Monthly Operating Rept for Jan 1998 for Waterford,Unit 3
ML20202G509
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1998
From: Ewing E, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-98-0025, W3F1-98-25, NUDOCS 9802200150
Download: ML20202G509 (7)


Text

f.

' & g Ent: gy por:tions,inc.

Killona. LA 70066 Tel 604 739 6242 ]

j Early C. Ewing. Ill N c ar a ety & Regulatory A* airs W3F1-98-0025 A4.05 PR February 16,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50 382 License No. NPF-38 Monthly Operating Report l l

Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of January,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38. ,

Should you have any questions regarding the above, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739-6666.

Very truly yours,

~

.y i

/

E.C. E ing Director Nuclear Safety & Regulatory Affairs ECE/ PRS /ssf , : - *'

Attachment .,v cc: E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

/j J.T. Wheelock (INPO Records Center), NRC Resident inspectors Office p

7,8822286s! Zi8a%,2 1.1 l.lBl.it 1.11.lil.11.I'l.l

,4 ao .. - -

e NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for January,1998 The unit op 4ted at an average reactor power level of 99.7% and experienced no shutdowns o* significant power reductions during the pericd.

I i

l IM8 Page I of 6

_ _ _ _ _ . _ . _ . J

/ .

. PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for January,1998 .

There were no pressurizer safety valve failures or challenges experienced during the month.

1 % 98 Pap 2 of -

, _, . . . . _.)

OPERATING DATA REPORT DOCKET NUMBER : 50-382 i

UNIT NAME : WATERFORD 3 DATE OF REPORT : February 6,1998

, COMPLETED BY : D. S. Freeman j TELEPHONE: (504) 739-6575 OPERATING STATUS

1. Reporting Period  : January,1998 Gross Hours in Reporting Period -

744 4

2. Currently Authorized Power Level (MWt)  : 3,390 Maximum Dependable Capacity (Net MWe) : 1,075
Design Electrical Rating (Net MWe) . 1,104
3. Power Level to which Restric'ed (if any) (Net MWe)
N/A
4. Reason for Restriction (if any)
N/A 4

THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours heactor was Critical 744.0 744.0 91,286.7
6. Reactor Reserve Shutdown Hours o.0 0.0 0.0
7. Hours Generator was On-line 744.0 744.0 90,229.7
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,513,765 2,513,765 299,495,37b
10. Gross Electrical Energy Generated (MWH) 857,798 857,798 100,077,836
11. Net Electrical Energy Generated (MWH) 823,779 823,779 95,477,116
12. Reactor Servica Factor 100.0 100.0 84.3

-13. Reactor Availability Factor 100.0 100.0 84.3

14. Unit Service Factor 100.0 100.0 83.3
15. Unit Availability Factor 100.0 100.0 83.3
16. Unit Capacity Factor (using MDC) 103.3 103.0 82.0
17. Unit Capacity Factor (using DER) 100.3 100.3 79.8

'i8. Unit Forced Outage Rate 0.0 0.0 3.4 gg Page 3 of 6

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : February 6,1998 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-0575 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 744 108,313
23. Unit Forced Outage Hours 0.0 0.0 3,218.9
24. Nameplate Rating (Gross MWo)  : 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since <.he last report, give the reasons :

N/A 2/698 Page 4 of 6

1 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : February 6,1998 COMPLETED BY : D. S, Freeman TELEPHONE: (504)739-6575 Reporting Period : January,1998 ( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1 1,108 16 1,112 2 1,108 17 1,112 3 1,108 18 1,113 4 1,108 19 1,109 5 1,108 20 1,113 6 1,108 21 1,110 <

7 1,108 22 1,107 8 1,112 23 1,105

~

9 1,113 24 1,000 10 1,113 25 1,112 11 1,113 26 1,112 12 1,114 27 1,112 '

13 1,113 28 1,112 14 1,112 29 1,112 15 1,112 30 1,113 31 1,113 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

2/eM4 Page 5 of 6 e

e

. 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : February 6,1998 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 739-6575 REPORTING PERIOD : January,1998 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) i 1 % 9 11 Page 6 of 6

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _