ML20136H266
| ML20136H266 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/28/1997 |
| From: | Freeman D, Gaudet T ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-97-0050, W3F1-97-50, NUDOCS 9703190102 | |
| Download: ML20136H266 (7) | |
Text
.
C3
,4g Entergy g:gygwam u Operations
- u 7m#
Ts 504 733-6650 i
A4.05 PR March 17,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
i Attached is the subject monthly report which covers the operating statistics for the month of February,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 739-6666 or David Litolff at (504) 739-6693.
Very truly yours,
,f N
T.J. Gaudet Acting - Director i
Nuclear Safety & Regulatory Affairs gt TUv ~.
l Ngg13 TJG/DFL/ssf Attachment cc:
L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR),
R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Records Center), NRC Resident Inspectors Office
$[0900$ko$$$$s2
@,IIE!$!5 M R
PDR 1
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for February,1997 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period, l
i
\\
Page : I of 6
,a PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for February,1997 4
4 There were no pressurizer safety valve failures or challenges experienced during the month.
J e
i 1
d 4
a i
3 4
4 3
r j
l I
1 1
3
')
i l'**7 Page 2 of 6
i l
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 4
DATE OF REPORT :
March 6,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 1
i OPERATING STATUS 4
- 1. Reporting Period February,1997 Gross Hours in Reporting Period 672 l
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075
}
Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A J
I THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 672.0 1,416.0 85,720.1 4
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
- 7. Hours Generator was On-line 672.0 1,416.0 84,740.4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,273,932 4,794,401 281,051,766
- 10. Gross Electrical Energy Generated (MWH) 776,650 1,636,280 93,822,560
- 11. Net Electrical Energy Generated (MWH) 745,839 1,570,744 89,503,40s
- 12. Reactor Service Factor 100.0 100.0 85.5
- 13. Reactor Availability Factor 100.0 100.0 85.5 l
- 14. Unit Service Factor 100.0 100.0 84.s
- 15. Unit Availability Factor 100.0 100.0 84.s
- 16. Unit Capacity Factor (using MDC) 103 2 103.2 83.1
)
- 17. Unit Capacity Factor (using DER) 100.5 100.5 80.9
- 18. Unit Forced Outage Rate 0.0 0.0 3.7 3/e97 Page : 3 of 6 4
y.--
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
March 6,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL - April 11,1997 - 34 days
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 672 1,416 100,225
- 23. Unit Forced Outage Hours 0.0 0.0 3,218.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (ltems 2 and 24) since the last report, give the reasons :
4 N/A i
i Page : 4 of 6
l l
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 t
DATE OF REPORT :
March 6,1997 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 464-3352 i
Reporting Period :
February,1997
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,111 16 1,112 2
1,111 17 1,112 3
1,111 18 1,111 4
1,111 19 1,111 5
1,110 20 1,111 6
1,111 21 1,111 7
1,111 22 1,112 8
1,111 23 1,112 9
1,078 24 1,112 10 1,109 25 1,113 11 1,111 26 1,112 12 1,111 27 1,112 13 1,109 28 1,111 14 1,108 15 1,112 j
INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Pagt : 5 of 6
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : March 6,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504)464-3352 REPORTING PERIOD :
February,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative j
2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) f 4 - Continuation from Previous Period
)
5 - Power Reduction 6 - Other (explain) 1 M97 Page : 6 of 6