MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903042005-04-0808 April 2005 March 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0508903502005-03-11011 March 2005 February 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0505302232005-02-0909 February 2005 January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant ML0501902012005-01-0707 January 2005 December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant ML0436303412004-12-10010 December 2004 November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0432203622004-11-10010 November 2004 October 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0428804842004-10-0808 October 2004 September 2004 Monthly Report for R E Ginna Nuclear Power Plant ML0426600732004-09-10010 September 2004 August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0423105522004-08-10010 August 2004 July 2004 Monthly Operating Report for R E Ginna ML0420803112004-07-0909 July 2004 June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0417406162004-06-10010 June 2004 May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0413404292004-05-10010 May 2004 April 2004 Monthly Operating Report, R. E. Ginna Nuclear Power Plant ML0411305012004-04-0909 April 2004 March 2004 Monthly Operating Report for Ginna Nuclear Power Plant ML0407607272004-03-0909 March 2004 February 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0404905182004-02-0909 February 2004 January 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0402104802004-01-0909 January 2004 December 2003 Monthly Operating Report for R E Ginna Nuclear Power Plant ML0335002382003-12-0909 December 2003 November 2003 Monthly Operating Report for R.E. Ginna ML0332400652003-11-10010 November 2003 October 2003 Monthly Report for R. E. Ginna Nuclear Power Plant ML0328804542003-10-0909 October 2003 September 2003 Monthly Operating Report for R. E. Ginna ML0326610622003-09-10010 September 2003 August 2003 Monthly Operating Report Ginna Nuclear Power Plant ML0322704182003-08-0707 August 2003 July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0319804382003-07-10010 July 2003 June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0316812672003-06-10010 June 2003 May 2003 Monthly Operating Report for R.E. Ginna ML0314006772003-05-0909 May 2003 April 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0314005802003-05-0909 May 2003 September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0310704452003-04-10010 April 2003 March 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0307704542003-03-10010 March 2003 February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0305202172003-02-10010 February 2003 January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0301706072003-01-10010 January 2003 December 2002 Monthly Operating Report for R. E. Ginna ML0235205042002-12-0909 December 2002 November 2002 Monthly Operating Report for R.E. Ginna ML0231900622002-11-0808 November 2002 October 2002 Monthly Operating Report for R.E. Ginna ML0229000102002-10-0909 October 2002 September 2002 Monthly Operating Report for R.E. Ginna ML0226006432002-09-10010 September 2002 August 2002 Monthly Operating Report for R. E. Ginna ML0223102702002-08-0707 August 2002 July 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0221203692002-07-12012 July 2002 June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0217101442002-06-10010 June 2002 May 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant, Revision ML0215004232002-05-17017 May 2002 April 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0214204182002-05-0606 May 2002 April 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0210904432002-04-10010 April 2002 March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0208604272002-03-0808 March 2002 February 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0205802142002-02-11011 February 2002 January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0203504532002-01-10010 January 2002 December 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML18142B3881976-02-0909 February 1976 R. E. Ginna - Forwards Revised (Item #6) Operating Data Report for Month of January 1976 ML18142B3891976-02-0606 February 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976 ML18142B3901976-01-0808 January 1976 R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975 ML18142B3911976-01-0808 January 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975 ML18142B3921975-12-0404 December 1975 R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975 ML18142B3931975-11-0606 November 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975 ML18142B3941975-10-0202 October 1975 R. E. Ginna - Forwards Operating Status Information for Month of September 1975 ML18142B3951975-09-0505 September 1975 R. E. Ginna - Forwards Operating Status Information for Month of August 1975 2005-04-08
[Table view] |
Text
MONTHLY " PORTS iFOR GRAY BOOK PREPARATT0%
NRC bsoTRIBUTION FOR PART 50 DOCKE .'IATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE MONTHLY REPORT FILE oc ester Gas & Elec. C rg,qTEOF DOC DATE R EC'D LTR TWX RPT .OTHER Rochester; N.Y. s C.E. P1att ORIG CC OTHER NRC 1 Si ned LO CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX DESCRIPTION: ENCLOSURES:
'Ltr trans the following: Monthly Report for DeCember 1975 Plant & Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.
