ML20210S058
| ML20210S058 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/31/1999 |
| From: | Ewing E, Meyers B ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-99-0130, NUDOCS 9908170292 | |
| Download: ML20210S058 (8) | |
Text
r;.
Ent0 y perations, inc.
Kiltona. LA 70066
(
Tel 504 739 0242 Er C. Ewing, lit r
s nevou u as g a seger r
W3F1-99-0130 A4.05 PR August 10,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of July,1999. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments contained in this letter. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-6882.
Very truly yours, h
f
[L%. :9 go E.C. Ewing 4
- Director, Nuclear Safety & Regulatory Affairs
]
i ECE/TMM/rtk l
Attachment i
t
.}
2 i I
- p3082 7 R
i
Monthly Operating Report W3F1-99-0130 I'
Page 2
' August 10,1999 cc:
E.W. Merschoff (NRC Region IV),
C.P. Patel (NRC-NRR),
J. Smith,
' N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
P. Lewis (INPO Records Center),
NRC Resident inspectors Office o
s NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for July,1999 i
i The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
64m9 Page t of 6 L
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for July,1999 There were no pressurizer safety valve failures or challenges experienced during the month.
age Page 2 of 6
s.-
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504)739-6426 OPERATING STATUS
- 1. Reporting Period July,1999 Gross Hours in Reporting Penod 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe).
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 4,067.5 102,657.0
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.o
- 7. Hours Generator was On-line 744.0 4,02s.9 101,480.4
- 8. Unit Reserve Shutdown Hours o.o o.o o.o
- 9. Gross Thermal Energy Generated (MWH) 2,521,175 13,240,098 336,863,196
- 10. Gross Electrical Energy Generated (MWH) 855,904 4,493,831 112,733,896
- 11. Net Electrical Energy Generated (MWH) 818,890 4,305,237 107,579,357
- 12. Reactor Service Factor 100.o 80.0 84.5
- 13. Reactor Availability Factor 100.0 so.o s4.5
- 14. Unit Service Factor 100.o 79.2 83.6
- 15. Unit Availability Factor 100.0 79.2 83.s
- 16. Unit Capacity Factor (using MDC) 102.4 78.7 82.4
- 17. Unit Capacity Factor (using DER) 99.7 7s.7 80.3
- 18. Unit Forced Outage Rate o.0 1.3 3.s BMN9 Page : 3 of 6
l OPERATING DATA REPORT l
DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY :
Bruce E. Meyers TELEPHONE:
(504) 739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE 1
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 s,087 121,41s
- 23. Unit Forced Outage Hours o.o 53.0 4,ois.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A i
Page 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY :
Bruce E. Meyers TELEPHONE : (504)739-6426 Reporting Period :
July,1999
( NET MWe )
J DAY Avg. Power Level DAY Avg. Power Level i
1 1,105 16 1,138 2
1,100 17 1,101 3
1,106 18 1,101 4
1,106 19 1,101 5
1,105 20 1,101 6
1,105 21 1,100 7
1,105 22 1,099 8
1,104 23 1,099 9
1,103 24 1,099 10 1,103 25 1,098 11 1,102 26 1,098 12 1,103 27 1,097 13 1,102 28 1,096 14 1,126 29 1,095 15 1,101 30 1,094 31 1,093 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
8.9 99 Page S of 6
s.
UNIT SHUTDOWNS AND POWER REDUCTIONS i
I DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 9,1999 COMPLETED BY :
Bruce E. Meyers TELEPHONE: (504)739-6426 REPORTING PERIOD :
July,1999 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NA i
l i
e se TYPE
, REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) w=
c.,.. or.
L