Monthly Operating Rept for Sept 1996 for Waterford 3 Ses
ML20128P992
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/30/1996
From: James Fisicaro, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0181, W3F1-96-181, NUDOCS 9610180185
Download: ML20128P992 (7)


Text

1

- Ent rgy Oper tions,Inc.

Kiona 70066 Tel 504 739 6242 am s J. Fisicaro

% f;n*

W3F1-96-0181 A4.05 PR October 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

~

Subject Waterfo'd r 3 SES Docket No. 50-382 License No. NPF-38 l Monthly Operating Report i Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of September,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, o Nb J.J.Fisi ro Director Nuclear Safety JJF/DFL/ssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR /f R.B. McGehee > fI '

N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center)

NRC Resident inspectors Office

  • ^ ^

9616180185 960930 PDR ADOCK 05000302 R PDR

i

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS

. WATERFORD 3

, for September,1996 i

1 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.

1 i

4 IM% Page : 1 of 6

i j PRESSURIZER SAFETY VALVE )

l j FAILURES AND CHALLENGES WATERFORD 3 l for September,1996 i

i There were no pressurizer safety valve failures or challenges experienced during the month.

i l

)

WL% Page 2of6

OPERATING DATA REPORT

. DOCKET NUMBER : 50-382 I

UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996 I l COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS

{ 1. Reporting Period  : September,1996 j Gross Hours in Reporting Period . 720

2. Currently Authorized Power Level (MWt) . 3,390 Maximum Dependable Capacity (Net MWe) : 1,075 Design Electrical Rating (Net MWe) -

1,104

3. Power Level to which Restricted (if any)(Net MWe) -

N/A

4. Reason for Restriction (if any)  : N/A THIS YEAR TO MONTH DATE CUMULATIVE
5. Number of Hours Reactor was Critical 720.0 6,062.5 82,095.1
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 720.0 6,029.3 81,115.4
8. Unit Reserve Shutdown Hours o.o 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,437,808 20,399,601 269,096,041
10. Gross Electrical Energy Generated (MWH) 809,400 6,868,300 89,726,670
11. Net Electrical Energy Generated (MWH) 773,287 6,569,281 85,575,096
12. Reactor Service Factor 100.0 92.2 85.0
13. Reactor Availability Factor 100.0 92.2 85.0
14. Unit Service Factor 100.0 91.7 84.0
15. Unit Availability Factor 100.0 91.7 84.0
16. Unit Capacity Factor (using MDC) 99.9 92.9 82.4
17. Unit Capacity Factor (using DER) 97.3 90.5 80.2
18. Unit Forced Outage Rate 0.0 8.3 3.8 IM% Page : ) of 6

OPERATING DATA REPORT DOCKET NUMBER : 50-382 J

UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.) l

19. Shutdowns Scheduled over next 6 months (type, date and duratior. cf each) :

l NONE

20. If Shutdown at end of report period, estimated date of startup : N/A
21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE '

22. Hours in Reporting Period 720 6,575 96,600
23. Unit Forced Outage Hours 0.0 545.7 3,218.9
24. Nameplate Rating (Gross MWe) . 1,200 Max. Dependable Capacity (Gross MWe)  : 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :

N/A Page : 4 of 6

i 1 .

. . l

. l

! AVERAGE DAILY UNIT POWER LEVEL f

DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996

{ COMPLETED BY : D. S. Freeman TELEPHONE: (504) 464-3352 i

Reporting Period : September,1996 ( NET MWe )

4 k

l DAY Avg. Power Level DAY Avg. Power Level

1 1,070 16 1,072 2 1,073 17 1,071 j 3 1,073 18 1,071 )

! 4 1,074 19 1,073 5 1,074 20 1,074 l 1

6 1,074 21 1,074 4 7 1,074 22 1,075  !

l 8 1,073 23 1,076

) 9 1,074 24 1,076 I

! 10 1,072 25 1,076 11 1,072 26 1,077 l

i 12 1,071 27 1,078 i

i 13 1,072 28 1,079

, 14 1,072 29 1,079 l 1

i

! 15 1,072 30 1,080 i

i 4

INSTRUCTIONS :

l

. On this form, list the average daily unit power level in MWe-Net for each l

{ day in the reporting month. Compute to the nearest whole megawatt. l 3 i i

4

)

1GF96 Page . 5 of 6

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996 COMPLETED BY : D. S. Freeman TELEPHONE : (504) 464-3352 l

REPORTING PERIOD : September,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE

~ '

q l

l l

1 l

l TYPE REASON F - Forced A - Equipment Failure (explain) I S - Scheduled B - Maintenance or Test ,

C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) liv 1M6 Page 6 of 6