l ya Ente y Oper:tions. Inc.
KiHona, LA 70066 Tel 504 739 6242 James J. Fisicaro If" W3F1-96-0132 l
A4.05 PR August 14,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of July,1996. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, y c.
7%
/[. Fisicaro v irector Nuclear Safety l
4 JJF/DFL/ssf Attachment
/.
I cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee k\\
N.S. Reynolds
\\
F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INPO Records Center) 160022 NRC Resident inspectors Office 9608160068 960731 PDR ADOCK 05000382 R
l.
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for July,1996 l
The unit operated at an average reactor power level of 49.5% having experienced a forced outage during the period.
i I
I l
l I.
J l
4 in.
Page id6 i
9 PRESSURIZER SAFETY VALVE j
FAILURES AND CHALLENGES WATERFORD 3 for July,1996 There were no pressurizer safety valve failures or challenges experienced during the month.
E'13aab Page 2 of 6
OP.ERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 OPERATING STATUS
- 1. Reporting Period July,1996 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any) (Net MWe)
N/A
- 4. Reason for Restriction (if any)
NIA THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 369.1 4,702.8 80,735.5
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 369.1 4,677.7 79,763.9
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 1,247,706 15,843,011 264,539,452
- 10. Gross Electrical Energy Generated (MWH) 418,850 5,352,540 88,210,910
- 11. Net Electrical Energy Generated (MWH) 394,556 5,124,041 84,129,856
- 12. Reactor Service Factor 49.6 92.0 84.9
- 13. Reactor Availability Factor 49.6 92.0 84.9
- 14. Unit Service Factor 49.6 91.5 83.8
- 15. Unit Availability Factor 49.6 91.5 83.8
- 16. Unit Capacity Factor (using MDC) 49.3 93.3 82.3
- 17. Unit Capacity Factor (using DER) 48.0 90.8 80.1
- 18. Unit Forced Outage Rate 50.4 8.5 3.7 i
M346 Page : 3 of 6 a
OPERATING DATA REPORT DOCKET NUMBER :
50-382 4
UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 l
l COMPLETED BY :
D. S. Freeman l
TELEPHONE: (504) 464-3352 OPERATING STATUS (Cont.)
l l
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE i
- 20. If Shutdown at end of report period, estimated date of startup :
8/5/96
- 21. Unit is in Commercial Operation.
I THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 5,111 95,136
- 23. Unit Forced Outage Hours 374.9 433.3 3,1os.s
)
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120 l
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report,
)
l give the reasons :
1 N/A 1
l l
l l
I E'11N6 Page : 4 of 6
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 l
UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 l
Reporting Period :
July,1996
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,090 16 365 2
1,089 17 (21) l 3
1,088 18 (15) 4 1,088 19 (15) 5 1,087 20 (15) l 6
1,086 21 (15) 7 1,086 22 (15) 8 1,084 23 (14) 9 1,086 24 (14) l 10 1,086 25 (14) l 11 1,085 26 (14) 12 1,085 27 (14) 13 1,086 28 (14) 14 1,087 29 (15) 15 1,087 30 (16) 31 (14) l l
lNSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I i
s i
3/13 %
Page 5 of 6
l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER :
50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : August 13,1996 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 464-3352 REPORTING PERIOD :
July,1996 Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
Reason Method Corrective Actions 96-02 960716 F
374.9 A
1 All 6 Baffle Bolts to the 2B RCP (Reactor Coolant Pump) broke allowing the Baffle to rub against the Heat Exchanger, and leading to abnormalities in the RCP Seal.
A controlled shutdown of the plant was performed.
Repairs included replacement of the 2B RCP Baffle Bolts, Baffle, Heat Exchanger and Seal. Refer to CR-96-1048 for additional details.
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative l
2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
I 5/04 Page. 6 of 6