MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903042005-04-0808 April 2005 March 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0508903502005-03-11011 March 2005 February 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0505302232005-02-0909 February 2005 January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant ML0501902012005-01-0707 January 2005 December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant ML0436303412004-12-10010 December 2004 November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0432203622004-11-10010 November 2004 October 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0428804842004-10-0808 October 2004 September 2004 Monthly Report for R E Ginna Nuclear Power Plant ML0426600732004-09-10010 September 2004 August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0423105522004-08-10010 August 2004 July 2004 Monthly Operating Report for R E Ginna ML0420803112004-07-0909 July 2004 June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0417406162004-06-10010 June 2004 May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0413404292004-05-10010 May 2004 April 2004 Monthly Operating Report, R. E. Ginna Nuclear Power Plant ML0411305012004-04-0909 April 2004 March 2004 Monthly Operating Report for Ginna Nuclear Power Plant ML0407607272004-03-0909 March 2004 February 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0404905182004-02-0909 February 2004 January 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0402104802004-01-0909 January 2004 December 2003 Monthly Operating Report for R E Ginna Nuclear Power Plant ML0335002382003-12-0909 December 2003 November 2003 Monthly Operating Report for R.E. Ginna ML0332400652003-11-10010 November 2003 October 2003 Monthly Report for R. E. Ginna Nuclear Power Plant ML0328804542003-10-0909 October 2003 September 2003 Monthly Operating Report for R. E. Ginna ML0326610622003-09-10010 September 2003 August 2003 Monthly Operating Report Ginna Nuclear Power Plant ML0322704182003-08-0707 August 2003 July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0319804382003-07-10010 July 2003 June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0316812672003-06-10010 June 2003 May 2003 Monthly Operating Report for R.E. Ginna ML0314006772003-05-0909 May 2003 April 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0314005802003-05-0909 May 2003 September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0310704452003-04-10010 April 2003 March 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0307704542003-03-10010 March 2003 February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0305202172003-02-10010 February 2003 January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0301706072003-01-10010 January 2003 December 2002 Monthly Operating Report for R. E. Ginna ML0235205042002-12-0909 December 2002 November 2002 Monthly Operating Report for R.E. Ginna ML0231900622002-11-0808 November 2002 October 2002 Monthly Operating Report for R.E. Ginna ML0229000102002-10-0909 October 2002 September 2002 Monthly Operating Report for R.E. Ginna ML0226006432002-09-10010 September 2002 August 2002 Monthly Operating Report for R. E. Ginna ML0223102702002-08-0707 August 2002 July 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0221203692002-07-12012 July 2002 June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0217101442002-06-10010 June 2002 May 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant, Revision ML0215004232002-05-17017 May 2002 April 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0214204182002-05-0606 May 2002 April 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0210904432002-04-10010 April 2002 March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0208604272002-03-0808 March 2002 February 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0205802142002-02-11011 February 2002 January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0203504532002-01-10010 January 2002 December 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML18142B3881976-02-0909 February 1976 R. E. Ginna - Forwards Revised (Item #6) Operating Data Report for Month of January 1976 ML18142B3891976-02-0606 February 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976 ML18142B3901976-01-0808 January 1976 R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975 ML18142B3911976-01-0808 January 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975 ML18142B3921975-12-0404 December 1975 R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975 ML18142B3931975-11-0606 November 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975 ML18142B3941975-10-0202 October 1975 R. E. Ginna - Forwards Operating Status Information for Month of September 1975 ML18142B3951975-09-0505 September 1975 R. E. Ginna - Forwards Operating Status Information for Month of August 1975 2005-04-08
[Table view] |
Text
I(ONTIILY Ie)RTS (FOR GRAY BOOK(REPARATIOII NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM) (P CONTROL NO:
FILF MONTHLY REPORT FILE FROM. Rochester Gas & Elec. Cor 'DATE OF DOC DATE REC'D LTR TWX RPT OTHER
'Rochester, N.Y.
