ML20132B944
| ML20132B944 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/30/1996 |
| From: | James Fisicaro, Freeman D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-96-0218, W3F1-96-218, NUDOCS 9612180025 | |
| Download: ML20132B944 (7) | |
Text
.
C^
Ent: gy Operati:ns,Inc.
Killona. LA 70066 Tel 504 739 6242 am J. Fisicaro M:fa'**
W3F1-96-0218 A4.05 PR December 13,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 i
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report i
i Gentlemen.
i Attached is the subject monthly report which covers the operating statistics for the month of November,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, CW w
J.J. Fisicaro Director Nuclear Safety 1
JJF/DFUssf lt Attachment cc:
L.J. Callan, NRC Region IV O
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center)
J700An NRC Resident inspectors Office 9612180025 961130 PDR ADOCA 03000382 R
(JR
t a
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS j
WATERFORD 3 i
for November,1996 j
The unit experienced no shutdowns and one (1) significant power reduction during the reporting period resulting in an average power level of 95.4%
i t
2 i
1 4
l 1
i i
i i
e 3
1
)
mi r
i
\\
4 1
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for November,1996 l
There were no pressurizer safety valve failures or challenges experienced during the month i
l l
11'10 %
Page 2 of 6
\\
OPERATING DATA REPORT l
DOCKET NUMBER :
50-382
}
UNIT NAME : WATERFORD 3 4
DATE OF REPORT :
December 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 i
)
OPERATING STATUS I
- 1. Reporting Period November,1996 Gross Hours in Reporting Period 720 l
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe).
1,07s Design Electrical Rating (Net MWe) 1,104 i
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
)
i
- 4. Reason for Restriction (if any)
N/A i
4 i
i THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 720.0 7,527.5 83,560,1 4
- 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0 l
- 7. Hours Generator was On-line 720.0 7,494.3 82,580s4
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 j
- 9. Gross Thermal Energy Generated (MWH) 2,328,211 25,241,999 273,938,439
- 10. Gross Electrical Energy Generated (MWH) 783,630 8,493,520 91,351,890
- 11. Net Electrical Energy Generated (MWH) 750,570 8,126,789 87,132,604 j
- 12. Reactor Service Factor 100.0 93.6 85.2
- 13. Reactor Availability Factor 100.0 93.6 85.2'
- 14. Unit Service Factor 100.0 93.2 84.2
- 15. Unit Availability Factor 100.0 93.2 84.2
- 16. Unit Capacity Factor (using MDC) 97.0 94.0 82.7 17 Unit Capacity Far,t.. Wsing DER) 94.4 91.6 80.5
- 18. Unit Forced Outule Rate 0.0 6.8 3.8 12/10rm Page 3 of 6
\\
OPERATING DATA REPORT DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
December 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE :
(504) 464-3352 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL - April 11,1997 - 34 days
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
4 THIS YEAR TO MONTH DATE CUMULATIVE l
- 22. Hours in Reporting Period 720 8,040 98,065
- 23. Unit Forced Outage Hours 0.0 545.7 3,218.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A Page 4 of 6
j
,t
[
AVERAGE DAILY UNIT POWER LEVEL j
DOCKET NUMBER : 50-382 i
UNIT NAME : WATERFORD 3 i
DATE OF REPORT : December 9,1996 l
COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 l
)
}
Reporting Period :
November,1996
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level l
1 1,089 16 1,091 l
2 1,089 17 1,091 i
3 1,089 18 1,091 l
4 1,089 19 1,090 5
1,089 20 1,090
{
6 1,086 21 720 7
1,087 22 654 8
1,090 23 656 3
9 1,090 24 811 10 1,090 25 1,096 l
11 1,091 26 1,107 12 1,091 27 1,109 13 1,091 28 1,109 14 1,090 29 1,109 15 1,090 30 1,110 INSTRUCTIONS :
On this form, list the average daily unit power level 5 MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
m-r.,
3 or.
.s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
December 9,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 REPORTING PERIOD :
November,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
Reason Method Corrective Actions 96-03 961121 F
96.1 A
5 Power level was reduced to 60% to take the 'B' SGFP (Steam Generator Feed Pump) out of service due to bearing temperatures trending high.
Bearing damage occurred while shutting down pump.
Sludge build-up in the lube oil lines and on bearing were inhibiting bearing lubrication.
Lines were cleaned, sludge i
removed, and bearings were i
changed out.
Refer to CR-96-1825 for additional details.
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 4 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) 1.V10%
Page 6 of 6