{*,V.! &
=== ENTERGY M*4".A 70066e"'"
Kiliona. l Tel 504 739 6774 R. F. Burski j
Director Nuckal Gatety I
veerte 3 j
i W3F1-95-0065 A4.05-PR l
April 14,1995 l
l U.S. Nuclear Regulatory Commission l
ATTN: Document Control Desk l
Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report i
Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of March, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, R.F. Burski Director Nuclear Safety RFB/CJT/ssf Attachment cc:
L.J. Callan (NRC Region IV)
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INP0 Records Center)
NRC Resident Inspectors Office
'9504180053 950331 PDR ADOCK 05000382
/
R-PDR 8
l 3
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS 1
WATERFORD 3 l
for March,1995 1
The unit operated at an average reactor power level of 99.8% and experienced no shutdowns or significant power reductions during the period.
\\
i l
4 l
i l
o i
t 1
l l
4 4
4 I
- 7/9$
Page : I of 6
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for March,1995 There were no pressurizer safety valve failures or challenges experienced during the month.
&l&$
. Page: 2 of 6
OPERATING DATA REPORT i-DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 4
DATE OF REPORT : April 7,1995 l
COMPLETED BY :
D. S. Freeman l
TELEPHONE : (504) 464-3352 4
h j
.Q, PERATING STATUS i
- 1. Reporting Period :
March,1995 Gross Hours in Reporting Period :
744 i
- 2. Currently Authorized Power Level (MWt):
3,390 Maximum Dependable Capacity (Net MWe) i 1,075 j
Design Electrical Rating (Net MWe) :
j a04
- 3. ' Power Level to which Restricted (if any) (Net MWr) :
N/A
- 4. Reason for Restriction (if any) :
1/A
-m THIS YEAR TO MONTH DATE CUMULATIVE
- 5. Number of Hours Reactor was Critical 744.0 2,160.0 70,882.s
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator was On-line 744.0 2.160.0 70,004.3 j
- 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i
- 9. Gross Thermal Energy Generated (MWH) 2,516,977 7,30s,275 231,637,ss4
- 10. Gross Electrical Energy Generated (MWH) 843,810 2,439,780 77,174,240 I
- 11. Net Electrical energy Generated (MWH) 809,736 2,340,52s 73,582,s94
- 12. Reactor Service Factor 100.0 100.0 s5.0
- 13. Reactor Availability Factor 100.0 100.0 85.0 j
- 14. Unit Service Factor 100.0 100.0 s3.9 I
- 15. Unit Availability Factor 100.0
- 100.0 83.9
- 16. Unit Capacity Factor (using MDC) 101.2 100.8 s2.0 i
- 17. Unit Capacity Factor (Using DER) 98.6 98.2 79.9
- 18. Unit Forced Outage Rate 0.0 0.0 3.1 i
4'7/95 Page: 3 of 6 m--
A m
p
-3
4 1
OPERATING DATA REPORT DOCKET NUMBER : 50-382 i
UNIT NAME : WATERFORD 3 DATE OF REPORT : April 7,1995 COMPLETED BY :
D. S. Freeman
]
TELEPHONE: (504) 464-3352 i
OPERATING STATUS (Cont.)
I i
- 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
REFUEL - September 15,1995 - 60 Days j
- 20. If Shutdown at end of report period, estimated date of startup: N/A-s
- 21. Unit in Commercial Operation THIS YEAR TO I
MONTH DATE CUMULATIVE 1
l
- 22. Hours in Reporting Period 744 2,160 83,425
- 23. Unit Forced Outage Hours 0.0 0.0 2,210.2 i
4
- 24. Nameplate Rating (Gross MWe) :
1,200 l
Max. Dependable Capacity (Gross MWe) :
1,120 i
- 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, i
j give the reasons :
N/A a
a t
(
N ess r.a : 4 d e
i.
i
~
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NUMBER :
50-382
]
UNIT NAME :
WATERFORD 3 DATE OF REPORT : April 7,1995 COMPLETED BY :
D. S. Freeman i
TELEPHONE:
(504) 464-3352 Reporting Period :
March, 199.{,
DAY Avg. Power Level DAY Avg. Power Level l
1 1,090 16 1,090 l
2 1,090
.17 1,091 3
1,090 18 1,091 4
1,091 19 1,091 5
1,091 20 1,091 6
1,090 21 1,091
]
7 1,091 22 1,091 j
8 1,090 23 1,090 9
1,091 24 1,090 i
10 1,091 25 1,035 11 1,091 26 1,089 12 1,090 27 1,091
]
13 1,091 28 1,090 14 1,091 29' 1,091 3
15 1,091 30 1,091 j
31 1,079
)
INSTRUCTIONS :
{
On this form, list the average daily unit power level in MWe-Net for each day in the j
reportmg month. Compute to the nearest whole megawatt.
i i
r i
j f
[
mm w.r.
m er-e-
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME. WATERFORD 3 DATE OF REPORT : April 7,1995 COMPLETED BY :
D. S. Freeman TELEPHONE: (504) 464-3352 REPORTING PERIOD :
March,1995 Shutdown Cause, Comments and Date Duration Number (yymmdd)
Type (Hours)
Reason Method Corrective Actions I
NONE i
a na l
TYPE REASON F - Forced A - Equipment Failua (explain) l S - Scheduled B - Meantenance or Test C - Refueling D - Regulatory Restriction l
E - Operator Training and a**
METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) j
@ 95 Page: 6 of 6
('