'C.E. Platt 12-4-75 12-11-75 ")Ixx TO: ORIG CC,OTHER SENT AEC PDR SENT LOCAL PDR CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
XXX 1 50-244 DESCRIPTION: ENCLOSURES:
Ltr trans the following: Monthly Rcport for November 1975 Plant 6 Component Operability & Availability This Report to be used in preparing Gray Book by Plans & Operations.
i NUMBER OF COPIES REC'D: 1 PLANT NAME: RE Ginna 0 1 FOR ACTION/INFORMATION SAB 12-12-75, BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPE LS ~CKNOWLEDQED W/ Copies opies -
W/ Copies W/ Copies KNIEL (L) RPLE (L) YOUNGBLOOD (E)~ MIPC/PE W/ Copies W/ Copies W/ Copies W,4 Copies A TA~ ~D% MYHTP v AJ.YPJVTI INTERNAL DISTRIBUTION IL TECH REVIEW DENTON LI C ASST A/T'IND .
~NRC PD SCHROEDER GRIMES R. DIGGS (L) BRAITMAN OGC, ROOM P-506A. MACCARY GAMMILL H. GEARIN (L) SA LTZMAN GOSSI CK/STAFF KNIGHT KASTNER E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KREUTZER (E)
G I AMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. RUSHBROOK {L)- ~ IVICDONALD MOORE(L)
DEYOUNG (L)
HOUSTON NOVAK ENVI RO IVIULLER S. REED (E)
M. SE VICE (L)
~ DUBE (Ltr)
CHAPMAN SKOVHOLT (L) DICKER EPPARD (L) E. COUPE ROSS'PPOLITO PETERSON GOLLER (L) (Ltr) KNIGHTON M. SLATER (E)
P. COLLINS TEDESCO YOUNG B LOOD H. SMITH (L) ,
HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAINAS PROJECT LDR G. WILLIAMS(E) . EISENHUT FII,F. 8 REGION(2) BENAROYA V. WILSON (L) WIGGINTON VOLLMER HAR LESS R. INGRAM (L)
STEELE M DUNCA ~
EXTERNAL DISTRIBUTION LOCAL PDR Lyons and Rochester, N. Y.
~1 TIC (ABERNATHY) (1)(2)(10) NATIONAL LABS 1 PD R-SAN/LA/NY NSIC (BUCHANAN)
' W. PENNINGTON, Rm E-201 GT BROOKHAVEN NAT LAB
~1 CONSULTANTS 1
G. ULRIKSON, ORNL 1 ASLB 1 1 1 Newton Anderson NEWMAR K/B LUME/AGBA8 I AN 1 AGMED (RUTH'GUSSMAN)
ACRS HOLDING/SENT Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT
~ II f I
I II//i7luV A HO I IIIIIIIIII ITALIC,"
/IIIIlIg// ISWil/ ,-l
/I/II/IN II///ii/it/
ROCHESTER GAS AND ELECTRIC CORPORN IO EAST AVENUE, ROCHESTER, N.Y. 14649
'ELEPHONE ARE* coDE lid 546-2700 egufatory GFnnF(P ta t ion apt gg f975 December 4, 1975
< ~>O'RR
~ga&
rP Director, Office of Inspection and Enforcement Pyp, U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Cg~
wPi+ '4 II
Subject:
Monthly Report for November 1975 Operating, Status Information o R. E. Ginna Nuclear Power. Plant Unit No. 1 Docket No. 50-244 Gentlemen:
Pursuant to Technical Specification 6.9.1c attached herewith is the monthly operating status report for Ginna St'ation for the month of November, 1975. Also, ten additional copies of the attachment are enclosed.
