Text
- - - -
.*)Entergy
(
W"~*
l
==
Early C. twing, til a $ tety & twpatyy Maas W3F197-0272 l
A4.05 PR i
December 15,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 i
Subject:
Waterford 3 SES Docket No. 50 382 License No. NPF 38 Monthly Operating Report Gentlemen:
1 Attached is the subject monthly report which covers the operating statistics for the month of Ncsember,L1W97/ This report is submitted per Section 6.9.1.0 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 73fA242 or Tim Gaudet at (504) 739-6666.
Very truly yours,
/f Yl e d
i E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/ PRS /ssf Attachment ec:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J.' Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Records Center), NRC Resident inspectors OWice a > p :.,,,
g2 llllllg
0 d
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for November,1997 The unit operateo at an average reactor power level of 99.7% and experienced no shutdowns or significant power reductions during the period.
I IRgl4 l (d 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for November,1997 There were no pressurizer safety valve failures or challenges experienced during the month.
l m,
i OPERATING DATA REPORT t
DOCKET NUMBER :
50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 3,1997 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739 6575 OPERATING STATUS
- 1. Reporting Period November,1997 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restilction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 720.0 s,494.6 89,798.7
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
- 7. Hours Generator was On line 720.0 s,417.4 88,741.7
- 8. Uni
- 9eserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,433,511 18,203,288 294,460,653
- 10. Gross Electrical Energy Generated (MWH) s2s,050 6,175,450 98,361,730
- 11. Net Electrical Energy Generated (MWH) 795,011 s,896,431 93,829,092 12, Reactor Service Factor 100.0 ss.s s4.1
- 13. Reactor Availability Fat, tor 100.0 68.5 84.1
- 14. Unit Service Factor 100.0 67.6 83.1
- 15. Unit Availability Factor 100.0 67.s 83.1
- 16. Unit Capacity Factor (using MDC) 102.7 68.4 81.7
- 17. Unit Capacity Factor (using DER) 100.0 66.6 79.6
- 18. Unit Forced Outage Rate 0.0 0.0 3.s l
um e,. a.
-_.__.m
OPERATING DATA REPORT DOCKET NUMBER :
50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
December 3,1997 COMPLETED BY :
D. S. Freeman l
TELEPHONE:
(504) 739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 720 s,ois 10s.s2s
- 23. Unit Forced Outage Hours o.o o.o 3,21s.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A tt191 Page - 4 as 6
o ',
AVERAGE DAILY UNIT POWER LEVEL 3
4 DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 ~
DATE OF REPORT : December 3,1997 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739 4 575 1
Reporting Period :
November,1997
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,000 16 1,108 2
1,106 17 1,108 3
1,107 18 1,109 4
1,107 19 1,108 5
1,107 20 1,108 6
1,107 21 1,108 7
1,107 22 1,107 8
1,108 23 1,108 9
1,108 24 1,108 10 1,108 25 1,108 11 1,108 26 1,107 12 1,108 27 1,108 13 1,109 28 1,108 14 1,108 29 1,108 15 1,109 30 1,108 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.-
am i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50 382 UNIT NAME : WATERFORD 3 DATE OF REPORT : December 3,1997 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6575 REPORTING PERIOD :
November,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE' 1
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
. uw
. or.
_...