. _ _ _ _ __ _. - . _ . . _ - . . .

C3 Entergy

,4g g:gygwam u Operations - u 7m#

Ts 504 733-6650 i

W3F1-97-0050 l I

A4.05 PR l March 17,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

)

Subject:

Waterford 3 SES Docket No. 50-382 l License No. NPF-38 '

Monthly Operating Report Gentlemen: i Attached is the subject monthly report which covers the operating statistics for the month of February,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Should you have any questions regarding the above, please contact me at (504) 739-6666 or David Litolff at (504) 739-6693.

Very truly yours,

,f .

  • N T.J. Gaudet Acting - Director i Nuclear Safety & Regulatory Affairs .-

gt TUv ~. l TJG/DFL/ssf Attachment Ngg13 cc: L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR),

R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),

J.T. Wheelock (INPO Records Center), NRC Resident Inspectors Office

$[0900$ko$$$$s2 @,IIE!$!5 M R PDR 1

l

. 1 NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for February,1997 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period, l

i l

l

\

Page : I of 6

,a ,

, . PRESSURIZER SAFETY VALVE

. FAILURES AND CHALLENGES

, WATERFORD 3

for February,1997 4

4 There were no pressurizer safety valve failures or challenges experienced during the month.

J e

i 1 d

! i 4

a i

1 3

l 4

4 l

3 r

j l

I 1

1 3

')

i l'**7 Page 2 of 6

i .

l l ,

OPERATING DATA REPORT DOCKET NUMBER : 50-382 4

l UNIT NAME : WATERFORD 3 DATE OF REPORT : March 6,1997

COMPLETED BY : D. S. Freeman l

, TELEPHONE: (504) 464-3352 1

i OPERATING STATUS I 4

1. Reporting Period  : February,1997 Gross Hours in Reporting Period  : 672 l 2. Currently Authorized Power Level (MWt) . 3,390 Maximum Dependable Capacity (Net MWe) : 1,075

} Design Electrical Rating (Net MWe)  : 1,104

3. Power Level to which Restricted (if any) (Net MWe)  : N/A
4. Reason for Restriction (if any)
N/A J

I THIS YEAR TO

MONTH DATE CUMULATIVE 4
5. Number of Hours Reactor was Critical 672.0 1,416.0 85,720.1
6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
7. Hours Generator was On-line 672.0 1,416.0 84,740.4
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 1
9. Gross Thermal Energy Generated (MWH) 2,273,932 4,794,401 281,051,766
10. Gross Electrical Energy Generated (MWH) 776,650 1,636,280 93,822,560
11. Net Electrical Energy Generated (MWH) 745,839 1,570,744 89,503,40s
12. Reactor Service Factor 100.0 100.0 85.5
13. Reactor Availability Factor 100.0 100.0 85.5 l 14. Unit Service Factor 100.0 100.0 84.s
15. Unit Availability Factor 100.0 100.0 84.s

, 16. Unit Capacity Factor (using MDC) 103 2 103.2 83.1

) 17. Unit Capacity Factor (using DER) 100.5 100.5 80.9

18. Unit Forced Outage Rate 0.0 0.0 3.7 3/e97 Page : 3 of 6 4

y.--

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 6,1997 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

REFUEL - April 11,1997 - 34 days

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 672 1,416 100,225
23. Unit Forced Outage Hours 0.0 0.0 3,218.9
24. Nameplate Rating (Gross MWe)  : 1,200 Max. Dependable Capacity (Gross MWe) . 1,120
25. If changes occur in capacity ratings (ltems 2 and 24) since the last report, give the reasons : 4 N/A I

I i

i Page : 4 of 6

l .

l ,

. AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NUMBER : 50-382

UNIT NAME : WATERFORD 3 t

DATE OF REPORT : March 6,1997

COMPLETED BY : D. S. Freeman i

TELEPHONE : (504) 464-3352 Reporting Period : February,1997 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,111 16 1,112 2 1,111 17 1,112 3 1,111 18 1,111 4 1,111 19 1,111 5 1,110 20 1,111 6 1,111 21 1,111 7 1,111 22 1,112 l 8 1,111 23 1,112 9 1,078 24 1,112 10 1,109 25 1,113 11 1,111 26 1,112 12 1,111 27 1,112 13 1,109 28 1,111 14 1,108 15 1,112 j

INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Pagt : 5 of 6

, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 6,1997 l COMPLETED BY : D. S. Freeman TELEPHONE: (504)464-3352 REPORTING PERIOD : February,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative j 2 - Manual Scram G - Operational Error (explain) l 3 - Automatic Scram H - Other (explain) f 4 - Continuation from Previous Period )

5 - Power Reduction l 6 - Other (explain) l 1

M97 Page : 6 of 6