C Charles E. Platt P~
Superintendent CEP:fah Attachments cc: Mr. James P. O'Reilly, NRC (1)
Mr. William G. McDonald, NRC (2)
I'
'f
Ss~s OPERATING DATA REPORT 9
DOCKET NO UNIT ¹1 Ginna Station DATE December 4 1975 COMPLETED BY Andrew E. c amara, pera 3.ons Aide
'
~ TELEPHONE Ext: 291-214 at Ginna 0 P E RA TIN G ST ATU 5
- 1. REPORTIHG PERIOD: November ~ 1975 GROSS HOURS IN REPORTIHG PERIOD: 720
- 2. CURRENTLY AUTHORIZED POWER LEVEL(MWI)1 MAX. DEPEND. CAPACITY (MW .H I): 470 DESIGN ELECTRICAL RATING (MW .H I):
- 3. POWER LEVEL TO WHICH RESTRICTEP (IF AHY) (MWa4(et))
~
- 4. REASONS FOR RESTRICTIOH (IF ANY):
THIS MONTH YR To DATE CUMULATIVE B NUMBER OF HOURS REACTOR WAS CRITICAL ......... ~ ~ ~ ~ ~
720 ~6149 40 468.42
- 6. REACTOR RESERVE SHUTDOWN HOURS. 292. 13 292G13~
..
. . . .
- 7. HOURS GENERATOR ON LINE ~
6 010.25 39 212.38
- 8. UNIT RESERVE SHUTDOWN HOURS 0 8.5 8,5%
- 9. GROSS THERMAL ENERGY GENERATED(MWH)....,,...,.... 1 085 784 8 670 259 49 334 578
- 16. GROSS ELECTRICAL ENERGY GENERATED (MWH) ....... 362, 133 2,853,867 16,460, 685
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)...,....,.... 344 991 2 712 655 15 563 817
- 12. REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~, 100% 76.72% 2%
- 13. REACTOR AVAILABILITYFACTOR 100% 80.37% 76.75%
- 14. UNIT SERVICE FACTOR
- 15. UNIT AVAILABILITYFACTOR 100%
100%
72'6.
74.98%
75/
74.4%
74.4%
- 16. UNIT cAPAcITY FAcToR (U ~ I 6 MDO) ................. 101. 9'/ 66.9%
19, UNIT CAPACITY FACTOR (U ~ I 6 D Is MW )......,........ 101 0
9D1 ~2 66. 9/
- 18. UNIT FORCED OUTAGE RATE ~ ~ ~ ~ ~
- 19. SHUTDOWNS SCHEDULED OYER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)1
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP(
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
~ Cumulative Data commencing January 1, 1975, 49 88 REV 10/75
AVERAGE DAILYUNIT POWER LEVEL DOCKET NQ.. 50 244 UNIT III Ginna Station December 4 1975 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-214 at Ginna MON TH November 1 DAY AVERAGE DAILYPOWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (M We-Net) (MWe-Net) 481 17 482 483 18 482 482 481 20 481 482 21 481 22 7 481 23 20 25 10 26 27 12 28 481 13 482 29 480 14 481 30 480 31 16 INSTRUCTIONS On this form, list the average daily unit power level in MWe&et for each.day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum depend-able capacity.'is used for the net electrical rating of the unit, there may'.be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).'In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.-
II P
DOCKET NO. 50-244
SUMMARY
- Reactor Power Levels were maintained G I NNA STAT I ON ~ UN I T O'I at approximately 99.5% during the reporting period. The exceptions were the power reduc- DATE December 4 1975 tions detailed below.
TELEPHONE 1-716-546-2700 Ext. 291-214 at Ginna REP0RT MQNTH November 1975 UNIT SHUTDOWN AND POWER REDUCTIONS.
METHOD OF TYPE SHUTTING DOWN F-FORCED DURATION CORRECTIVE ACTIONS/COMMENTS THE REACTOR OR NO ~ DATE S-SCHEDULED (HOURS) REASON (I) REDUCING POWER (2)
NA 751108 Reactor Power level reduction to perform T-18B, Turbine main steam stop valves test.
NA 751123 0" Reactor power level reduction to
~
92% to perform T-18A, Intercept and reheat stop valves test.
(I) REASON: (2) METHOD:
A - EQUIPMENT FAILURE (EXPLAIN) I - MANUAL 6 - MAINT. OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
E " OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
+ Power reductions were not previously reported. Data not available.
Commencing January 1, 1976"-'his data will be Rill'able.
re F