ML20217G721
| ML20217G721 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/30/1999 |
| From: | Ewing E, Meyers B ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-99-0159, NUDOCS 9910210334 | |
| Download: ML20217G721 (7) | |
Text
.
(~y
'ge Entergy Operations, lac.
17265 River Road I?
Killona. LA 70066 Tel 504 739 6242
. Early C. Ewing lil D clo lear Safety Assurance
(
A4.05 i
PR October 13',1999 I
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPi 'A l
Monthly Operating deport i
' Gentlemen:
Attached is the subject report, which covers the operating statistics for the month of l.
September 1999. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
There are no commitments associated with this' submittal. Should you have any questions regarding the above, please contact T.M. Manzella at (504) 739-3882.
l l
Very truly yours, dhd(
/
~ sIKEWsf)
E.C.' Ewing Director,'
i Nuclear Safety Assurance T
[t ECE/TMM/rtk Attachment -
j j cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.), P. Lewis (INPO Records Center),
)
NRC Resident inspectors Office i
99'10210334 990930'
'PDR ADOCK 05000382 i
R-PDR l
p-j L
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for September,1999 I
The unit operated at an average reactor power level of 36.1% having experienced one manual reactor trip during the period.
lW6Fs9 Page I of 6 u
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES s
WATERFORD 3 for September,1999 There were no pressurizer safety valve failures or challenges experienced during the month.
i l
Uptp99 -
Page 2 of 6
~
OPERATING DATA REPORT DOCKET NUMBER : 50-382 j
s UNIT NAME : WATERFORD 3 DATE OF REPORT : October 6,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504) 739-6426 OPERATING STATUS
- 1. Reporting Period September,1999 Gross Hours in Reporting Period 720
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 27s.0 4,888.5 103,478.o
' 6. Reactor Reserve Shutdown Hours o.o 0.0 0.0
- 7. Hours Generator was On-line 265.7 4,830.7 102,284.3 8.- Unit Reserve Shutdown Hours o.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 880,5s4 15,929,127 339,552,225
'10. Gross Electrical Energy Generated (MWH) 296,038 5,398,804 113,s38,869
- 11. Net Electrical Energy Generated (MWH) 282,842 5,189,992 10s,444,112
- 12. ' Reactor Service Factor 38.s 74.s 84.2
- 13. Reactor Availability Factor 38.6-74.6 84.2
- 14. Unit Service Factor -
36.9 73.7 83.2
- 15. Unit Availability Factor 36.9 73.7 83.2
~ 16.- Unit Capacity Factor (using MDC) 36.5 73.4 82.1
- 17.. Unit Capacity Factor (using DER) -
35.s 71.5 79.9
- 18. Unit Forced Outaga Rate 63.1 12.9 4.4 Hv6N9 Page 3 of 6
~
OPERATING DATA REPORT DOOKET NUF,4BER :
50-382 UNIT NAME : WATEllFORD 3 DATE OF REPORT :
October 6,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE:
(504)739-6426 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours :.1 Reporting Period 720 6,551 122,880
- 23.. Unit Forced Outage Hours 454.3 713.2 4,s7s.8
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, give the reasons :
N/A 1 % 99 Page - 4 of 6
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : October 6,1999 COMPLETED BY : Bruce E. Meyers TELEPHONE: (504) 739-6426 Reporting Period :
September,1999
( NET MWe )
DAY Avg. Power level DAY Avg. Power level 1
1,090 16 0
2 1,097 17 0
3 1,098 18 0
4 1,098 19 0
5 1,098 20 0
6 1,098 21 0
7 1,097 22 0
8 1,098 23 0
9 1,098 24 0
10 913 25 0
11 0
26 0
{
12 0
27 0
)
13 0
28 0
14 0
29 22 15 0
30 977 l
i l
lNSTRUCTIONS -
l l
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Reflects On-Line Net Generation.
i j
i.
..a.
c 1
'l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT :
October 6,1999 COMPLETED BY :
Bruce E. Meyers TELEPHONE :
(504) 739-6426 REPORTING PERIOD :
September,1P99 Outage
~***
Date Duration.
Shutdown Cause, Comments and-Number - (yymmdd) Type (Hours)
Reason Method Corrective Actions 99-04 990910 F
454.3 A
2 Apparent seal failure on Reactor Coolant Coolant Pump 2B caused by cracked baffle which was replaced during the forced outage. For additional details, refer to I
CR-WF3-1999-0927. The outage was extended due to leakage of check valve SI-5128.
Repairs were completed prior to the end of the outage.
For additional details, refer to CR-WF3-1999-1010.
~
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHO_D License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain)
. 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) ww, r.as