4 L.. ' g Ent; gy per;tlins, Inc.
Killona. LA 70006 Tel 504 739 G242 Ear C. Ewing, Ill ear Safety & Regulatory Affairs W3F1-99-0094 l
A4.05 PR May 14,1999 l
U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38.
Monthly Operating Report Gentlemen:
Attached is the subject monthly report that covers the operating statistics for the month of April,1999. This report is submitted per Section 6.9.1.6 of the Waterford 3 -
Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at -
(504) 739-6242 or A.L. Lewis at (504) 739-6726.
Very truly yours,
& h h EL.'
v' -
)
E.C. Ewing
/
Director Nuclear Safety & Regulatory Affairs ECE/ALL/rtk Attachment cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
P. Lewis (INPO Records Center), NRC Resident inspectors Office i
,, e n,m l
9905210207 990430 PDR ADOCK 05000382 R
PDR.
1 NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 l
1 for April,1999 Refueling Outage #9 was completed near the beginning of the month. The resulting average reactor power level of 89.6% was achieved for the time-period.
1 SW Page. I of 6 l
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for April,1999 There were no pressurizer safety valve failures or challenges experienced during the month.
Page 2 of 6
i I
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
May 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575 OPERATING STATUS
- 1. Reporting Period April,1999 Gross Hours in Reporting Period 719
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 707.4 1,907.1 100,496.6
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 672.1 1,871.9 99,325.5
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,183,602 5,961,799 329,584,897
- 10. Gross Electrical Energy Generated (MWH) 739,518 2,017,713 110,257,778
- 11. Net Electrical Energy Generated (MWH) 708,708 1,932,250 105,20s,370
- 12. Reactor Service Factor 98.4 66.2 84.3
- 13. Reactor Availability Factor 98.4 66.2 84.3
- 14. Unit Service Factor 93.5 65.0 83.3
- 15. Unit Availability Factor 93.5 65.0 83.3
- 16. Unit Capacity Factor (using MDC) 91.7 E2.4 82.1
- 17. Unit Capacity Factor (using DER) 89.3 60.8 79.9
- 18. Unit Forced Outage Rate 0.0 0.0 3.8 Page : 3 of 6
~
OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
May 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 719 2,879 119,20s
- 23. Unit Forced Outage Hours o.0 0.0 3,ess.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (ltems 2 and 24) since the last report, give the reasons :
N/A t
i
$@99 Page ; 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : May 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575
(
Reporting Period :
April,1999
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
0 16 1,111 2
1 17 1,111 3
311 18 1,110
{
4 661 19 1,110 f
5 864 20 1,110 6
1,106 21 1,110 7
1,112 22 1,110 8
1,114 23 1,110 9
1,113 24 1,109 10 1,112 25 1,095 11 1,112 26 1,091 12 1,110 27 1,108 13 1,110 28 1,109 14 1,109 29 1,110 15 1,109 30 1,109 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
ggy Page : $ of 6
'~
l UNIT SHUTDOWNS AND POWER REDUCTIONS l
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : May 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575 REPORTING PERIOD :
April,1999 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions 99-01 990219 S
46.9 C
4 Refuel Outage 9 was completed near the beginning of the month.
TYPE REASON F - Forced A - Equipment Failure (explain) l S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
$W99 Page. 6 of 6