r;.

Ent0 y perations, inc.

Kiltona. LA 70066

(

Tel 504 739 0242 Er C. Ewing, lit g a seger s nevour u as r

W3F1-99-0130 A4.05 PR August 10,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of July,1999. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

There are no commitments contained in this letter. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.

Very truly yours, go h f [L%. :9  ;

E.C. Ewing 4

Director, l Nuclear Safety & Regulatory Affairs

]

i ECE/TMM/rtk l Attachment i I

t

.}

p3082 7 2 i I R

. i

Monthly Operating Report W3F1-99-0130 I'

Page 2

' August 10,1999 cc: E.W. Merschoff (NRC Region IV),

C.P. Patel (NRC-NRR),

J. Smith,

' N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

P. Lewis (INPO Records Center),

NRC Resident inspectors Office o

. s l

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for July,1999 I i

i The unit operated at an average reactor power level of 99.9% and experienced no shutdowns l or significant power reductions during the period.

l 64m9 Page t of 6 L

l PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES 1 l

WATERFORD 3 for July,1999 There were no pressurizer safety valve failures or challenges experienced during the month.

i age Page 2 of 6

, . s .-

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504)739-6426 OPERATING STATUS

1. Reporting Period  : July,1999 Gross Hours in Reporting Penod  : 744
2. Currently Authorized Power Level (MWt)  : 3,390 Maximum Dependable Capacity (Net MWe) . 1,075 Design Electrical Rating (Net MWe)  : 1,104
3. Power Level to which Restricted (if any) (Net MWe)  : N/A
4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE l
5. Number of Hours Reactor was Critical 744.0 4,067.5 102,657.0
6. Reactor Reserve Shutdown Hours o.o 0.0 0.o
7. Hours Generator was On-line 744.0 4,02s.9 101,480.4
8. Unit Reserve Shutdown Hours o.o o.o o.o
9. Gross Thermal Energy Generated (MWH) 2,521,175 13,240,098 336,863,196
10. Gross Electrical Energy Generated (MWH) 855,904 4,493,831 112,733,896
11. Net Electrical Energy Generated (MWH) 818,890 4,305,237 107,579,357
12. Reactor Service Factor 100.o 80.0 84.5
13. Reactor Availability Factor 100.0 so.o s4.5
14. Unit Service Factor 100.o 79.2 83.6
15. Unit Availability Factor 100.0 79.2 83.s
16. Unit Capacity Factor (using MDC) 102.4 78.7 82.4
17. Unit Capacity Factor (using DER) 99.7 7s.7 80.3
18. Unit Forced Outage Rate o.0 1.3 3.s BMN9 Page : 3 of 6

l

. . . .- l OPERATING DATA REPORT I l

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 I DATE OF REPORT : August 9,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504) 739-6426 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE l

1

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 s,087 121,41s
23. Unit Forced Outage Hours o.o 53.0 4,ois.s I
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe) . 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A i

Page 4 of 6

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE : (504)739-6426 Reporting Period : July,1999 ( NET MWe )

J DAY Avg. Power Level DAY Avg. Power Level i

1 1,105 16 1,138 2 1,100 17 1,101  ;

3 1,106 18 1,101  !

4 1,106 19 1,101 5 1,105 20 1,101 6 1,105 21 1,100 l 7 1,105 22 1,099 8 1,104 23 1,099 9 1,103 24 1,099  ;

10 1,103 25 1,098 11 1,102 26 1,098 12 1,103 27 1,097 13 1,102 28 1,096 14 1,126 29 1,095 15 1,101 30 1,094 31 1,093 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Reflects On-Line Net Generation.

8.9 99 Page S of 6

s .

UNIT SHUTDOWNS AND POWER REDUCTIONS i l

I DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504)739-6426 REPORTING PERIOD : July,1999 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions  ;

NA i

l i

e se TYPE , REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) w= c.,. . or .

L