ML20195K339
| ML20195K339 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/31/1999 |
| From: | Ewing E, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-99-0102, W3F1-99-102, NUDOCS 9906220065 | |
| Download: ML20195K339 (7) | |
Text
V Enti gy Operstions, Inc.
Killona. LA 70006 Tel 504 739 6242 r
C. Ewing, lil Nuc r Safety & Regulatory Af*mrs W3F1-99-0102 A4.05 PR June 14,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Subjec+:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report that covers the operating statistics for the month of May,1999. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at f
(504) 739-6242 or A.L. Lewis at (504) 739-6726.
7 Very truly yours, M $(
CC k[a}
Z9 r
E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/ALL/rtk Attachment cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data institute, Inc.),
,,1 P. Lewis (INPO Records Center), NRC Resident inspectors Office
..l o >
8 9906220065 990531 DR ADOCK 0500
(
NRC MONTHLY OPERATING REPORT I
SUMMARY
OF OPERATIONS WATERFORD 3 for May,1999 The unit operated at an average reactor power level of 99.6% and experienced no shutdowns or significant power reductions during the period.
W7/99 Page. I of 6
1 PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 l
for May,1999 i
i There were no pressurizer safety valve failures or challenges experienced during the month.
i l
i 1
Page 2 of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 7,1999 COMPLETED BY :
D. S. Freeman TELEPHONE :
(604) 739-6575 OPERATING STATUS
- 1. Reporting Period May,1999 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 2,651.1 101,240.6
- 6. Reactor Reserve Shutdown Hours o.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 2,615.9 100,069.5
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,513,051 8,474,850 332,097,948
- 10. Gross Electrical Energy Generated (MWH) 856,499 2,874,212 111,114,277
- 11. Net Electrical Energy Generated (MWH) 821,733 2,753,983 106,028,103
- 12. Reactor Service Factor 100.0 73.2 84.4
- 13. Reactor Availability Factor 100.0 73.2 84.4
- 14. Unit Service Factor 100.0 72.2 83.4
~
- 15. Unit Availability Factor 100.0 72.2 83.4
- 16. Unit Capacity Factor (using MDC) 102.7 70.7 82.2
- 17. Unit Capacity Factor (using DER) 100.0 68.9 80.1
- 18. Unit Forced Outage Rate 0.0 0.0 3.8 MMo Page. 3 of 6
OPERAT!NG DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3
)
DATE OF REPORT : June 7,19*.9 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504)739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) -
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE i
- 22. Hours in Reporting Period 744 3,823 119,952
- 23. Unit Forced Outage Hours 0.0 0.0 3,ss3.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (ltems 2 and 24) since the last report, give the reasons :
N/A 6f7AN Page 4 of 6
p 4
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NUMBsR :
50-382 UNIT NAME : WATERFORD 3 i
DATE OF REPORT : June 7,1999 I
COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739 4 575 Reporting Period :
May,1999
( NET MWe )
DAY Avg. Power level DAY Avg. Power level
\\
1 1,075 16 1,108 2
1,110 17 1,027 3
1,112 18 1,082 4
1,111 19 1,105 5
1,111 20 1,105 6
1,111 21 1,106 7
1,112 22 1,105 8
1,112 23 1,107 9
1,110 24 1,111 10 1,110 25 1,112 11 1,109 26 1,111 12 1,108 27 1,110 13 1,107 28 1,110 14 1,107 29 1,110 15 1,107 30 1,110 31 1,109 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
60N9 Page '. 5 of 6
s o
UNIT SHUTDOWNS AND POWER REDUCTIONS l
DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 7,1999 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 REPORTING PERIOD :
May,1999
~
Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE i
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
Page 6 of 6