ML20096C276
| ML20096C276 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/31/1995 |
| From: | Burski R, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-96-0005, W3F1-96-5, NUDOCS 9601170203 | |
| Download: ML20096C276 (7) | |
Text
lO
~=, ENTERGY I"OI"e'""" " '"*'
Kdiona LA 70066 Tel 504 739 6774 R. F. Burski Onector Ntotear Seifety W3W%td 3 W3F1-96-0005 A4.05 PR January 12, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
J Attached is the subject monthly report which covers the operating statistics for the month of December, 1995.
This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INP0 Records Center)
NRC Residant Inspectors Office 170030 9601170203 951231 g di 1 4 PDR ADOCK 05000382 R
PDR lj g
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for December, 1995 The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.
)
1&W Page : 4 of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for December, 1995 There were no pressurizer safety valve failures or challenges experienced during the month.
e 4,
1496 Page : 2 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
January 8, 1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 OPERATING STATUS
- 1. Reporting Period December, 1995 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) :
3.390 J
Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) :
1,104
- 3. Power '.evel to which Restricted (if any) (Net MWe) :
N/A
- 4. Reason for Restriction (if any)
N/A i
l THIS YEAR TO MONTH DATE CUMULATIVE l
- 5. Number of Hours Reactor was Critical 744.0 7,309.9 76,032.7 6.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 7,241.9 75.086.2
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thermal Energy Generated (MWH) 2.517,767 24,366,832 248,696.441
- 10. Gross Electrical Energy Generated (MWH) 848,580 8.123,910 82,858,370
- 11. Net Electrical Energy Generated (MWH) 813,890 7,763,449 79,005,815
- 12. Reactor Service Factor 100.0 83.4 84.5
- 13. Reactor Availability Factor 100.0 83.4 84.5
- 14. Unit Service Factor 100.0 82.7 83.4
- 15. Unit Availability Factor 100.0 82.7 83.4
- 16. Unit Capacity Factor (using MDC) 101.8 82.4 81.6
- 17. Unit Capacity Factor (using DER) 99.1 80.3 79.5
- 18. Unit Forced Outage Rate 0.0 6.0 3.4 14 %
Pepe. 3 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
January 8, 1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 OPERATING STATUS (Cont.)
i
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup:
N/A l
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 8,760 90,025
- 23. Unit Forced Outage Hours 0.0 463.0 2.673.2
- 24. Nameplate Rating (Gross MWe) :
1,200 Max. Dependable Capacity (Gross MWe) :
1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A j
i i
FE86 P.ge 4 of 6
~
j AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF REPORT :
January 8, 1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 Reporting Period :
December, 1995
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,095 16 1,096 2
1,095 17 1,095 3
1,095 18 1,095 4
1,096 19 1,095 5
1,050 20 1,095 6
1,086 21 1,096 7
1,094 22 1,097 8
1,095 23 1,097 9
1,095 24 1,098 10 1,096 25 1,097 11 1,096 26 1,096 12 1,096 27 1,097 13 1,096 28 1,096 14 1,096 29 1,097 15 1,096 30 1,097 31 1,095 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
4 e
[Q kJNI $Nh
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME :
WATERFORD 3 DATE OF PEPORT :
January 8, 1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 REPORTING PERIOD :
December, 1995 Date
- Duration
- Shutdown Cause, Comments and Number (yymmdd)
Type (Hours)
Reason Method Corrective Actions NONE TEE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (exp1ain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 1.1u96 page e or e