Monthly Operating Rept for Jul 1996 for Waterford 3
ML20116L043
Person / Time
Site: Waterford 
Issue date: 07/31/1996
From: James Fisicaro, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0132, W3F1-96-132, NUDOCS 9608160068
Download: ML20116L043 (7)


Text

,

l ya Ente y Oper:tions. Inc.

KiHona, LA 70066 Tel 504 739 6242 James J. Fisicaro If" W3F1-96-0132 l

A4.05 PR August 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of July,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, y c.

7%

/[. Fisicaro v irector Nuclear Safety l

4 JJF/DFL/ssf Attachment

/.

I cc:

L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee k\\

N.S. Reynolds

\\

F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center) 160022 NRC Resident inspectors Office 9608160068 960731 PDR ADOCK 05000382 R

PDR

l.

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for July,1996 l

The unit operated at an average reactor power level of 49.5% having experienced a forced outage during the period.

i I

I l

l I.

J l

4 in.

Page id6 i

9 PRESSURIZER SAFETY VALVE j

FAILURES AND CHALLENGES WATERFORD 3 for July,1996 There were no pressurizer safety valve failures or challenges experienced during the month.

E'13aab Page 2 of 6

OP.ERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 COMPLETED BY :

D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS

1. Reporting Period July,1996 Gross Hours in Reporting Period 744
2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :

1,075 Design Electrical Rating (Net MWe) 1,104

3. Power Level to which Restricted (if any) (Net MWe)

N/A

4. Reason for Restriction (if any)

NIA THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Critical 369.1 4,702.8 80,735.5
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
7. Hours Generator was On-line 369.1 4,677.7 79,763.9
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 1,247,706 15,843,011 264,539,452
10. Gross Electrical Energy Generated (MWH) 418,850 5,352,540 88,210,910
11. Net Electrical Energy Generated (MWH) 394,556 5,124,041 84,129,856
12. Reactor Service Factor 49.6 92.0 84.9
13. Reactor Availability Factor 49.6 92.0 84.9
14. Unit Service Factor 49.6 91.5 83.8
15. Unit Availability Factor 49.6 91.5 83.8
16. Unit Capacity Factor (using MDC) 49.3 93.3 82.3
17. Unit Capacity Factor (using DER) 48.0 90.8 80.1
18. Unit Forced Outage Rate 50.4 8.5 3.7 i

M346 Page : 3 of 6 a

OPERATING DATA REPORT DOCKET NUMBER :

50-382 4

UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 l

l COMPLETED BY :

D. S. Freeman l

TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)

l l

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE i

20. If Shutdown at end of report period, estimated date of startup :

8/5/96

21. Unit is in Commercial Operation.

I THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 5,111 95,136
23. Unit Forced Outage Hours 374.9 433.3 3,1os.s

)

24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120 l
25. If changes occur in capacity ratings (Items 2 and 24) since the last report,

)

l give the reasons :

1 N/A 1

l l

l l

I E'11N6 Page : 4 of 6

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 l

UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 464-3352 l

Reporting Period :

July,1996

( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1

1,090 16 365 2

1,089 17 (21) l 3

1,088 18 (15) 4 1,088 19 (15) 5 1,087 20 (15) l 6

1,086 21 (15) 7 1,086 22 (15) 8 1,084 23 (14) 9 1,086 24 (14) l 10 1,086 25 (14) l 11 1,085 26 (14) 12 1,085 27 (14) 13 1,086 28 (14) 14 1,087 29 (15) 15 1,087 30 (16) 31 (14) l l

lNSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I i

s i

3/13 %

Page 5 of 6

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :

50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 COMPLETED BY :

D. S. Freeman TELEPHONE:

(504) 464-3352 REPORTING PERIOD :

July,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)

Reason Method Corrective Actions 96-02 960716 F

374.9 A

1 All 6 Baffle Bolts to the 2B RCP (Reactor Coolant Pump) broke allowing the Baffle to rub against the Heat Exchanger, and leading to abnormalities in the RCP Seal.

A controlled shutdown of the plant was performed.

Repairs included replacement of the 2B RCP Baffle Bolts, Baffle, Heat Exchanger and Seal. Refer to CR-96-1048 for additional details.

TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative l

2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)

I 5/04 Page. 6 of 6