Monthly Operating Rept for June 1996 for Waterford 3
ML20115F042
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/30/1996
From: James Fisicaro, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0109, W3F1-96-109, NUDOCS 9607170034
Download: ML20115F042 (7)


Text

k

. A s

@ Ent:rgy Operitions. Inc.

PO. Box B j i

4 Kiliona. LA 70066  ;

Tel 504 739 6242 )

mes J. Fisicaro V[a e or W3F1-96-0109 A4.05 PR July 15,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen: l l

Attached is the subject monthly report which covers the operating statistics for the month of June,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, )

l n

J.J. Fisic o

.P" l Director Nuclear Safety JJF/DFUssf Attachment I cc: L.J. Callan, NRC Region IV '

C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds l F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center)

NRC Resident inspectors Office 9607170034 960630 PDR R

ADOCK 05000382 Ill PDR i

i

. NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 3

for June,1996 i

The unit operated at an average reactor power level of 99.97% and experienced no shutdowns or significant power reductions during the period, i 1 l

I I

i d

4

)

l l

)

a i

l 7/s% Page : I of 6

\

. . PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for June,1996 There were no pressurizer safety valve failures or challenges experienced during the month.

I l

i 1

7/t% Page . 2 of 6

~

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : July 2,1996 ,

COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352

OPERATING STATUS i 1. Reporting Period
June,1996 i
' Gross Hours in Reporting Period . 720
2. Currently Authorized Power Level (MWt) 3,390

]

j Maximum Dependable Capacity (Net MWe) - 1,075  ;

i Design Electrical Rating (Net MWe)  : 1,104

3. Power Level to which Restricted (if any) (Net MWe)  : N/A
4. Reason for Restriction (if any) . N/A i

l THIS YEAR TO l MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 720.0 4,333.7 80,366.4
6. Reactor Reserve Shutdown Hours o.0 0.0 0.0
7. Hours Generator was On-line 720.0 4,308.7 79,394.8
8. Unit Reserve Shutdown Hours o.o 0.0 0.0 l
9. Gross Thermal Energy Generated (MWH) 2,440,018 14,595,30s 263,291,746 l
10. Gross Electrical Energy Generated (MWH) 824,860 4,933,690 87,792,060
11. Net Electrical Energy Generated (MWH) 789,509 4,729,485 83,735,300 i
12. . Reactor Service Factor 100.0 99.2 85.1
13. Reactor Availability Factor 100.0 99.2 85.1
14. Unit Service Factor 100.0 98.7 84.1
15. Unit Availability Factor 100.0 98.7 84.1
16. Unit Capacity Factor (using MDC) 102.0 100.7 82.5
17. Unit Capacity Factor (using DER) 99.3 98.1 80.4

) 18. Unit Forced Outage Rate 0.0 1.3 3.3

,_ r.m.

l OPERATING DATA REPORT d

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3

DATE OF REPORT
July 2,1996

) COMPLETED BY : D. S. Freeman j TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)

i i 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

~

NONE l l i l j 20. If Shutdown at end of report period, estimated date of startup : N/A i 21. Unit is in Commercial Ooeration.

! THIS YEAR TO MONTH DATE CUMULATIVE i

) 22. Hours in Reporting Period 720 4,367 94,392 l 23. Unit Forced Outage Hours 0.0 58.3 2,731.5

} 24. Nameplate Rating (Gross MWe)  : 1,200 l Max. Dependable Capacity (Gross MWe) . 1,120

25. If changes occur in capacity ratings (Items 2 and 24) since the last report, l q give the reasons :

i N/A 1

I i

1 l

74roo Page 4 of 6

AVERAGE DAILY UNIT POWER LEVEL

! DOCKET NUMBER : 50-382 l UNIT NAME : WATERFORD 3

. DATE OF REPORT : July 2,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 i ,

i i

Reporting Period : June,1996 ( NET MWe )

. I

! DAY Avg. Power Level DAY Avg. Power Level

) 1 1,099 16 1,098

) 2 1,099 17 1,097

! 3 1,099 18 1,097 4 1,098 19 1,098 l

l 5 1,097 20 1,097 6 1,097 21 1,097

~

l 7 1,097 22 1,096 l 8 1,097 23 1,096 l 9 1,099 24 1,096 l 10 1,098 25 1,095 11 1,095 26 1,095 f

i 12 1,098 27 1,094 13 1,098 28 1,093 14 1,097 29 1,092 15 1,098 30 1,090 f

i i

$ INSTRUCTIONS :

i j On this form, list the average daily unit power level in MWe-Net for each i

day in the reporting month. Compute to the nearest whole megawatt.

7/tw Page 5 of 6

1 UNIT SHUTDOWNS AND POWEh REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : July 2,1996 l COMPLETED BY : D. S. Freeman  ;

TELEPHONE: (504) 464-3352 l

REPORTING PERIOD : June,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 1 3 - Automatic Scram H - Other (e.xplain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) l I

71 % Page 6 of 6 i

.