NUMBER OP COPIES REC'D:
PLANT NAME:
FOR ACTION/INFORMATION BUTLER (L) SCHWENCER (L) ZIEMANN (L) BEGAN (E)
W/ Copies W/ Copies W/ Copies Vil/ Copies +0 NOT REMO~
CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
\A// Copssss W/ Copies
'ARR (L) VASSALLO (L)- KNIGHTON (Ei SPELS W/ Copies W pies W/. Copies W/ Copies KNtEt (L) RPLE (L) YOUNGBLOOD (E)>> MIPC/PE W/ Copies W/ Copies W/ Copies W,4 Copies tNTERNAL DtSTRIBUTION G FI TECH REVIEW DENTON LIC ASST A/T I ND ~
~NR DR SCHROEDER GRIMES R. DIGGS (L) 8 RAITMAN OGC, ROOM P-506A. MACCARY GAMM ILL H. GEAR IN (L) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNER E. GOULBOURNE (L) MELTZ CASE PAWLICKI BALLARD P. KREUTZER (E)
BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER {L) {Ltr)
/ SHAO STE LLO HOUSTON NOVAK ROSS IPPOLI TO SPANGLER FNVIRO MULLER DICKER KNIGHTON
'. J. LEE (L)
M. RUSHBROOK S. REED (EI M.
.
S (L)
VICE (t )
SHEPPARD (L)
SLATER (E)
PLANS
~MCDONALD
~CHAPMAN DUBE (Ltr)
E. COUP.E PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS(E) E ISENHUT FI I.F. 6 REGION (2) BENAROYA V. WILSON (L) Wl GG INl ON VOLLMER HARLESS R. INGRAM (L)
STEELE M DUN A~N K. PARRISH L EXTERNAL DISTRIBUTION
~1 LOCAL PDR~~Mm Rochester, N.Y.
P D R-SAN/LA/NY
~'l TIC (ABERNATHY) (1}(2)('IO) NATIONALLABS 1
~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 BROOKIHAVEN NAT LAB 1 ASLB 1 CONSULTANTS s 1 G. ULRIKSON, ORNL 1 Newton Anderson NEWMARK/BLUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)
ACRS HOLDING/SENT Rm B-127.GT 1 J. D. RUNKLES, Rm E-201 GT
P ~
', t ZW/// SIXES
//I/IIII'ZFiH':
/ ////I//8'///I///////
ROCHESTER GAS AND ELECTRIC CORPO T AVENUE, ROCHESTER, N.Y. 14649 cj TELEIIHONE URIEL AREA coDE 7ld 546-2700 Ginna Station JP, ge.lBES.>~- January 8, 1976
~ReguTatorP
.r 'Ajtk.N<'irector,
~
1 Office of Inspection and Enforcement (P i l U. S. Nuclear Regulatory Commission /N Washington, D. C. 20555 e
Subject:
Monthly Report for December, 1975 (Revised)
Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.1c attached herewith is a re-vised unit shutdown and power reduction data sheet, to correct previous error in reporting reasons for reductions in reactor power levels on 12/13, 12/21 and 12/23.
Very truly yours, gtP Charles E. Platt Superintendent CEP:fah Attachments 1
cc: Mr. James P. O'Reilly, NRC (1)
Mr. William G. McDonald, NRC (2)
t I
11
DOCKET NO. 50-244
SUMMARY
- The reactor power levels averaged GINNA STATION, UNIT PI 99% during the period. The major exceptions were the power reduc- January 8, 1976(Revision)
DATE tions and Outage 814 detailed below. COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE Ext. 291-214, at Ginna REPORT MONTH UNIT SHUTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION CORRECTIVE ACTIONS/COMMENTS THE REACTOR OR NO. DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)
N/A 75 12 13 Reactor power level reduction to~47%=to perform T-'8B, Turbine Main Steam Stop Valves test.
N/A 75 12 21 A Reactor power level reduction to ~ 47% to perform M-54.2, Check condenser 1B-1 Water Box for Leaks with Freon.
N/A 75 12 23 A Reactor power level reduction to~47% to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.
14 75 12 30 43.75 "B" Steam Generator Tube Leak See Note)
NOTE: Unit remained shutdown through the end of report month.
(I) REASON: (2) METHOD:
A - EOUIPMENT FAILURE (EXPLAIN) I - MANUAL B - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN) .
+Power reductions were not previously reported. Data not available. Commencing January 1, 1976, this data wig bp pegprteg.~9
0 L'~,
DOCKET RO. 50-2i:C 5!ARY I The reactor power levels averaged UVIT RAvE GIRRA STATlos, UR'T AI 99Z durirg the period. The ma)or exceptions vere the power reduc- DATE January 8, 1976(Revision) tions and Oueage F'14 deeailed be'v. COMPLETED SY Andzev E. McNamara, Operations Aide TELEPHONE -7 4 Ext. 291-214, at Ginra REPORT MONTH UNIT S-uTDOIY'N AND POWER REDUCTIONS METHOD OF TYP E SHUTTING DOWN F-FORCED DURAT I OiN THE REACTOR OR CORRECT I VE ACT I ONS/COLNENTS NO. DATE S-SCHEDUI.ED (HOURS) REASON (I) REDUCING POWER (2)
N/A 75 12 13 Reactor power level reduction toL 47Z to perform T-18B, Turbine venin Seeam Stop Ualves test.
