ML20203F970
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/30/1997
From: Ewing E, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-97-0272, W3F1-97-272, NUDOCS 9712170497
Download: ML20203F970 (7)


Text

- - - - -- _- _ - _ _ _ -- - - - - - - - - - .-

- (

.*)Entergy W"~* l

==  :

Early C. twing, til a $ tety & twpatyy Maas W3F197-0272 l A4.05  :

i PR December 15,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 i

Subject:

Waterford 3 SES Docket No. 50 382 License No. NPF 38 Monthly Operating Report Gentlemen:

1 Attached is the subject monthly report which covers the operating statistics for the ,

month of Ncsember,L1W97/ This report is submitted per Section 6.9.1.0 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Should you have any questions regarding the above, please contact me at (504) 73fA242 or Tim Gaudet at (504) 739-6666. -

Very truly yours, E.C. Ewing

/f d Yl e i Director Nuclear Safety & Regulatory Affairs ECE/ PRS /ssf Attachment ec: E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

J.' Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

J.T. Wheelock (INPO Records Center), NRC Resident inspectors OWice a > p :. , ,, .

g2 llllllg

0 d

. NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for November,1997 The unit operateo at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.

I IRgl4 l (d 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES ,

WATERFORD 3 for November,1997 There were no pressurizer safety valve failures or challenges experienced during the month.

l -

m, ,. ,,.

. i OPERATING DATA REPORT t

DOCKET NUMBER : 50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 3,1997 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739 6575 OPERATING STATUS

1. Reporting Period  : November,1997 Gross Hours in Reporting Period  : 720
2. Currently Authorized Power Level (MWt)  : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe)  : 1,104
3. Power Level to which Restricted (if any) (Net MWe)  :

N/A

4. Reason for Restilction (if any)  : N/A THIS YEAR TO MONTH _

DATE CUMULATIVE

5. Number of Hours Reactor was Critical 720.0 s,494.6 89,798.7
6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
7. Hours Generator was On line 720.0 s,417.4 88,741.7
8. Uni
  • 9eserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,433,511 18,203,288 294,460,653
10. Gross Electrical Energy Generated (MWH) s2s,050 6,175,450 98,361,730
11. Net Electrical Energy Generated (MWH) 795,011 s,896,431 93,829,092 12, Reactor Service Factor 100.0 ss.s s4.1
13. Reactor Availability Fat, tor 100.0 68.5 84.1
14. Unit Service Factor 100.0 67.6 83.1
15. Unit Availability Factor 100.0 67.s 83.1
16. Unit Capacity Factor (using MDC) 102.7 68.4 81.7
17. Unit Capacity Factor (using DER) 100.0 66.6 79.6
18. Unit Forced Outage Rate 0.0 0.0 3.s l

um e,. a .

, _ . _ , , . . -_.__.m , , , . _ . . .

, OPERATING DATA REPORT DOCKET NUMBER : 50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 3,1997 COMPLETED BY : D. S. Freeman l TELEPHONE: (504) 739-6575 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 720 s,ois 10s.s2s
23. Unit Forced Outage Hours o.o o.o 3,21s.s
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A tt191 Page - 4 as 6

o ', ,

3 AVERAGE DAILY UNIT POWER LEVEL

, 4 DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 ~

DATE OF REPORT : December 3,1997 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 739 4 575 1

Reporting Period : November,1997 _

( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,000 16 1,108 2 1,106 17 1,108 3 1,107 18 1,109 4 1,107 19 1,108 5 1,107 20 1,108 6 1,107 21 1,108 7 1,107 22 1,107 8 1,108 23 1,108 9 1,108 24 1,108 10 1,108 25 1,108 11 1,108 26 1,107 12 1,108 27 1,108 ,

13 1,109 28 1,108 14 1,108 29 1,108 15 1,109 30 1,108 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.-

am i ,,.

, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 3,1997 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 REPORTING PERIOD : November,1997 Date

  • Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE' 1

TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

. uw . or .

. _ _ . _ _ _