Entergy Operations. Inc.
Op Killona. LA 70066 Tel 504 739 6774 R. F. Burski Dmxa tJrker Safety Waterford 3 W3F1-95-0130 A4.05 PR August 15, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of July,1995.
This repcrt is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:
L.J. Callan (NRC Region IV)
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Inscitute, Inc.)
J.T. Wheelock (INP0 Records Center)
NRC Resident Inspectors Office 9508170321 950731 i
DR ADOCK 050003B2 Ik PDR
y' !
f I
i NRC MONTHLY OPERATING REPORT u
SUMMARY
0F OPERATIONS WATERFORD 3 for July,1995 The unit operated at an average reactor power level of 99.95% and experienced no shutdowns or significant power reductions during the period.
I t
l t
4 I
1 i
7 E
4 9
i aggs Paye : 1 e' d f
~
e.
i 1
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for July,1995 i
'There were no pressurizer safety valve failures or challenges experienced during the month.
asw hr.: 2 or s
)
c.
~ OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
August 8, 1995
. COMPLETED BY :
D. S. Freeman.
' TELEPHONE :
(504).464-3352 OPERATING STATUS
- 1. Reporting Period July, IJ95 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (HWt) :
3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) :
1,104 3.
Power Level to which Restricted (if any) (Net MWe) :
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE.
- 5. Number of Hours Reactor was Critical 744.0 4.643.9 73,366.7'
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 4.624.0 72.468.3
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,521.005 15,623.650 239. % 3,259
- 10. Gross Electrical Energy Generated (MWH) 836,370 5.213.320 73.947,780
-11. Net Electrical energy Generated (MWH) 799,010 4,987.306 76.229,672
- 12. Reactor Service Factor 100.0 91.3 85.0
- 13. Reactor Availability Factor 100.0' 91.3 85.0
~
- 14. Unit Service Factor 100.0 90.9 83.9
~
- 15. Unit Availability Factor 100.0 90.9 83.9-
~
- 16. Unit Capacity factor (using MDC) 99.9 91.2 82.1
- 17. Unit Capacity Factor (Using DER)
'97.3 88.8 79.9
- 18. Unit Forced Outage Rate 0.0.
9.1 3.6 sus Page: 3 of 4
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
August 9, 1995 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
September 22, 1995 REFUEL 60 Days
- 20. If Shutdown at end of report period, estimated date of startup:
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 5.087 86,352
- 23. Unit Forced Outage Hours 0.0 463.0 2.673.2
- 24. Nameplate Rating (Gross MWe) :
1.200 Max. Dependable Capacity (Gross MWe) :
1.120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A
,i -
nW Pape : 4 of 6
f'
- .4
. AVERAGE-DAILY.. UNIT POWER LEVEL ~
i DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
August 8, 1995-j COMPLETED.BY :
D. S. Freeman TELEPHONE : '(504) 464-3352 i
'l Reporting Period :
July, 1995
( NET MWe )~
DAY Avg. Power Level DAY Avg. Power Level i
1 1,076 16 1,076
')
2 1,075 17 1,075 3
1,075 18 1,075 i
i 4
1,078 19 1,073 j
5 1,077 20 1,073 6
1,080 21 1,071 7
1,078 22 1,070
.l 8
1,078 23 1,071 9
1,078 24 1,070 10 1,078 25 1,068 11 1,077 26 1,069 12 1,078 27 1,069 13 1,076 28 1,068 l
14 1,078 29 1,068 15 1,077 30 1,069 31 1,070 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I t
t atst Page: $ of 6
5
]
l'
'('
UNIT SHUTDOWNS AND POWER REDUCTIONS j
DOCKET NUMBER :
50-382 I
UNIT NAME :
WATERFORD 3 DATE OF REPORT :
August 8, 1995 l
COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 t
REPORTING PERIOD :
July, 1995 I
Date
- Duration
- Shutdown Cause, Comments and i
Number (yymmdd)
Type (Hours)
Reason Method Corrective Actior,e NONE i
?
i TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B -Maintenance or Test r
C - Refueling
[
D - Regulatory Restriction E - Operator. Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other ' (exp1ain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
.m e :..<.