ML20217H948
| ML20217H948 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/30/1997 |
| From: | Ewing E, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-97-0242, W3F1-97-242, NUDOCS 9710170151 | |
| Download: ML20217H948 (7) | |
Text
_, _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _
~
eg~
Ente gy per;tions. Inc.
O/
Kmona. LA 70066 Tel 504 739 6242 C. Ewing, til gage,a %pmyin.
W3F1-97-0242 A4.05 PR October 15,1997
- U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of September,1997. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739-6666.
Very truly yours, L
t
\\
T E.C. Ewing
[hh'i Director Nuclear Safety & Regulatory Affairs ECE/ PRS /ssf Attachment cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Records Center), NRC Resident inspectors
<. v. -r -
Office 97101 0151 970930 I
PDR ADOCK 05000382 R
NRC MONTHLY OPERATING REPORT SllMMARY OF OPERATIONS WATERFORD 3 for September,1997 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
4 I
Page I of 6
+,
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for September,1997 There were no pressurizer safety valve failures or challenges experienced during the month.
(
=
9 l@7M7 Page 2 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
October 7,1997 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS
- 1. Reporting Period September,1997 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 720.0 4,029.6 88,333.7
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0 7
7, Hours Generator was On-line 720.0 3,952.4 87,276.7
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,439,155 13,246,120 289,503,485
- 10. Gross Electrical Energy Generated (MWH) 825,900 4,490,960 96,677,240
- 11. Net Electrical Energy Generated (MWH) 789,613 4,279,900 92,212,561
- 12. Reactor Service f actor 100.0 61.5 83.8
- 13. Reactor Availability Factor 100.0 61.5 85.8
- 14. Unit Service Factor 100.0 60.3 82.8
- 15. Unit Availability Factor 100.0 60.3 82.8
- 16. Unit Capacity Factor (using MDC) 102.0 60.8 81.4
- 17. Unit Capacity Factor (using DER) 99.3 59.2 79.3
- 18. Unit Forced Outage Rate 0.0 0.0 3.6 MW Page. 3 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 7,1997 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, dste and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of ttartup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 720 6,551 10s,360 d
- 23. Unit Forced Outage Hours o.o 0.0 3,218.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A i
i 10 0/97 Page 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 7,1997 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6575 Reporting Period :
September,1997
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,095 16 1,098 2
1,095 17 1,038 3
1,094 18 1,098 4
1,093 19 1,098 5
1,095 20 1,099 6
1,096 21 1,098 7
1,096 22 1,098 8
1,093 23 1,096 9
1,096 24 1,097 10 1,096 25 1,098 11 1,096 26 1,097 12 1,096 27 1,097 13 1,097 28 1,098 14 1,098 29 1,098 15 1,098 30 1,099 INSTRUCTIONS :
On this form, list the average daily :: nit power level in MWe-Net for each day in the reporting month Compute to the nearest whole megawatt.
O em e.
i o
.~
.o UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 7,1997 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6575 REPORTING PERIOD : September,1997 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
Reason Method Corrective Actions NONE TYPE REASON F - Fo ced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
W797 Page o of 6