0 Records Center)
NRC Resident Inspectors Office 1.000."3 1
r
/
M i
9510130154 950930 PDR ADOCK 05000382
/l I
_ _PDR
._ R _
w
e NRC MONTHLY OPERATING REPORT
. f.
SUMMARY
OF OPERATIONS WATERFORD 3 for September, 1995 The unit operated at an average reactor power level of 72.7% for the month, having shut down on September 22nd to commence Refuel Outage #7.
4
)
4 1W495 Page: 1 of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for September, 1995 There were no pressurizer safety valve failures or challenges experienced during the month.
d h
i 14491-Page: 2 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
October 4, 1995 COMPLETED BY :
D. S. Freeman
{
TELEPHONE :
(504) 464-3352 OPERATING STATUS
- 1. Reporting Period September, 1995 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) :
3,390 Maximum Dependable Capacity (Net MWe) :
1,075.
Design Electrical Rating (Net MWe) :
1,104 3.
Power Level to which Restricted (if any) (Net MWe) :
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 524.8 5,912.7 74,635.5
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 524.8 5,892.8 73,737.1
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 1,774,478 19,919,377 244,248,986
- 10. Gross Electrical Energy Generated (MWH) 586,690 6,630,410 81,364,870
- 11. Net Electrical Energy Generated (MWH) 557.193 6,336,926 77,579.292
- 12. Reactor Service Factor 72.9 90.3 85.0
- 13. Reactor Availability Factor 72.9 90.3 85.0
- 14. Unit Service Factor 72.9 90.0 84.0
- 15. Unit Availability Factor 72.9 90.0 84.0
- 16. Unit Capacity Factor (using MDC) 72.0 90.0 82.2
- 17. Unit Capacity Factor (using DER) 70.1 87.6 80.0
- 18. Unit Forced Outage Rate 0.0 7.3 3.5 Page: 3 of 6
1 OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
October 4, 1995 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 DDERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
11/6/95
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 720 6,551 87.816
- 23. Unit Forced Outage Hours 0.0 463.0 2.673.2
- 24. Nameplate Rating (Gross MWe) :
1.200 Max. Dependable Capacity (Gross MWe) :
1.120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A M e$
Page: 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
October 4, 1995 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 Reporting Period :
September, 1995
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,062 16 1,073 2
1,063 17 1,073 3
1,064 18 1,068 4
1,064 19 1,074 5
1,064 20 1,074 6
1,065 21 1,074 7
1,066 22 894 j
8 1,068 23 (33) j 9
1,069 24 (20) 10 1,070 25 (12) j 11 1,070 26 (11) 12 1,070 27 (11) 13 1,071 28 (12) i 14 1,071 29 (12) 15 1,072 30 (14)
INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i WM1 Page : $ of 6 I
.. ;. y.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
October 4, 1995 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 REPORTING PERIOD :
September, 1995 Date
- Duration
- Shutdown Cause, Comments and Number (yymmdd)
Type (Hours)
Reasun Method Corrective Actions 95-02 950922 S
195.20 C
1 Unit removed from service to begin Refuel Outage 7.
IYEE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and
![EJBOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 14495 Page: 6 of 6
- -