Monthly Operating Repts for Mar 1993 for Turkey Point Units 3 & 4,per Guidance of NUREG-0020.W/930413 Ltr
ML17349A806
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1993
From: Herbenick G, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0020, RTR-NUREG-20 L-93-94, NUDOCS 9304220346
Download: ML17349A806 (17)


Text

ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G.

PLUNKETT,T.F.

Florida Florida Power  !'ight Power & Light Co.

Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl'y operating repts for Mar 1993 for Turkey Point Units D 3 a 4,per guidance of NUREG-0020.W/930413 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

.TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 RR/DORP/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EGSrG BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

0

fe P.O. Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DE C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

T. F. Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant

'9304220346 930331 PDR ADOCK 05000250 R PDR an FPL Group company

) Ql) (>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT ¹3 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 699 03/02/93 696 03/03/93 692 03/04/93 691 03/05/93 544 03/06/93 378 03/07/93 378 03/08/93 642 03/09/93 688 03/1 0/93 689 03/1 1/93 684 03/1 2/93 681 03/1 3/93 689 03/1 4/93 704 03/1 5/93 707 03/1 6/93 706 03/17/93 701 03/1 8/93 386 03/1 9/93 687 03/20/93 699 03/21/93 697 03/22/93 693 03/23/93 695 03/24/93 652 03/25/93 689 03/26/93 690 03/27/93 689 03/28/93 688 03/29/93 691 03/30/93 687 03/31/93 685

I

p. N

~ "i

OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/ 8/93 COMPLETED BY G. D. Herbonhck TELEPHONE 305/246-7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MARCH 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 178137. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2043.9 114803.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 2007.5 113118.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1557074 4305713 234212640
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 511385 1419340 75061466
18. NET ELECTRICAL ENERGY GENERATED (MWH) 487162 1351108 70963268
19. UNIT SERVICE FACTOR 100.0 92.9 63.5
20. UNIT AVAILABILITYFACTOR 100.0 92.9 63.6
21. CAPACITY FACTOR (USING MDC NET) 98.3 93.9 60.9
22. CAPACITY FACTOR (USING DER NET) 94.5 90.3 57.5
23. UNIT FORCED OUTAGE RATE 0.0 7.1 12.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: APRIL 08 1993 COMPLETED BY: G. D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours)

Reason* Method of Shutting Event Reactor'icensee Down Ropoztf Syston Code'ause Code'onponent C Corrective Action to Prevent Recurrence 05 930305 0.00 N/A HH POMP XX 38 STEAM GENERATOR FEEDWATER PVMP 06 930318 0.00 N/A HC HTEXCH WATERBOX CLEANING F Forced

- Reason

- Equipment Failure Method

- Exhibit G Instructions Exhibit 1 - sano Source s scheduled A 1 Manual for Pzeparation of Data 8 Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 Auto.wtic Sczan Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training s 5 Load Reduction License Exanination 9 Other (Explain)

F Administrative G Opozational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55% power to repair the 3B Steam Generator Feedwater Pump.

On March 8, Unit 3 increased reactor power to 100%.

On March 18, Unit 3 commenced load reduction to 40% power for Main Turbine valve testing and condenser waterbox cleaning.

On March 19, Unit 3 increased reactor power to 100%.

Unit 3 essentially maintained 100% power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT ¹4 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 691 03/02/93 690 03/03/93 688 03/04/93 686 03/05/93 687 03/06/93 686 03/07/93 684 03/08/93 684 03/09/93 688 03/1 0/93 686 03/1 1/92 680 03/1 2/93 678 03/1 3/93 683 03/1 4/93 698 03/1 5/93 702 03/1 6/93 700 03/1 7/93 694 03/1 8/93 688 03/1 9/93 684 03/20/93 683 03/21/93 679 03/22/93 676 03/23/93 680 03/24/93 677 03/25/93 674 03/26/93 674 03/27/93 674 03/28/93 672 03/29/93 677 03/30/93 678 03/31/93 674

OPERATING DATA REPORT DOCKET NO 50 - 25I DATE 4/ 8/93 COMPLETED BY G. D. Herbenick TELEPHONE 305/246-7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MARCH 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET 'MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD: 744 2160 171869. 0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160. 0 111998. 6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 744.0 2151.9 108197. 2 I5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1636770 4693143 228267478
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 533115 1526625 72885595
18. NET ELECTRICAL ENERGY GENERATED (MWH) 508628 1456246 68945187
19. UNIT SERVICE FACTOR 100.0 99.6 63.0
20. UNIT AVAILABILITYFACTOR 100.0 99.6 63.3 2'I. CAPACITY FACTOR (USING MDC NET) 102.6 101. 2 61.3
22. CAPACITY FACTOR (USING DER NET) 98.6 97.3 57.9
23. UNIT FORCED OUTAGE RATE 00.0 0.4 11.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENANCE OUTAGE ON APRIL 10, 1993.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO. 50-251 UNIT NAME'URKEY POINT UNIT 4 DATE: APRIL 08 1993 COMPLETED BY: G.D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No. Date Type Duration Reasons Nethod of Licensee Systen Component cause s corrective (Hours) Shutting Event Codes Action to Down Reports Code'/A Prevent Recurrence Reactor'/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit - Instructions Exhibit - source s scheduled A Equipnent Failure 1 - Ywnual G

for Preparation of Data 1 Sa=e B - Naintenance or Test 2 - Nwnual Scran Entry Sheets Licensee C - Refueling 3 Autcmatic Scrau Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training S 5 Load Reduction License Exanination 9 Othez (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)

(o

~

~

l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE A rilBY:G.D.Herbenick COMPLETED 08 1993 TELEPHONE: 305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100% power for the month of March.

0 0 ~ ~

~

~

\

p it I'