ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HERBENICK,G.

Florida Power !'ight Co.

PLUNKETT,T.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl'y operating repts for Mar 1993 for Turkey Point Units 3

a 4,per guidance of NUREG-0020.W/930413 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

.TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVAN,L INTERNAL: AEOD/DOA RR/DORP/OEAB EG FILE 01 EXTERNAL: EGSrG BRYCEiJ.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

0

fe P.O. Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DE C.

20555 Gentlemen:

RE:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3

and 4

Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

T. F. Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector,

USNRC, Turkey Point Plant

'9304220346 930331 PDR ADOCK 05000250 R

PDR an FPL Group company

) Ql) (>5,'8

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT ¹3 APRIL 08 1993 G. HERBENICK 305-246-7112 MONTH MARCH 1993 AVERAGE DAILYPOWER LEVEL (MWe-Net) 03/01/93 03/02/93 03/03/93 03/04/93 03/05/93 03/06/93 03/07/93 03/08/93 03/09/93 03/1 0/93 03/1 1/93 03/1 2/93 03/1 3/93 03/1 4/93 03/1 5/93 03/1 6/93 03/17/93 03/1 8/93 03/1 9/93 03/20/93 03/21/93 03/22/93 03/23/93 03/24/93 03/25/93 03/26/93 03/27/93 03/28/93 03/29/93 03/30/93 03/31/93 699 696 692 691 544 378 378 642 688 689 684 681 689 704 707 706 701 386 687 699 697 693 695 652 689 690 689 688 691 687 685

I

p. N

~ "i

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/ 8/93 COMPLETED BY G.

D. Herbonhck TELEPHONE 305/246-7112 1.

UNIT NAME: TURKEY POINT UNIT 3 2.

REPORTING PERIOD:

MARCH 1993 3.

LICENSED THERMAL POWER (MWT):

2200 4.

NAMEPLATE RATING (GROSS MWE):

760 5.

DESIGN ELECTRICAL RATING (NET MWE):

693 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

699 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10.

REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE 11.

HOURS IN REPORT PERIOD:

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENERATOR ON-LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.

NET ELECTRICAL ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

CAPACITY FACTOR (USING MDC NET) 22.

CAPACITY FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3.

744 744.0 0.0 744.0 0.0 1557074 511385 487162 100.0 100.0 98.3 94.5 0.0 2160 2043.9 0.0 2007.5 0.0 4305713 1419340 1351108 92.9 92.9 93.9 90.3 7.1 178137. 6 114803.2 844.4 113118.3 121.8 234212640 75061466 70963268 63.5 63.6 60.9 57.5 12.4 25.

IF SHUT DOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF STARTUP:

4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNIT NAME:

TURKEY POINT UNIT 3 DATE:

APRIL 08 1993 COMPLETED BY: G.

D.

HERBENICK TELEPHONE:

305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours)

Reason*

Method of Shutting Down Reactor'icensee Event Ropoztf Syston Code'onponent Code'ause C Corrective Action to Prevent Recurrence 05 06 930305 930318 0.00 0.00 N/A N/A HH HC POMP XX HTEXCH 38 STEAM GENERATOR FEEDWATER PVMP WATERBOX CLEANING F Forced s - scheduled Reason A - Equipment Failure 8 Maintenance or Test C - Refueling D Regulatory restriction E Operator Training s License Exanination F Administrative G Opozational Error (Explain)

H Other (Explain)

Method 1 - Manual 2 - Manual Scran 3 Auto.wtic Sczan 4 - Continued 5 Load Reduction 9 Other (Explain)

Exhibit G Instructions for Pzeparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - sano Source

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3

DATE A ril 08 1993 COMPLETED BY:G. D. Herbenick TELEPHONE:

305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55% power to repair the 3B Steam Generator Feedwater Pump.

On March 8, Unit 3 increased reactor power to 100%.

On March 18, Unit 3

commenced load reduction to 40%

power for Main Turbine valve testing and condenser waterbox cleaning.

On March 19, Unit 3 increased reactor power to 100%.

Unit 3 essentially maintained 100% power for the remainder of the month.

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT ¹4 APRIL 08 1993 G. HERBENICK 305-246-7112 MONTH MARCH 1993 AVERAGE DAILYPOWER LEVEL (MWe-Net) 03/01/93 03/02/93 03/03/93 03/04/93 03/05/93 03/06/93 03/07/93 03/08/93 03/09/93 03/1 0/93 03/1 1/92 03/1 2/93 03/1 3/93 03/1 4/93 03/1 5/93 03/1 6/93 03/1 7/93 03/1 8/93 03/1 9/93 03/20/93 03/21/93 03/22/93 03/23/93 03/24/93 03/25/93 03/26/93 03/27/93 03/28/93 03/29/93 03/30/93 03/31/93 691 690 688 686 687 686 684 684 688 686 680 678 683 698 702 700 694 688 684 683 679 676 680 677 674 674 674 672 677 678 674

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 - 25I DATE 4/ 8/93 COMPLETED BY G.

D. Herbenick TELEPHONE 305/246-7112 1.

UNIT NAME: TURKEY POINT UNIT 4 2.

REPORTING PERIOD:

MARCH 1993 3.

LICENSED THERMAL POWER (MWT):

2200 4.

NAMEPLATE RATING (GROSS MWE):

760 5.

DESIGN ELECTRICAL RATING (NET 'MWE):

693 6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

699 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

666 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED

~

IF ANY (NET MWE) 10.

REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY

-YTD-CUMULATIVE ll. HOURS IN REPORT PERIOD:

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 13.

REACTOR RESERVE SHUTDOWN HOURS 14.

HOURS GENERATOR ON-LINE I5. UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MWH) 17.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 18.

NET ELECTRICAL ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 2'I.

CAPACITY FACTOR (USING MDC NET) 22.

CAPACITY FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENA 744 744.0 0.0 744.0 0.0 1636770 533115 508628 100.0 100.0 102.6 98.6 00.0 171869. 0 111998. 6 166. 6 108197. 2 577.3 228267478 72885595 68945187 63.0 63.3 61.3 57.9 11.7 2160 2160. 0 0.0 2151.9 0.0 4693143 1526625 1456246 99.6 99.6 101. 2 97.3 0.4 NCE OUTAGE ON APRIL 10, 1993.

25.

IF SHUT DOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO.

50-251 UNIT NAME'URKEY POINT UNIT 4 DATE:

APRIL 08 1993 COMPLETED BY: G.D.

HERBENICK TELEPHONE:

305 246-7112 REPORT MONTH MARCH 1993 No.

N/A Date N/A Type N/A Duration (Hours)

N/A Reasons N/A Nethod of Shutting Down Reactor'/A Licensee Event Reports N/A Systen Code'/A Component Codes N/A N/A cause s corrective Action to Prevent Recurrence F - Forced s scheduled Reason A Equipnent Failure B - Naintenance or Test C - Refueling D Regulatory restriction E Operator Training S

License Exanination F - Administrative G Operational Error (Explain)

H - Other (Explain)

Method 1 - Ywnual 2 - Nwnual Scran 3 Autcmatic Scrau 4 - Continued 5 Load Reduction 9 Othez (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Sa=e source

(o

~

~

l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4

DATE A ril 08 1993 COMPLETED BY:G.D.Herbenick TELEPHONE:

305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100% power for the month of March.

0 0

~

~

~

p

~

\\

it I'