Text
__.
Enti gy Oper::tions,Inc.
i Killona, LA 70006 4
Tel 504 739 6242 Early C. Ewing. ill afety & Regulatory Affairs r
W3F1-99-0012 A4.05 PR 1
January 13,1999 s
1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of December,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
I Should you have any qeestions regarding the above, please contact me at (504) 739-6242 or A.L. Lewis J (504) 739-6726.
Very truly yours, E.C. Ewing Director Nuclear Safety & Regulatory Affairs t
1 i
ECE/ALUrtk
/
l Attachment cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
l J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
P. Lewis (INPO Records Center), NRC Resident inspectors Office 9901190189 981231I PDR ADOCK 050003S2 R
pq
)
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 for December,1998 A forced outage which began during the previous month, continued into the first few days of this month, accounting for the average reactor power level of 89.7%.
l I
l
)
Inne Page I of 6 I
\\
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for December,1998 There were no pressurizer safety valve failures or challenges experienced during the month.
1/7M9 Page : 2 of 6
OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575 OPERATING STATUS
- 1. Reporting Period December,1998 Gross Hours in Reporting Period 744
- 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) : _ 1,075 Design Electrical Rating (Net MWe) 1,104
- 3. Power Level to which Restricted (if any)(Net MWe)
N/A
- 4. Reason for Restriction (if any)
N/A THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 694.8 8,046.8 98,589.5
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 683.1 7,967.8 97,453.6
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 9. Gross Thermal Energy Generated (MWH) 2,262,325 26,641,487 323,623,098
- 10. Gross Electrical Energy Generated (MWH) 767,225 9,020,027 108,240,065
- 11. Net Electrical Energy Generated (MWH) 733,749 8,620,783 103,274,120
- 12. Reactor Service Factor 93.4 91.9 84.8
- 13. Reactor Availability Factor 93.4 91.9 84.8
- 14. Unit Service Factor 91.8 91.0 83.8
- 15. Unit Availability Factor 91.8 91.0 83.8
- 16. Unit Capacity Factor (using MDC) 91.7 91.5 82.6
- 17. Unit Capacity Factor (using DER) 89.3 89.1 80.4
- 18. Unit Forced Outage Rate 8.2 8.5 3.9 10/99 Page : 3of6
OPERATING DATA REPORT DOCKET NUMBER : 50482 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE:
(504) 739-6575 OPERATING STATUS (Cont.)
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL OUTAGE #9 - commencing on February 19,1999 - 40 day outage
- 20. If Shutdown at end of report period, estimated date of startup :
N/A
- 21. Unit is in Commercial Operation.
THIS YEAR TO MONTH DATE CUMULATIVE
- 22. Hours in Reporting Period 744 8,760 116,32s
- 23. Unit Forced Outage Hours 60.9 744.s 3,963.s
- 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
- 25. If changes occur in capacity ratings (items 2 and 24) since the last report, give the reasons :
N/A IUM Page : 4 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 739-6575 Reporting Period :
December,1998
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
(29) 16 1,109 2
(40) 17 1,109 3
150 18 1,109 4
624 19 1,109 5
1,056 20 1,109 6
1,102 21 1,109 7
1,104 22 1,109 8
1,106 23 1,109 9
1,106 24 1,109 10 1,107 25 1,108 11 1,105 26 1,108 12 1,108 27 1,109 13 1,109 28 1,111 14 1,109 29 1,110 15 1,109 30 1,109 31 1,110 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
thM9 Page. 5 of 6
.-~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : January 6,1999 COMPLETED BY :
D. S. Freeman TELEPHONE : (504) 739-6575 REPORTING PERIOD :
December,1998 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours) Reason Method Corrective Actions 98-06 981118 F
60.9 A
4 Outage continued from the previous month. Involved RCP 2B seal replacement.
TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative l
2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
\\.