N/A 75 12 21 0 Reactor power level reduction to '47Z to perform M-54.2, Check condenser 1B-1 Mater Box for Leaks vith Freon.
N/A 75 12 23 Reactor power level reduceion to I47Z to perform N-54.2, Check condenser 1B-1 Mater Box for Leaks, with Freon.
75 12 30 43.75 "B" Steam Generator - Tube Leak See Note)
NOTE: Unit remained shutdown thzough the end of zeport onth.
(I) REASORI (2) MEiHOOI A EOUIPME .T FAILURE (EXPLAIII) I VARUAL S MAINT. OR TEST 2 - MARUA'cRAv.
C - REFUELING 3 - AUTOVATIC SCRAM 0 - REGUlATORY RESTRICTION 4 - OTHER (EXPLAIN)
E OPERATOR TRAII<IRG ARO lICEiiSE EXAvlRATIOR F - ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)
H OTHER (EXPL*III)
RPower reducti'ons were not previously reported. Data not available. Commencing Januazy 1, 1976, this data I
>
DOCKET NO. 50-244 PIARYI The reactor power levels averaged GIMNA STATION OMIT >
~ .
DOCKET NO. 50-244 DIARYI The reactor pover levels averaged UNIT NAME GINNA STATIDN. UNIT <I 99Z during the period. The ma)or exceptions 'were the power reduc- DATE January 8, 1976(Revision) tions and Outage 814 detailed belov. COVPLETEO SY Andrew E. McNamara, Operations Aide TELEPHONE 7 6- 4 Ext. 291-214, at Ginna REPORT MONTH UNIT SI-QTDOWN AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COAIVENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)
N/A 75 12 13 0 B Reactor power level reduction to~47Z to perfo~ T-18B, Turbine Yogin Steam Stop Valves test.
N/A 75 12 21 0 Reactor power level reduction to '47Z to perform iM.-54.2, Check condenser 1B-1 Mater Box for Leaks with Freon.
N/A 75 12 23 0 Reactor power level reduction to~47Z to perform if-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon.
14 75 12 30 43.75 "B" Steam Generator Tube Leak See Note) NOTE: Unit remained shutdown through the end of report onth.
(I) REASON! (2) METNODI A - EQUIPME::T FAILURE (EXPLAIN) I - VasuaL D - MAINT. OR TEST 2 - MANUA'cRav.
C - REFUELING 3 - AUTGvaTIc scpav D - REGULATORY RESTRICTION 4 - OTNER (EXPLA!N)
E OPERATOR TRAINING ANO I.ICENSE EXAMINaTION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H OTIIER'(EXPLAIN)
~power reductions were not .previouslv reported. Data not available. Connencing January 1, 1976, this data wiQ bp,ge@rte>'c The reactor power levels averaged UNIT NAVE GINNA STATION, UNIT AI 99K during the period. The na)or exceptions were the power reduc- DATE January 8, 1976(Revision) tions and Outage J)14 detailed below. COMPLETED 8Y Andrew E. McNamara, Operations Aide TELEPHONE 7 4 Ext. 291-214, at Ginna REPORT MONTH UNIT S.uTDOWN AND POWER REDVCTI(NS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECT I VE ACT I ONS/CO.'i'MENTS NO.
"
DATE S-SCHEDUI.ED (HOURS) REASON (I) REDUCING POWER (2)
N/A 75 12 13 0 B Reactor power level reduction toL"47X to perform T-18B, Turbine Main Steam Stop Valves test.
N/A 75 12 21 0 Reactor power level reduction to ~ 47X to perform M-54.2, Check condenser lB-1 Water Box for Leaks with Freon.
N/A 75 12 23 S. 0 A Reactor power level reduction to I47/ to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.
14 75 12 30 43.75* "B" Steam Generator - Tube Leak See Note)
NOTE: Unit remained shutdown through the end of report =anth.
(I) REASON: (2) METHOOr A - EOUIPMENT FAILURE (EXPLAIN) I - MANUAL 8 - MAINT. OR TEST 2 MANUAL scRAV C - REFUELING 3 AU OuATIC SCRAu D - REGVLATORY RE'STRICTION 4 - OTHER (EXPL*III)
F. - OPERATOR TR*INI:IG ANO LICENSE EXAul>>lATION F - ADMINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAI.'I)
~Power reductions were not previously reported. Data not aVailable. CODmreneing January 1, 1976, thiS data WiQ bp pep>rtegr
t O.
DOCKET NO.
50-24'.!ARY I The reactor pover levels averaged UNIT NAME GLNVA STATIOV, UNIT LI 99X during the period. The ma)or exceptions vere the power reduc- DATE January 8, 1976(Revision) tions and Outage II14 detailed below. COMPLETED SY Andrew E. McNamara, Operations Aide TEIEPHONE -7 - 4 Ext. 291-214, at Ginna REPORT MONTH UNIT 3-uTDOII AND POWER REDUCTIONS METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECT I VE ACTIONS/COIN!ENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)
N/A 75 12 13 0 B Reactor power level reduction to'A 47X to perform T-18B, Turbine venin Steam Stop Ualves test.
