Monthly Operating Rept for Sept 1995 for Waterford 3
ML20093D173
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/30/1995
From: Burski R, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0170, W3F1-95-170, NUDOCS 9510130154
Download: ML20093D173 (7)


Text

, , _ - -

4 Ent:rgy Oper; tion:,in).

Ktik.nla. L A 70066

  • f*,

, , . . Tel 504 739 6774 i

R. F. Burski bracht, Nrkur Sa'et/

Weiurd 3 W3F1-95-0170 A4.05 PR

-October 11, 1995 U.S. Nuclear Regulatory Commiss' ion ATTN: Document Control Desk' Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of September, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours,

. ww L' R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment i

cc: L.J. Callan, NRC Region IV i C.P. Patel, NRC-NRR l R.B. McGehee N.S. Reynolds l J

F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office 1.000."3 1 r

/ Mi 9510130154 950930 PDR ADOCK 05000382 /l '

I

._ R _ _ _PDR

e

. f. . NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for September, 1995 The unit operated at an average reactor power level of 72.7% for the month, having shut down on September 22nd to commence Refuel Outage #7.

4

)

4 1W495 Page: 1 of 6

'. PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for September, 1995 There were no pressurizer safety valve failures or challenges experienced during the month.

d h

i 14491- Page: 2 of 6

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 4, 1995 l COMPLETED BY : D. S. Freeman {

I TELEPHONE : (504) 464-3352 OPERATING STATUS

1. Reporting Period  : September, 1995 Gross Hours in Reporting Period  : 720
2. Currently Authorized Power Level (MWt) : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075.

Design Electrical Rating (Net MWe) : 1,104

3. Power Level to which Restricted (if any) (Net MWe) : N/A
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 524.8 5,912.7 74,635.5
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 524.8 5,892.8 73,737.1
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0

, 9. Gross Thermal Energy Generated (MWH) 1,774,478 19,919,377 244,248,986

10. Gross Electrical Energy Generated (MWH) 586,690 6,630,410 81,364,870
11. Net Electrical Energy Generated (MWH) 557.193 6,336,926 77,579.292
12. Reactor Service Factor 72.9 90.3 85.0
13. Reactor Availability Factor 72.9 90.3 85.0
14. Unit Service Factor 72.9 90.0 84.0
15. Unit Availability Factor 72.9 90.0 84.0
16. Unit Capacity Factor (using MDC) 72.0 90.0 82.2
17. Unit Capacity Factor (using DER) 70.1 87.6 80.0
18. Unit Forced Outage Rate 0.0 7.3 3.5 Page: 3 of 6

1

. ., OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 4, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 DDERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup: 11/6/95
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 720 6,551 87.816
23. Unit Forced Outage Hours 0.0 463.0 2.673.2
24. Nameplate Rating (Gross MWe) : 1.200 Max. Dependable Capacity (Gross MWe) : 1.120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A l

l M e$ Page: 4 of 6

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 4, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 Reporting Period : September, 1995 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,062 16 1,073 2 1,063 17 1,073 3 1,064 18 1,068 4 1,064 19 1,074 5 1,064 20 1,074 6 1,065 21 1,074 7 1,066 22 894 j 8 1,068 23 (33) ,

l j 9 1,069 24 (20) 10 1,070 25 (12) j 11 1,070 26 (11)

I 12 1,070 27 (11)

! 13 1,071 28 (12) i 14 1,071 29 (12) 15 1,072 30 (14)

! INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i WM1 Page : $ of 6 I

. ...;. y . UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 4, 1995 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 REPORTING PERIOD : September, 1995 Date

  • Duration ** Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reasun Method Corrective Actions 95-02 950922 S 195.20 C 1 Unit removed from service to begin Refuel Outage 7.

IYEE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction

      • E - Operator Training and

![EJBOD License Examination 1 - Manual F - Administrative ,

2 - Manual Scram G - Operational Error (explain)  !

3 - Automatic Scram H - Other (explain) I 4 - Continuation from Previous Period i 5 - Power Reduction 6 - Other (explain) l 14495 Page: 6 of 6

_ ._. . _ _ - . _ _ _ _ . _ _ _ . . _ . . _ _ _ - - _ _