Text
1 Ent rgy Oper tions,Inc.
Kiona 70066 Tel 504 739 6242 am s J. Fisicaro
% f;n*
W3F1-96-0181 A4.05 PR October 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Subject Waterfo'd 3 SES
~
r Docket No. 50-382 License No. NPF-38 l
Monthly Operating Report i
Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of September,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, Nb o
J.J.Fisi ro Director Nuclear Safety JJF/DFL/ssf Attachment cc:
L.J. Callan, NRC Region IV fI C.P. Patel, NRC-NRR
/f R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center)
NRC Resident inspectors Office
- ^
^
9616180185 960930 PDR ADOCK 05000302 R
i NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for September,1996 i
1 The unit operated at an average reactor power level of 99.9% and experienced no shutdowns or significant power reductions during the period.
1 i
4 IM%
Page : 1 of 6
i PRESSURIZER SAFETY VALVE
)
j j
FAILURES AND CHALLENGES WATERFORD 3 l
for September,1996 i
i There were no pressurizer safety valve failures or challenges experienced during the month.
i
)
WL%
Page 2of6
OPERATING DATA REPORT DOCKET NUMBER : 50-382 I
UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996 I
l COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 OPERATING STATUS
{
- 1. Reporting Period September,1996 j
Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 720.0 6,062.5 82,095.1
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 720.0 6,029.3 81,115.4
- 8. Unit Reserve Shutdown Hours o.o 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,437,808 20,399,601 269,096,041
- 10. Gross Electrical Energy Generated (MWH) 809,400 6,868,300 89,726,670
- 11. Net Electrical Energy Generated (MWH) 773,287 6,569,281 85,575,096
- 12. Reactor Service Factor 100.0 92.2 85.0
- 13. Reactor Availability Factor 100.0 92.2 85.0
- 14. Unit Service Factor 100.0 91.7 84.0
- 15. Unit Availability Factor 100.0 91.7 84.0
- 16. Unit Capacity Factor (using MDC) 99.9 92.9 82.4
- 17. Unit Capacity Factor (using DER) 97.3 90.5 80.2
- 18. Unit Forced Outage Rate 0.0 8.3 3.8 IM%
Page : ) of 6
OPERATING DATA REPORT DOCKET NUMBER :
50-382 J
UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duratior. cf each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 720 6,575 96,600
- 23. Unit Forced Outage Hours 0.0 545.7 3,218.9
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A Page : 4 of 6
i 1
AVERAGE DAILY UNIT POWER LEVEL f
DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996
{
COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 i
Reporting Period :
September,1996
( NET MWe )
4 k
l DAY Avg. Power Level DAY Avg. Power Level 1
1,070 16 1,072 2
1,073 17 1,071 j
3 1,073 18 1,071
)
4 1,074 19 1,073 5
1,074 20 1,074 6
1,074 21 1,074 4
7 1,074 22 1,075 l
8 1,073 23 1,076
)
9 1,074 24 1,076 10 1,072 25 1,076 l
11 1,072 26 1,077 i
12 1,071 27 1,078 i
i 13 1,072 28 1,079 14 1,072 29 1,079 1
15 1,072 30 1,080 i
i 4
INSTRUCTIONS :
l On this form, list the average daily unit power level in MWe-Net for each
{
day in the reporting month. Compute to the nearest whole megawatt.
3 i
4
)
1GF96 Page. 5 of 6
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 3,1996 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 464-3352 l
REPORTING PERIOD :
September,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions NONE
~
q l
l l
1 l
l TYPE REASON F - Forced A - Equipment Failure (explain)
I S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) liv 1M6 Page 6 of 6