N/A 75 12 21 0 Reactor power level reduction to '47K to perform )(-54.2, Check condenser 1B-1 Water Box for Leaks vith Ereon.
N/A 75 12 23 0 Reactor power level reduction to~47X to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.
14 75 12 30 43.75 "B" Steam Generator - Tube Leak See Note) of report onth.
NOTE: Unit remained shutdown through the end (I) REASOV:
A EOUIPAtE;:T FAILURE (EXPLAIN) 8 - MAINT. OR TEST C - REFUELING D - REGULATORY RESTRtCTION E OPERATOR TRAINING AND LICENSE EXAMINATION F ADAIINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
~Power reductions vere not previously reported. Data not available. Commencing January 1, 1976, this data viQ bp,ge@rtegt>>
~ .
> A
DOCKET NO. 50-244
'MARY: The reactor power levels averaged UV I 'T VAilE Gl NNA STA'Tl OV, UV I ~ >
DOCKET NO. 50-2(4 t.'!PRY I The reactor power levels averaged UVIT VAvE GINVA STATIOV. ~ v! T =',
99X during the period. The ma)or exceptions vere the power reduc- DATE January 8, 1976(Revision) tions and Outage f14 detailed below. COMPLETED 8Y Andrew E. McNamara, Operations Aide TELEPHONE 4 Ext. 291-214, at Ginna REPORT NORTH UNIT SI-IUTOOWiil AND POWER RFOUCTIGMS METHOD OF TYP E SHUTTING DOIlVN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/CONTENTS DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POPOVER (21 N/A>> 75 12 13 Reactor power level reduction toA"47X to perform T-18B, Turbine Ruin Steam Stop Valves test.
N/A 75 12 21 0 Reactor power level reduction to ~ 47X to perform )(-54.2, Check condenser lB-1 Mater Box for Leaks with Preon.
N/A 75 12 23 0 Reactor power level reduction to~47! to perform H-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon.
14 75 12 30 43.75 "BH Steam Generator - Tube Leak See Note) NOTE: Unit remained shutdown through the end of report onth.
(I) REASOMI (2) A!ETHOD:
A - EOUIPUE::t FAII.ORE (EXPLAIN) I UAVQAI.
8 - MAINT. OR TEST 2 - MANUAL SCPAv.
C - REFUELING 3 - AUTOVATIC SCRAM D - REGULATORY RESTRICTION C - OTHER (EXPLAIN)
E - OPERATOR TRAINING AND LICENSE EXAvIMATIOV F - ADA'llNI STRATI YE G OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPI.AIN)
~power reductions were not previously reported. Data not available. Commencing January 1, 1976, this data w'QT bp ge+rtegt>>
DOCKET NO. 50 AC VARY: The reactor power levels averaged UV IT NAVE GINNA STAT I OV, UN I T ~l 99% during the period. The ma)or exceptions were the power reduc- DATE January 8, 1976(Revision) t'ons and Outage LB14 detailed below. COMPLETED BY Andrew E. McNamara, Operations Aide TELEPMONE 7 4 Ext. 291-214, at Ginna REPORT MONTH uwtT 3.RJTOORM AND POMER REOUCTIGQS hIETHOD OF TYPE SHUTTING DOWN F-FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS/COI'MENTS NO. DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)
N/A 75 12 13 0 Reactor power level reduction toL 47% to perform T-18B, Turbine wain Steam Stop Valves test.
N/A 75 12 21 0 Reactor power level reduction to ~ 47% to perform )(-54.2, Check condenser 1B-1 Water Box for Leaks with Preon.
N/A 75 12 23 0 Reactor power level reduction to~47% to perform "(-54.2, Check condenser 1B-l Water Box for Leaks, with Freon.
14 75 12 30 43.75 A "B" Steam Generator - Tube Leak See Note)
NOTFI Unit remained shutdown through the end of repozt onth.
(I) REASON: (2) METNODI A - EOUIPME .T FAILURE (EXPLAIN) I VANDAL B - MAINT. OR TEST 2 - VANUA'CRAV C REFUELING 3 AUTOVATIC SCRAM D - REGULATORY RESTRICTION OTHER (EXPLAIN)
E - OPERATOR TRAltllNG AND LICENSE EXAVINATION F - ADXIINISTRATI YE G OPERATIOVAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
IIPower reductions were not previouslv reported. Data not available. COIImIencing Januazy I, 1976, this data wig bp,gegrtegt
'0 OOCKET NO.50-24C YI The eactor power levels averaged UNIT NAVE GINNA STATION, "NIT <>
Ce