k A
s Ent:rgy Operitions. Inc.
i PO. Box B j
Kiliona. LA 70066 4
Tel 504 739 6242
)
mes J. Fisicaro V[a e or W3F1-96-0109 A4.05 PR July 15,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of June,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours,
)
n
.P" J.J. Fisic o Director Nuclear Safety JJF/DFUssf Attachment I
cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center)
NRC Resident inspectors Office 9607170034 960630 PDR ADOCK 05000382 Ill R
PDR i
NRC MONTHLY OPERATING REPORT i
SUMMARY
OF OPERATIONS WATERFORD 3 3
for June,1996 i
The unit operated at an average reactor power level of 99.97% and experienced no shutdowns or significant power reductions during the period, i
1 i
d 4
)
)
a i
l 7/s%
Page : I of 6
\\
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for June,1996 There were no pressurizer safety valve failures or challenges experienced during the month.
I l
i 1
7/t%
Page. 2 of 6
~
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : July 2,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 OPERATING STATUS i
- 1. Reporting Period June,1996 i
Gross Hours in Reporting Period 720
]
- 2. Currently Authorized Power Level (MWt) 3,390 j
Maximum Dependable Capacity (Net MWe) -
1,075 i
Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A i
THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 720.0 4,333.7 80,366.4
- 6. Reactor Reserve Shutdown Hours o.0 0.0 0.0
- 7. Hours Generator was On-line 720.0 4,308.7 79,394.8
- 8. Unit Reserve Shutdown Hours o.o 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,440,018 14,595,30s 263,291,746
- 10. Gross Electrical Energy Generated (MWH) 824,860 4,933,690 87,792,060
- 11. Net Electrical Energy Generated (MWH) 789,509 4,729,485 83,735,300 i
- 12.. Reactor Service Factor 100.0 99.2 85.1
- 13. Reactor Availability Factor 100.0 99.2 85.1
- 14. Unit Service Factor 100.0 98.7 84.1
- 15. Unit Availability Factor 100.0 98.7 84.1
- 16. Unit Capacity Factor (using MDC) 102.0 100.7 82.5
- 17. Unit Capacity Factor (using DER) 99.3 98.1 80.4
)
- 18. Unit Forced Outage Rate 0.0 1.3 3.3 r.m.
OPERATING DATA REPORT d
DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : July 2,1996
)
COMPLETED BY :
D. S. Freeman j
TELEPHONE:
(504) 464-3352 OPERATING STATUS (Cont.)
i i
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE l
~
i j
- 20. If Shutdown at end of report period, estimated date of startup :
N/A i
- 21. Unit is in Commercial Ooeration.
THIS YEAR TO MONTH DATE CUMULATIVE i
)
- 22. Hours in Reporting Period 720 4,367 94,392 l
- 23. Unit Forced Outage Hours 0.0 58.3 2,731.5
}
- 24. Nameplate Rating (Gross MWe) 1,200 l
Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, q
give the reasons :
i N/A 1
I i
1 74roo Page 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 l
UNIT NAME : WATERFORD 3 DATE OF REPORT : July 2,1996 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 i
i i
Reporting Period :
June,1996
( NET MWe )
I DAY Avg. Power Level DAY Avg. Power Level
)
1 1,099 16 1,098
)
2 1,099 17 1,097 3
1,099 18 1,097 l
4 1,098 19 1,098 l
5 1,097 20 1,097 6
1,097 21 1,097 l
~
7 1,097 22 1,096 l
8 1,097 23 1,096 l
9 1,099 24 1,096 l
10 1,098 25 1,095 f
11 1,095 26 1,095 i
12 1,098 27 1,094 13 1,098 28 1,093 14 1,097 29 1,092 15 1,098 30 1,090 f
i i
INSTRUCTIONS :
i j
On this form, list the average daily unit power level in MWe-Net for each i
day in the reporting month. Compute to the nearest whole megawatt.
7/tw Page 5 of 6
UNIT SHUTDOWNS AND POWEh REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : July 2,1996 l
COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 REPORTING PERIOD :
June,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (e.xplain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) l I
71 %
Page 6 of 6 i
.